Loading...
HomeMy WebLinkAbout042 - P0.0 - PLUMBING COVER SHEETPLUMBING LEGENDTHERMOMETER / TEMP GAUGEBALL/ISOLATION VALVECHECK VALVEBUTTERFLY VALVEMANUAL BALANCING VALVESTRAINERREDUCER2 WAY MOTOR OPERATED VALVE3 WAY MOTOR OPERATED VALVESOLENOID VALVEAUTOMATIC BALANCE VALVEBACKFLOW PREVENTER ASSEMBLYPRESSURE REDUCING VALVEPRESSURE REGULATOR VALVESAFETY VALVEVENT THROUGH ROOFDOMESTIC COLD WATER (DCW)DOMESTIC SOFT COLD WATER (DSCW)DOMESTIC HOT WATER (DHW)DOM HOT WATER RETURN (DHWR)VENT (V)SANITARY SEWER (S)SANITARY SEWER UNDER SLAB (S)STORM DRAINAGE (ST)OVERFLOW STORM DRAINAGE (OST)LIQUID REFRIGERANT LINE (RL)SUCTION REFRIGERANT LINE (RS)DISCHARGE REFRIGERANT LINE (RDIS)NATURAL GAS (NG)LIQUIFIED PROPANE GAS (LPG)REVERSE OSMOSIS WATER (RO)DEIONIZED WATER (DI)CONDENSATE DRAIN (CDS)PLUMBING ABBREVIATIONS LEGENDEXISTINGDEMOLISH / REMOVERELOCATENEWAIR CONDITIONING UNITABOVE FINISHED FLOORAUTHORITY HAVING JURISTICTIONARCHITECT or ARCHITECTUREBUILDINGBOTTOM OF PIPEBRITISH THERMAL UNITCUBIC FEET PER HOURCEILINGCONCRETECONNECTIONCONTINUATIONCLEAN OUTCONDENSING UNITDIMENSIONDIRECT EXPANSIONDOMESTICEVAPORATORENTERING WATER TEMPERATUREEXPANSIONFLOOR CLEAN OUTFLOOR DRAINFINISHED FLOORFEET PER MINUTEFEET OF HEADHOT WATER COILLEAVING WATER TEMPERATURENORMALLY CLOSEDNORMALLY OPENPRESSURE DROP / DIFFERENCERECIRCULATION LINEVENT THROUGH ROOFEVAPEWTEXPFCOFDFFFPMFT/HDHWCLWTNCNOPDRECIRCVTR(E)(X)(R)(N)ACUAFFAHJARCHBLDGBOPBTUCFHCLGCONCCONNCONTCOCUDIMDXDOMPLUMBING GENERAL NOTES1. REFER TO SPECIFICATIONS FOR ALL PLUMBING RELATED WORK. ALL WORK SHALL BE IN STRICT ACCORDANCE WITH THE PLANS, SPECIFICATIONS AND MANUFACTURERS WRITTEN INSTRUCTIONS. ALL DEVIATIONS FROM THE PLANS AND/ORSPECIFICATIONS SHALL REQUIRE WRITTEN PRIOR APPROVAL FROM THE ENGINEER.2. SUBMITTALS SHALL BE IN PDF FORMAT ONLY. PARTIAL OR INCOMPLETE SUBMITTALS AND PAPER COPIES WILL NOT BE REVIEWED. SUBMITTALS SHALL BE COMBINED INTO ONE FILE, WITH EACH SECTION LABELED ACCORDING TO ITS RESPECTIVE SPECIFICATION SECTION.3. ALL PLUMBING EQUIPMENT AND SYSTEMS SHALL BE INSTALLED IN ACCORDANCE WITH THE 2018 EDITION OF THE UNIFORM PLUMBING CODE AND THE LATEST EDITION OF ALL LOCAL AND STATE CODES. 4. ALL MECHANICAL AND PLUMBING EQUIPMENT SHALL BE INSTALLED PER THE MANUFACTURER'S RECOMMENDATIONS.5. PLUMBING CONTRACTORS SHALL RECEIVE PRIOR APPROVAL FROM THE STRUCTURAL ENGINEER BEFORE MAKING CUTS THROUGH ANY STRUCTURAL MEMBER.6. PLUMBING CONTRACTORS SHALL COORDINATE INSTALLATION WITH THE GENERAL CONTRACTOR AND WITH ALL OTHER TRADES TO AVOID CONFLICTS.7. THE PLUMBING CONTRACTORS SHALL VERIFY MOTOR VOLTAGES WITH THE ELECTRICAL DRAWINGS BEFORE ORDERING MOTORIZED EQUIPMENT AND CONTROLS.8. ALL MECHANICAL AND PLUMBING EQUIPMENT TO BE SUBSTITUTED FOR THE EQUIPMENT SPECIFIED MUST BE ON THE APPROVED LIST PRIOR TO SUBMITTALS. ALL APPROVED MANUFACTURERS MUST BE CAPABLE OF MEETING THE REQUIREMENTS OF THE SPECIFIED EQUIPMENT.9. LOCATE ACCESS PANELS SO AS TO PROVIDE OPTIMUM SERVICEABILITY TO EQUIPMENT AND/OR VALVING. SEE ARCHITECTURAL SPECIFICATION FOR TYPE AND COLOR. COORDINATE LOCATION WITH STRUCTURAL & GENERAL CONTRACTOR.10. DO NOT RUN ANY PIPING OVER ELECTRICAL PANELS OR GEAR.11. ROUTE ALL PIPIPNG AS TIGHT TO THE STRUCTURE AS POSSIBLE UNLESS OTHERWISE NOTED.12. PENETRATIONS OF FIRE RATED ASSEMBLIES SHALL BE CAULKED/SEALED TO MAINTAIN RATING. (PROTECT AS REQUIRED BY IBC SECTION 713)13. SEE PLUMBING FIXTURE SCHEDULE FOR FIXTURE PIPING CONNECTION SIZES.14. EXACT VENT LOCATIONS TO BE COOORDINATED ON SITE.15. PLUMBING SHOWN IS LOCATED BETWEEN FINISHED FLOOR OF PLAN LEVEL AND THE FINISHED FLOOR OF LEVEL ABOVE UNLESS SPECIFICALLY NOTED.16. PLUMBING IS SCHEMATIC IN NATURE. ACTUAL CONDITIONS MAY VARY. COORDINATE EXACT ROUTE WITH STRUCTURAL, MECHANICAL, ELECTRICAL, ARCHITECTURAL, AND FIRE PROTECTION ELEMENTS AS REQUIRED.17. SEE MECHANICAL SHEET "MECHANICAL AND PLUMBING SPECIFICATIONS" FOR ADDITIONAL DETAILS ON INSTALLATION, MATERIALS, AND APPURTENANCES. GENERAL SYMBOLS 1A 1.XXXXXXXXXKEYED NOTEGENERAL NOTESEQUIPMENT TAGEQUIPMENT NUMBERSECTION REFERENCE NUMBERSECTION REFERENCE SHEETDETAIL REFERENCE NUMBERDETAIL REFERENCE SHEETFIXT - #PLUMBING FIXTURE TAGPOINT OF NEW CONNECTION (POC)POINT OF DISCONNECT (POD)125 NORTH WALLACE AVE.BOZEMAN, MT 59715DATE ISSUED:CURRENT REVISION #: CURRENT REVISION DATE:PROJECT NUMBER:P0.0PLUMBING COVERSHEET2207702 EAST MAIN702 EAST MAIN STREETBOZEMAN, MONTANA 59715SP/CCOA SUBMISSION11/21/2023SHEET LIST - PLUMBINGP0.0 PLUMBING COVER SHEETP1.3 WASTE AND VENT - ROOFP2.2 DOMESTIC WATER AND GAS - MAIN LEVEL