Loading...
HomeMy WebLinkAbout037 - L3.1 - IRRIGATION PLANRENOVATED BUILDING, SEE ARCH E MAIN STREETLIMIT OF WORKLIMIT OF WORKLIMIT OF WORK LIMIT OF WORK C 0.721 1" 0.632 1" 7 L4.1 TREE RING DRIPLINE 6 L4.1 DRIP EMITTER3 L4.1 1" DRIP ZONE KIT 5 L4.1 DOUBLE VALVE BOX CONTRACTOR TO USE 45 DEGREE SWEEPS FOR IRRIGATION SLEEVING. 1 L4.1 INTERIOR POINT OF CONNECTION 2 L4.1 CONTROLLER - WALL MOUNT IRRIGATION MAINLINE TO BE COORDINATED WITH PLUMBING TO PROVIDE STUB OUT ON EAST SIDE OF BUILDING. MAINLINE TO BE FINISHED PLUMBED THROUGH WALLS POINT OF CONNECTION TO BE IN MECHANICAL ROOM THROUGH THE WALL SHUTOFF TO BE PROVIDED ON EXTERIOR OF BUILDING IRRIGATION TO BE PROVIDED TO CITY TREE SLEEVE TYP. CONTROLLER TO BE MOUNTED ON EXTERIOR OB BUILDING. COORDINATE POWER SUPPLY WITH ELECTRICAL. 8 L4.1 RAIN BIRD RAIN SENSOR SYMBOL MANUFACTURER/MODEL/DESCRIPTION QTY RAIN BIRD XCZLF-100-PRF LOW FLOW, 0.2-10 GPM, WITH 1IN. LOW FLOW VALVE VALVE AND 1IN. PRESSURE REGULATING RBY FILTER AND 40PSI PRESSURE REGULATOR. 2 AREA TO RECEIVE DRIP EMITTERS RAIN BIRD XB-PC SINGLE OUTLET, PRESSURE COMPENSATING DRIP EMITTERS. FLOW RATES OF 0.5 GPH=BLUE, 1.0 GPH=BLACK, AND 2.0 GPH=RED. COMES WITH A SELF-PIERCING BARB INLET X BARB OUTLET. 379.9 S.F. Emitter Notes: 20PC emitters (1 assigned to each 5 GAL plant)20 AREA TO RECEIVE DRIPLINE RAIN BIRD XFCV-09-12 XFCV ON-SURFACE LANDSCAPE DRIPLINE WITH A HEAVY-DUTY 3.5 PSI CHECK VALVE. 0.9 GPH EMITTERS AT 12" O.C. DRIPLINE LATERALS SPACED AT 12" APART, WITH EMITTERS OFFSET FOR TRIANGULAR PATTERN. GREAT FOR ELEVATION CHANGE. SPECIFY XF INSERT FITTINGS. 49.4 S.F. SYMBOL MANUFACTURER/MODEL/DESCRIPTION ZURN 375 1" REDUCED PRESSURE PRINCIPLE ASSEMBLY. SIZES 1/2IN.,3/4IN., 1IN., 1-1/4IN., 1-1/2IN., 2IN.. RAIN BIRD ESP4ME3 4 STATION, HYBRID MODULAR OUTDOOR CONTROLLER. FOR RESIDENTIAL OR LIGHT COMMERCIAL USE. LNK WIFI MODULE AND FLOW SENSOR READY. RAIN BIRD RSD-BEX RAIN SENSOR, WITH METAL LATCHING BRACKET, EXTENSION WIRE. IRRIGATION LATERAL LINE: PVC CLASS 200 SDR 21 IRRIGATION MAINLINE: PVC SCHEDULE 40 PIPE SLEEVE: PVC SCHEDULE 40 C #" # Valve Number Valve Size Valve Flow Valve Callout # LIMIT OF WORK NUMBER MODEL SIZE TYPE GPM DESIGN PSI FRICTION LOSS VALVE LOSS PSI PSI @ POC PRECIP 1 RAIN BIRD XCZLF-100-PRF 1"AREA FOR DRIPLINE 0.72 20 0.02 4.4 24.4 38.4 1.4 in/h 2 RAIN BIRD XCZLF-100-PRF 1"AREA FOR DRIP EMITTERS 0.63 20 0.01 4.4 24.4 38.4 0.33 in/h I55I*ATI2N N2TES 1.THIS SYSTEM DESIGN ASSUMES A MINIMUM DYNAMIC PRESSURE FOR THE IRRIGATION SYSTEM OF 40 PSI, AT A MAXIMUM DISCHARGE OF 30 GPM AT THE 1" POINT-OF-CONNECTION. VERIFY PRESSURE AND FLOW ON SITE PRIOR TO CONSTRUCTION. 2.THE IRRIGATION SYSTEM POINT-OF-CONNECTION SHALL BE IN MECHANICAL ROOM IN BUILDING AT SOURCE PROVIDED APPROXIMATE LOCATION SHOWN. INSTALL BACKFLOW PREVENTION/ANTI SIPHON ASSEMBLY PER CITY & STATE BUILDING CODES. VERIFY EXACT LOCATION OF P.O.C. WITH OWNERS REPRESENTATIVE. 3.IRRIGATION MAINLINE TO BE PLUMBED THROUGH BUILDING FROM MECHANICAL ROOM TO PROVIDE STUB OUT ON EAST SIDE OF BUILDING. COORDINATE WITH MECHANICAL, ELECTRICAL, AND PLUMBING TO ENSURE WATER IS PROVIDED ON EAST SIDE. 4.CONTROLLER AT THE APPROXIMATE LOCATION SHOWN. COORDINATE ELECTRICAL POWER TO THE CONTROLLER WITH THE OWNER'S REPRESENTATIVE. CARE SHOULD BE TAKEN TO INSTALL THE IRRIGATION CONTROLLER IN A LOCATION THAT IS ACCESSIBLE FOR MAINTENANCE. FINAL LOCATION TO BE APPROVED BY OWNERS REPRESENTATIVE. 5.COORDINATE UTILITY LOCATES OF ALL UNDERGROUND UTILITIES PRIOR TO CONSTRUCTION. 6.DO NOT PROCEED WITH THE INSTALLATION OF THE IRRIGATION SYSTEM WHEN IT IS OBVIOUS IN THE FIELD THAT OBSTRUCTIONS OR GRADE DIFFERENCES EXIST THAT MIGHT NOT HAVE CONSIDERED IN THE DESIGN PROCESS. IF DISCREPANCIES IN CONSTRUCTION DETAILS, LEGEND, NOTES OR SPECIFICATIONS ARE DISCOVERED, BRING ALL SUCH OBSTRUCTIONS OR DISCREPANCIES TO THE ATTENTION OF THE OWNER'S REPRESENTATIVE. 7.DRAWINGS ARE DIAGRAMMATIC. THEREFORE, THE FOLLOWING SHOULD BE NOTED: A.ALTHOUGH IRRIGATION COMPONENTS MAY BE SHOWN OUTSIDE OF PLANTING AREAS FOR CLARITY, INSTALL IRRIGATION PIPE, WIRING, VALVES, ETC. IN LANDSCAPED AREAS AND WITH PROPERTY LINES. B.TREE AND SHRUB LOCATION SHOWN ON LANDSCAPE PLANS TAKE PRECEDENCE OVER IRRIGATION EQUIPMENT LOCATIONS. AVOID CONFLICTS BETWEEN THE IRRIGATION SYSTEM, PLANTING MATERIALS, AND ARCHITECTURAL FEATURES. C.USE ONLY STANDARD TEES AND ELBOW FITTINGS. 7.PROVIDE THE FOLLOWING COMPONENTS TO THE OWNER PRIOR TO THE COMPLETION OF THE PROJECT: A.TWO (2) OPERATING KEYS FOR EACH TYPE OF MANUALLY OPERATED VALVES AND CONTROLLERS. 8.THE IRRIGATION CONTRACTOR IS RESPONSIBLE FOR THE INSTALLATION OF IRRIGATION SLEEVING. SLEEVES ARE REQUIRED FOR BOTH PIPING AND ELECTRICAL WIRING AT EACH HARDSCAPE CROSSING. COORDINATE INSTALLATION OF SLEEVING WITH OTHER TRADES. ANY PIPE OR WIRE WHICH WAS NOT INSTALLED WILL REQUIRE HORIZONTAL BORING BY THE IRRIGATION CONTRACTOR. IRRIGATION CONTRACTOR TO COORDINATE WITH SITE CONTRACTOR FOR TIME OF INSTALLATION AND LOCATION OF ANY SLEEVE AND/OR CONDUIT INSTALLATION. 9.INSTALL ALL ELECTRICAL POWER TO THE IRRIGATION CONTROL SYSTEM IN ACCORDANCE WITH THE NATIONAL ELECTRIC CODE AND ALL APPLICABLE LOCAL ELECTRIC UTILITY CODES. 10.INSTALL TWO (2) #14 AWG CONTROL WIRES FROM CONTROLLER LOCATION TO EACH DEAD-END OF MAINLINE FOR USE AS SPARE INCASE OF CONTROL WIRE FAILURE. COIL 3 FEET OF WIRE IN VALVE BOX. 11.ALL PLANT MATERIAL NOT LOCATED IN LAWN AREAS SHALL BE DRIP IRRIGATED BY AUTOMATIC CONTROLLED SYSTEM. RAINBIRD EQUIPMENT OR EQUAL. A COMPLETE LIST OF EQUIPMENT, SHOP DRAWING CATALOG CUTS, LAYOUT PERFORMANCE AND MAINTENANCE WARRANTY INFORMATION SHALL BE SUBMITTED TO THE OWNERS REPRESENTATIVE FOR APPROVAL PRIOR TO COMMENCING WORK. SAID INFORMATION SHALL BE COMPILED ALONG WITH AS-BUILT DRAWINGS AND MAINTENANCE INSTRUCTION AND SUBMITTED TO OWNER'S REPRESENTATIVE FOR APPROVAL AT FINAL COMPLETION. CONTRACTOR SHALL DEMONSTRATE COMPLETE OPERATING SYSTEM AND MAINTENANCE TO OWNER'S REPRESENTATIVE AND OWNER'S MAINTENANCE AND OPERATING PERSONNEL. 12.CONTRACTOR SHALL BE REQUIRED TO START UP AND WINTERIZE SYSTEM FOR THE WARRANTY PERIOD, ONE YEAR FROM FINAL COMPLETION, AND MAKE ALL ADJUSTMENTS AND REPAIRS REQUIRED TO INSURE EFFICIENT OPERATION. 13.CONTRACTOR SHALL PROVIDE ALL REQUIRED IRRIGATION WATER CONTROL, FILTRATION PRESSURE REGULATION, WASTE AND DRAINAGE REQUIREMENTS OF A COMPLETE MAINTENANCE SYSTEM. 14.CONTRACTOR SHALL PROVIDE 1 EACH 2 G.P.H. EMITTERS TO EACH SHRUB, VINE OR HERBACEOUS PLANT. ALL EQUIPMENT SHALL BE CONCEALED OR OTHERWISE PROTECTED UNDER SPECIFIED MULCHES AND IN VALVE BOXES WHERE ACCESS IS REQUIRED.SP SUBMITTALFILE:PROJECT NO:CAD:QUALITY ASSURANCE:DRAWING HISTORYDATE DESCRIPTIONa sanderson bellecci company702 EAST MAIN STREETIRRIGATION PLAN702 EAST MAINSITE RE-DEVELOPMENTBOZEMAN, MT 59715L3.1 BE23028_IR_PROD.DWGJZ/KA11/21/231ST SP SUBMITTAL02/15/24-----2ND SP SUBMITTAL-------230280 10 SCALE: 1" = 10' 20510 IRRIGATION PLAN LE*EN' I55I*ATI2N LE*EN' I55I*ATI2N 9AL9E S&+E'ULE UULC NUMBER MODEL TYPE PRECIP IN./WEEK MIN./WEEK GAL./WEEK GAL./DAY GAL./YEAR ACRE FEET/YEAR 1 RAIN BIRD XCZLF-100-PRF AREA FOR DRIPLINE 1.4016 4.2 179.8 129.5 43.2 776.7 0.007 2 RAIN BIRD XCZLF-100-PRF AREA FOR DRIP EMITTERS 0.3252 1 184.5 116.7 38.9 700.4 0.006 TOTALS:364.3 246.2 82.1 1477.1 0.014 **TOTALS BASED ON 3 WATERING DAYS A WEEK FOR 18 WATERING WEEKS A YEAR** I55I*ATI2N &AL&ULATI2NS