Loading...
HomeMy WebLinkAbout036 - L2.1 - LANDSCAPE DETAILSSP SUBMITTALFILE:PROJECT NO:CAD:QUALITY ASSURANCE:DRAWING HISTORYDATE DESCRIPTIONa sanderson bellecci company702 EAST MAIN STREETLANDSCAPE DETAILS702 EAST MAINSITE RE-DEVELOPMENTBOZEMAN, MT 59715L2.1 BE23028_LS_DETAILS.DWGJZ/KA11/21/231ST SP SUBMITTAL02/15/24-----2ND SP SUBMITTAL-------23028SHRUB PLANTING N.T.S. NOTES: 1.SHRUBS WITH BROKEN OR CRUMBLING ROOT BALLS WILL BE REJECTED. CONTAINER REMOVAL WILL NOT BE AN EXCUSE FOR DAMAGED ROOT BALLS. 2.TOP OF MULCH TO BE 1" BELOW ADJ WALKWAY, CURB, EDGING, OR OTHER SURFACE. 3.PRUNE OUT ALL DAMAGED OR DEAD WOOD. 4.ALL PLANT MATERIAL TO BE INSPECTED UPON DELIVERY. REJECTED MATERIALS TO BE IMMEDIATELY RETURNED TO SOURCE. 6.RAKE SUBGRADE AND REMOVE ALL DEBRIS GREATER THAN 1/2" IN DIA. INCLUDING ROCKS, CONCRETE, ORGANIC DEBRIS, AND OR CONSTRUCTION DEBRIS. TOP OF ROOT BALL SHALL BE 1-2" ABOVE SURROUNDING GRADE 3" DEPTH MULCH, KEEP MULCH AWAY FROM TRUNK REMOVE CONTAINER, LIGHTLY SCARIFY ROOTS BACKFILL WITH 75% NATIVE SOIL, 25% COMPOST 1 TREE GRATE - CURB & SIDEWALK N.T.S. CONCRETE ANCHOR BOLT (BY INSTALLER) 3" X 2" X 1/4" STEEL ANGLE SLOTTED 7X16" X 3/4" FOR CONCRETE ANCHOR (TYP. 8 PLCS. PER FRAME) CONCRETE SIDEWALK THICKENED EDGE SIDEWALK FOR TREE GRATE CURB AND GUTTER NOTES: 1.MUST MEET AND BE INSTALLED PER ADA STANDARDS. 2.SIDEWALKS TO BE INSTALLED PER MDT AND CITY OF BOZEMAN STANDARDS. TREE VAULT TREE GRATE VERTICAL SURFACE DISCONTINUITIES SHALL NOT BE GREATER THAN 1/4"9"4"WEDGED ANCHOR-STYLE- HANGERS EMBEDDED IN CONCRETE TO SECURE TREE GUY WIRES. 3 TREE VAULT SECTION N.T.S. 4'3'-4"SOIL VAULT WITH STRUCTURAL SOIL. SEE CIVIL FOR CURB AND GUTTER CONCRETE SIDEWALK VARIES - SEE CIVIL PLANS NOTES: 1.SOIL VAULT SHALL BE CONSTRUCTED FOR ALL STREET TREES. 2.SOIL VAULT SHALL BE CONSTRUCTED WITHIN ALL AREAS TO RECEIVE PAVER TREATMENT. 3.STRUCTURAL SOIL SHALL CONFORM TO USDA SOIL CLASSIFICATION SYSTEM CONSISTING OF GRAVEL <5%, SAND 25-30%, SILT 20-40%, CLAY 25-40%. 4.STRUCTURAL SOIL SHALL BE INSTALLED IN 6" LIFTS AND MEET 95% PROCTOR DENSITY. 3 L2.1 TREE GRATE - CURB & SIDEWALK 2 L2.1 TREE GRATE 7 L2.1 TREE GUARD 4 ROCK MULCH WEED BARRIER FABRIC NEW TOPSOIL EXISTING SUBGRADE18"3"ROCK MULCH N.T.S.5 NOTES: 1.MANUFACTURER: LANDSCAPE FORMS 2.PRODUCT: EMERSON BIKE RACK 3.COLOR: SILVER POWDERCOAT 4.MOUNT: SURFACE MOUNT2"2'-6"1'-03 4" 3 4" 6" 31 2" 23 4" 1'-8" SET SCREW FOR SECURING COVER PLATE CAST ALUMINUM FRAME STAINLESS STEEL LEVELING GUIDES 17/32" HOLES FOR ANCHORING COMPACTED SUBGRADE 6" COMPACTED AGGREGATE BASE 6" CONCRETE PAD BIKE RACK N.T.S.6 32" LENGTH NON-ABRASIVE RUBBER TIES (2)3" DIA LODGE POLE PINE STAKES 1-1/2' FROM TRUNK. STAKE LOCATION SHALL NOT INTERFERE WITH PERMANENT BRANCHES 3" DEPTH MULCH FINISH GRADE BOTTOM OF ROOT BALL RESTS ON EXT OR RECOMPACTED SOIL EXISTING SOIL DECIDUOUS TREE N.T.S. TOP OF ROOT FLARE 2" ABOVE EXT GRADE. NO SOIL ON ROOT FLARE LOOSENED SOIL. DIG AND TURN THE SOIL TO REDUCE COMPACTION TO THE AREA TO DEPTH OF ROOT BALL. 3 X DIA ROOT BALL MINNOTES: 1.REMOVE NURSERY STAKES. 2.PRUNE DEAD OR DAMAGED LIMBS IMMEDIATELY AFTER PLANTING. 3.REMOVE WIRE TIES AND BURLAP FROM ROOT BALL. 4.PRIOR TO MULCHING, LIGHTLY TAMP SOIL AROUND ROOT BALL IN 6" LIFTS TO BRACE TREE. DO NOT OVER COMPACT. WHEN PLANTING PIT HAS BEEN BACKFILLED, POUR WATER AROUND ROOT BALL TO SETTLE THE SOIL. 5.BACKFILL WITH AMENDED SOIL. 6.REMOVE STAKES FOLLOWING FIRST GROWING SEASON. 7.RAKE SUBGRADE AND REMOVE ALL DEBRIS GREATER THAN 1/2" IN DIA. INCLUDING ROCKS, CONCRETE, ORGANIC DEBRIS, AND OR CONSTRUCTION DEBRIS. 8.PROVIDE SUPPLEMENTAL WATER FOR THE FIRST YEAR FOLLOWING INSTALLATION. 8 NOTES: 1.IRON GRATE TO BE MODEL 8707-0002 5' SQUARE ORDERED FROM NEENAH FOUNDARY COMPANY. 2.FRAME TO BE MODEL 8500-6060 ORDERED FROM NEENAH FOUNDARY COMPANY. 3.ALL SLOT WIDTHS TO BE 1/4" MAX. 4.TREE OPENING SIZE TO BE 18" DIAMETER. 5.INSTALL PER MANUFACTURERS INSTRUCTIONS. 5.00'2.50'18" TREE GRATE N.T.S. 18"2"1 12"2 5.00'14" x 1 12" STEEL BAR STOCK 18" NOTES: 1.TREE GUARD TO BE MODEL NF42648 5' HEIGHT FROM NEENAH FOUNDARY COMPANY. 2.TREE OPENING TO BE 18" DIAMETER. 3.COLOR: BLACK POWDERCOAT. 4.INSTALL PER MANUFACTURERS INSTRUCTIONS. TREE GUARD N.T.S. 2 L2.1 TREE GRATE 7