HomeMy WebLinkAbout031 - C3.0 - SITE & UTILITY PLANSP SUBMITTALNORTH
FILE:
PROJECT NO:
CAD:
QUALITY ASSURANCE:
DRAWING HISTORY
DATE DESCRIPTION
702 EAST MAIN STREET
SITE & UTILITY PLAN
702 EAST MAIN
SITE RE-DEVELOPMENT
BOZEMAN, MT 59715C3.0BE
23028_SITE_PROD.DWG
JZ/KA
11/21/23 1ST SP SUBMITTAL
02/15/24
-
-
-
-
-
2ND SP SUBMITTAL
-
-
-
-
-
--
23028010SCALE: 1" = 10'20510GENERAL UTILITY NOTES:1.ALL DUCTILE IRON PIPE AND FITTINGS INCLUDING HYDRANTS, VALVE BOXES, CURB BOXES, AND ALL OTHER METAL PARTS ANDSURFACES SHALL BE ENCASED WITH V-BIO® ENHANCED POLYETHYLENE ENCASEMENT.2.THE POLYETHYLENE ENCASEMENT SHALL BE OVERLAPPED ONE FOOT IN EACH DIRECTION AT JOINTS AND SECURED IN PLACEAROUND THE PIPE, AND ANY WRAP AT TAP LOCATIONS SHALL BE TAPED TIGHTLY PRIOR TO TAPPING AND INSPECTED FOR ANYNEEDED REPAIRS FOLLOWING THE TAP.