Loading...
HomeMy WebLinkAbout001 - A000 - ARCH COVER SHEETPROJECT NARRATIVE The proposed project located at 702 East Main Street is planned to be an adaptive reuse of the existing single-story commercial building with basement. The scope of work will include a full structural retrofit with a new roof and new basement slab. The new program will be non- residential with an apartment. Upgrades to the exterior of the building will include new windows and doors (primarily within existing openings), new entry awnings, stairs and porches, a new standing seam metal roof, and new privacy fence with vehicular and pedestrian gate to access the back of the site. Additionally, the north brick facade facing Main Street would be repaired to the extent possible or replaced, and all exterior brick would be painted to match. The site will provide two off-street parking spots in the existing south service yard. The owner will utilize standard city trash bins that can be rolled to the street on service days, so no permanent enclosure is proposed. The existing height and footprint of the building will remain - the intent of this project is to improve the functionality and integrity of the existing building with some much needed updates. LEGAL LOT DESCRIPTION: ZONING: LAND USE: COMMUNITY PLAN FUTURE LAND USE: HISTORIC DISTRICT: YEAR BUILT: STRUCTURE NAME: NEIGHBORHOOD: BLOCK FRONTAGE: MAXIMUM BUILDING HEIGHT: SETBACKS: PROPERTY INFO NORTHERN PACIFIC ADD, S07, T02 S, R06 E, Lot 2,PLAT C-23-A11 X ROUSE 1ST ADD LOTS 3 & 4 BLK D B-3, DOWNTOWN DISTRICT COMMERCIAL RETAIL SALES, SERVICE BANKS COMMUNITY COMMERCIAL MIXED USE NONE, CONSERVATION OVERLAY DISTRICT ESTIMATED: 1912-1913 LINSAY BOZEMAN CO. FRUIT & PRODUCE WAREHOUSE LINDLEY PARK ASSOCIATION MIXED 70'-0" 0'-0" -FRONT 0'-0" -SIDE 0'-0" -REAR PROJECT TEAM OWNER: SevenR Ventures 4782 Jackson Creek Road Bozeman, MT 59715 CONTACT: MARK JARVIS (mrmajarvis@icloud.com) ARCHITECT: RYAN SCHARF 125 N. WALLACE AVE BOZEMAN, MT 59715 (406) 551-2011 (ryan@mfgrdesigns.com) STRUCTURAL ENGINEER: ROBERT PECCIA & ASSOCIATES, INC. 602 S. FERGUSON AVE., STE 5 BOZEMAN, MT 59718 (406) 284-2110 CONTACT: MATT MILLER (matt@rpa-hln.com) CIVIL ENGINEER: SANDERSON STEWART 106 EAST BABCOCK ST., STE L1 BOZEMAN, MT 59715 (406) 522-9876 CONTACT: JAKE JWEMKE (jzwemke@sandersonstewart.com) MEP ENGINEERS: ENERGY 1 2042 STADIUM DR STE 2 BOZEMAN, MT 59715(406) 522-9876 CONTACT: DOMINIQUE HAYS (dhays@energy-1.net) LOT AREA: BUILDING FOOTPRINT: TOTAL LIVABLE AREA: (LOWER) (MAIN) LOT COVERAGE: FLOOR AREA RATIO: AREA CALCULATIONS PROPOSED 0.19 ACRES 3,109 SF 5,376 SF 2,656 SF 2,720 SF 35% (100% MAXIMUM PER UDC TABLE 38.320.050) .35:1 (NO MINIMUM REQ'D) ADA COMPLIANCE STATEMENT THE DRAWINGS FOR THIS PROJECT HAVE BEEN REVIEWED FOR ACCESSIBILITY COMPLIANCE TO THE ADA ACCESSIBILITY STANDARDS FOR COMMERCIAL BUILDINGS. THE COMMERCIAL SPACE IN THIS PROJECT HAS BEEN REVIEWED FOR COMPLIANCE TO THE INTERNATIONAL BUILDING CODE 2021 EDITION. THE ICC/ANSI A117.1-2017 VERSION OF THE ACCESSIBLE AND USABLE BUILDINGS AND FACILITIES MANUAL WAS USED IN CONJUNCTION WITH THE INTERNATIONAL BUILDING CODE 2021 EDITION IN REVIEWING THE COMMERICAL SPACE OF THIS PROJECT FOR ACCESSIBILITY COMPLIANCE. THE PUBLIC AREAS OF THIS PROJECT INCLUDE: PUBLIC WALKS AND DRIVEWAY CROSSINGS AND ANY AREAS WITHIN THAT COULD BE USED BY THE PUBLIC. THESE AREAS WERE REVIEWED FOR ACCESSIBILITY COMPLIANCE TO THE 2010 ADA STANDARDS FOR ACCESSIBILE DESIGN (2010 ADA) 2010 EDITION. PROJECT ACCESSIBILITY COMPLIANCE: PUBLIC AREAS: 2010 ADA STD COMMERCIAL USE AREAS: IBC 2021 & ANSI A117.1-2017 SINCE THIS EXISTING BUILDING IS LESS THAN 3 STORIES AND LESS THAN 3000SF PER STORY, NO ELEVATOR WILL BE PROVIDED. ONLY THE GROUND FLOOR BUSINESS USE WILL BE ACCESSIBLE. STATEMENT FOR WALK-UP BUILDINGS (NON ELEVATOR SERVED BUILDINGS) APPLICABLE CODES: 2021 INTERNATIONAL EXISTING BUILDING CODE (IEBC) 2021 INTERNATIONAL BUILDING CODE (IBC) ICC A117.1-2017 STANDARD FOR ACCESSIBLE AND USABLE BUILDINGS AND FACILITIES 125 NORTH WALLACE AVE. BOZEMAN, MT 59715 DATE ISSUED: CURRENT REVISION #: CURRENT REVISION DATE: PROJECT NUMBER: Date 1 1 A000 COVER SHEET 2207PROJ. #2207702 EAST MAIN702 EAST MAIN STREETBOZEMAN, MONTANA 59715SP/CCOA11/22/2023 A000 COVER SHEET A001 SYMBOLS & ABBREVIATIONS A002 SITE PHOTOS A016 OPEN SPACE DIAGRAMS A020 TYPICAL DETAILS - MOUNTING HEIGHTS A030 TYPICAL DETAILS - ADA CLEARANCE DETAILS A040 TYPICAL DETAILS - BUILDING SIGNAGE A100 EXISTING / DEMO SITE PLAN A101 SITE PLAN A102 VEHICULAR SITE DIAGRAMS A103 VEHICULAR SITE DIAGRAMS A111 ENLARGED DRAWINGS - EXT. STAIR & LIFT A112 DETAILS - ADA LIFT A113 ENLARGED DRAWINGS - EXT. STAIR & RAMPSITE STAIR & RAMP A114 TYPICAL STAIR AND RAILING DETAILS A115 ENLARGED DRAWINGS - GATE & FENCE A200 EXISTING / DEMO FLOOR PLAN - LOWER LEVEL A201 EXISTING / DEMO FLOOR PLAN - MAIN LEVEL A210 FLOOR PLAN - LOWER LEVEL A211 FLOOR PLAN - MAIN LEVEL A221 ROOF PLANS A401 EXISTING / DEMO ELEVATIONS A402 EXISTING / DEMO ELEVATIONS A411 ELEVATIONS - EXTERIOR A412 ELEVATIONS - EXTERIOR A902 RENDERING A903 RENDERING A904 RENDERING SHEET INDEX 1. The contractor shall schedule & coordinate all required inspections from the appropriate regulatory agencies. 2. Contractor shall submit copies of inspection reports for all required inspections to the Architect/Engineers and Owner. 3. Obtain all permits and pay all fees required by local laws, ordinances and regulations pertaining to this work. 4. Existing buried utility lines other than those indicated in the drawings may exist on the site. The contractor shall verify and proceed with caution during all excavation work. Make all possible investigations as to locations of unmarked lines. 5. Contractor shall verify all conditions in the field covering or affecting the work prior to submitting bid or beginning work. Obtain and verify dimensions to insure proper location with respect to existing buildings and report to Architect and all conditions which may interfere with or otherwise affect proper completion of the work. 6. The Contractor shall layout the work from the dimensions shown on the drawings and shall be responsible for all measurements in the connection therewith and shall advise the Architect in writing of any and all discrepancies or conflicts prior to commencing the actual work. All work shall be considered to be new work except where indicated to be existing. 7. Provide and maintain necessary coverings and boarding to protect existing work and finishes. Upon completion, remove all protection, clean all exposed surfaces and leave all spaces in a clean, orderly condition and broom sweep. The Contractor shall be held responsible for damage caused by improper protection and shall repair any damage caused, without extra charge to the owner. 8. Provide temporary fencing and enclosures around the site for protection of the public safety. 9. The Contractor shall institute and maintain safety measures and provide all equipment or temporary construction to safeguard all persons and property affected by his operations. 10. The Contractor shall field verify and locate the placement and depths of all existing utilities and site features prior to starting work. 11. The Contractor shall be responsible for the repair of all damaged surfaces that occur from construction activities to match existing surfaces in kind, typical. 12. The Contractor shall be responsible for all fire safing and joint sealants of building penetrations that occur from construction activities, typ. 13. Drawings shall not be scaled. GENERAL NOTES 702 EAST MAIN SITE PLAN/CCOA SUBMITTAL (CORRECTION CYCLE 1) FEB. 16, 2024