1. A description of the proposed activity.
The proposed project at Urban + Farm will (1) restore a previously straightened section of Baxter
Creek, adding channel sinuosity and restoring wetland areas; (2) reroute water from an existing stream-
ditch to allow return to Baxter Creek (water presently goes subterranean, rather than returning to Baxter
Creek); and (3) will provide approximately 1,000 new housing units critical to Bozeman’s housing
shortage.
2. A description of why avoidance and less damaging alternatives have been
rejected, if applicable.
See Submittal Information.
3. Wetland delineation report complying with the requirements of Section
38.30 BMC.
An aquatic delineation report complying with the requirements of Section 38.30 BMC
has been submitted.
4. A site plan which shows the delineated wetland boundary, the property
boundary, all existing and proposed structures, streets and hardscape
including sidewalks and pathways, watercourses and drainage ways on and
within 100 feet of the property. Include the date of preparation and any
revisions and north point indicator. Suggested scale of 1 inch to 20 feet, but
not less than 1 inch to 100 feet. The wetland boundary must be keyed to a
wetland delineation report.
Yes, all site plans and planning maps were submitted in accordance with preliminary plat.
5. The exact locations and specifications for all proposed regulated
activities and the direct and indirect impact of such activities.
Yes, all site plans and planning maps were submitted in accordance with preliminary plat.
See submittal information.
6. The source, type and method of transport and disposal of any fill materials to be
used, and certification that he placement of fill material will not violate any
applicable state or federal statutes and regulations.
Yes, all site plans and planning maps were submitted in accordance with preliminary plat.
7. Copies of any Section 404 wetland permits submitted or already
obtained for the site.
Section 404 permit is pending.
8. Any historical information regarding wetland permitting or
mitigation on the site.
No historical information was available regarding permitting or mitigation for
this site.