HomeMy WebLinkAbout01_UF Preliminary Plat NarrativeURBAN + FARM // BOZEMAN, MT // DECEMBER 16, 2022 BAXTER
C
RE
EKPOND LILY DRIVEPOND LILY DRIVEURBAN + FARM // Conceptual Site Plan
300’600’150’0’
PROJECT AREAHUFFINE LANEHUFFINE LANE
VALLEY COMMONSVALLEY COMMONS
NORTON RANCHNORTON RANCHCOMMUNITYCOMMUNITY
COMPETITION DRIVECOMPETITION DRIVE
FALLON STREETFALLON STREET
MAY FLY STREET
EXISTING PARK
ROW EASEMENT
MIXED USE
MIXED USEMIXED USERELIANCE STREETRELIANCE STREETELDORADO AVENUEELDORADO AVENUELAUREL PARKWAYLAUREL PARKWAYWATER LILY DRIVEWATER LILY DRIVEBETTY LANEBETTY LANEL4-B12L4-B120.96 AC0.96 ACGREENHOUSEGREENHOUSE
LX-BXXL=LotB=Block
P=ParkOS=Open Space
LEGEND
L1-B13L1-B131.58 AC1.58 ACCommercialCommercial
OS G-B13OS G-B130.23 AC OPEN SPACE0.23 AC OPEN SPACE OS F-B12OS F-B120.41 AC OPEN SPACE0.41 AC OPEN SPACE
L3-B12L3-B121.40 AC1.40 ACRECREATION CENTER / RESIDENTIALRECREATION CENTER / RESIDENTIAL
L5-B12L5-B124.95 AC4.95 AC
L1-B12L1-B120.86 AC0.86 AC
OS EOS E2.09 AC2.09 ACOPEN SPACEOPEN SPACE
L2-B11L2-B110.95 AC0.95 ACFIRE DISTRICTFIRE DISTRICT
L1-B11L1-B11
2.39 AC2.39 AC
OS D-B11OS D-B110.56 AC0.56 ACOPEN SPACEOPEN SPACE
L1-B10L1-B101.61 AC1.61 AC
L1-B9L1-B90.72 AC0.72 AC L2-B9L2-B90.69 AC0.69 AC
PG-B9PG-B92.95 AC2.95 ACPARKPARK
P C-B3P C-B31.95 AC 1.95 AC PARKPARK
P B-B2P B-B20.49 AC 0.49 AC PARKPARK
P A-B1P A-B10.39 AC 0.39 AC PARKPARK
L1-B8L1-B86.81 AC6.81 AC
P F-B7P F-B70.72 AC PARK0.72 AC PARK
OS C-B8OS C-B80.78 AC OPEN SPACE0.78 AC OPEN SPACE
L1-B7L1-B75.70 AC5.70 AC
L2-B6L2-B61.13 AC1.13 ACOS B-B6OS B-B60.11 AC0.11 ACOSOS
L1-B6L1-B61.06 AC1.06 AC
L1-B4L1-B44.59 AC4.59 AC
L1-B5L1-B54.12 AC4.12 ACL1-B1L1-B14.38 AC4.38 AC
L1-B2L1-B25.04 AC5.04 AC
L1-B3L1-B36.81 AC6.81 AC
OS A -B3OS A -B31.01 AC OPEN SPACE1.01 AC OPEN SPACE
OS HOS H1.73 AC1.73 ACOPEN SPACEOPEN SPACE
P D-B2P D-B20.66 AC PARK0.66 AC PARK P E-B4P E-B40.59 AC PARK0.59 AC PARK
City of Bozeman
Community Development Department
20 E Olive Street
Bozeman, MT 59715
Initial Submittal: February 10, 2023
Urban + Farm
Phase 2 Preliminary Plat
2 CUSHING TERRELL
Owner/Appliant Laurel Parkway, LLC
Outlaw Real Estate Partners
PO Box 161236
Big Sky MT 59716
Planning & Cushing Terrell
Landscape 411 E Main Street
Architecture Bozeman MT 59715
Engineer Hyalite Engineering
2304 N 7th Ave. Suite L
Bozeman MT 59715
Wetlands Sun Dog Ecological, Inc
PO Box 1424
Bozeman MT 59715
Project Team
Planning KTGY Group, Inc.
3660 Blake Street, STE 500
Denver, CO 80205
Water Rights DMS Natural Resources
602 S Ferguson Ave, STE 2
Bozeman, MT 59718
3 URBAN + FARM PHASE 2
Project Narrative
Urban + Farm is a master-planned, mixed-use
agrihood community in Bozeman setting a new
precedent for active, sustainable living in Southwest
Montana. Anchoring West Bozeman, Urban + Farm is
located within city limits and includes a diverse mix of
housing and experiential opportunities. Designed to
be a “complete community”, Urban + Farm will provide
opportunities for a mix of housing types, civic and
commercial services and recreational opportunities.
Urban + Farm includes many amenities planned to be
enjoyed by residents and visitors alike.
The commercial center proposed within Urban + Farm
creates commercial opportunities for the area and
combines them with public space and civic build-
ings, trail connections and parkland to create a new
destination in west Bozeman. Using higher densities,
housing variety and new urbanist design, the vision for
Urban + Farm seeks to create a distinct neighborhood
character and builds on existing residential and com-
mercial development in the area.
Nestled between Norton Ranch subdivision to the
north and Loyal Gardens subdivision to the south,
Urban+ Farm prioritizes mixing density and housing
variety with smart park planning and multi-modal
transportation options to build neighborhood
character and to create a place where people want to
live. The high-density residential housing encouraged
within B2M zoning will bring diversity to the large
single-family subdivisions currently found in the area
and provide increases in density that the city is looking
for.
The design intent of Urban + Farm ultimately seeks
to optimize residential density using different hous-
ing types, emphasize neighborhood and commercial
opportunities to create a neighborhood that aligns
with the Community Commercial Mixed Use land
use designation assigned to the site in the Bozeman
Community Plan.
4 CUSHING TERRELL
Site Description
Urban + Farm Phase 2 is comprised of 2 parcels
totaling approximately 86.44 acres. The site is generally
located on the western most side of city limits and is
flanked by Fallon Street to the north and Huffine to the
south.
Urban + Farm Phase 1 is located immediately to the
north. A Preliminary Plat application for Phase 1 has
already been submitted under a separate application
and is currently under city review.
The project site is currently vacant of structures except
for agricultural outbuildings and a house, the parcels
are the remaining undeveloped properties associated
with the Norton East Ranch Subdivision.
Current zoning is as follows:
• Lot R4, 68.9 acres = REMU & B2M
• Portion of COS 1005, 18.2 acres = B2M
Current Zoning Map
5 URBAN + FARM PHASE 2
Land Use Description & Compli-
ance with 2020 Community Plan
According to the 2020 Community Plan, the site
has a Future Land Use Designation of Community
Commercial Mixed Use. This Land Use Designation
promotes the development of commercial areas
necessary for economic health and vibrancy within the
city. It also calls for mixed use building and commercial
and residential development to capture densities that
are higher than currently seen in Bozeman.
The Community Business District - Mixed (B2M)
zoning is an implementing district for the Community
Commercial Mixed Use Land Use (CCMU) and certainly
aligns with the goals for CCMU areas.
The intent of the B2N district is to provide for a
variety of commercial functions and multihousehold
dwellings. Development should ultimately be
pedestrian oriented and have access to public transit
or arterial corridors.
As proposed, Urban + Farm Phase 2 builds on this
character established in the Community Plan and
zoning and begins to implement it through the
creation of a street network, planning area parcels and
a network of parks and open space areas.
Specifically, each planning area parcel proposed in
the Preliminary Plat is sized to accommodate future
development that complies with B2M standards.
Further, the street grid has also been carefully planned
for high density development.
Laurel Parkway, designated as a collector street will be
expanded to the south and ultimate connect to a new
signalized intersection at Huffine Lane. In addition,
Urban + Farm Phase one will include the extension of
the following local streets:
North/South
• S Eldorado Avenue
• Reliance Avenue
• Pond Lily Drive
• Water Lily Drive
East/West
• Competition Drive
• Valley Commons Drive
This street network optimizes traditional city block
lengths, provides for bike traffic and establishes
corridors that emphasize pedestrian experience. This
framework will create a activated and urban setting
once site plan development occurs.
Building on vehicular routes, Urban + Farm Phase 2
also includes an extensive network of multiuse paths,
trails and sidewalks. With most park and open space
areas located within a 15 minute walk, these routes
provide complete non-vehicular access the length of
the site.
Cross walks, bulb outs, sections of reduced street
width, and designated bike lanes provide safety
features that emphasize the importance of multi-
modal transportation within Urban + Farm and
6 CUSHING TERRELL
encourage use. Combined, these routes and features
provide an easy and convenient transportation
alternative for residents and visitors wishing to explore
and travel through the neighborhood on foot or on a
bike.
Urban + Farm is a complete community, one that
integrates residential and commercial uses to create
a vibrant neighborhood. Proposed uses include all
uses allowed in the B-2M zoning district as listed in
the UDC with an emphasis on mixed use buildings,
neighborhood commercial services and employment
centers for the commercial core and high density
residential opportunities in supporting areas.
The commercial core area is located directly off Huffine
in the southeast portion of the neighborhood. Parcel
area and street layout provide the framework needed
to support multi-story commercial and mixed use
buildings. On street parking and robust pedestrian
routes ensure that both patrons and workforce can
access the commercial area hassle free.
Civic uses have also been planned for within Urban +
Farm Phase 2. Developers have been in contact with
city officials to discuss a potential site for a new fire
station.
Affordable housing is also planned for Urban + Farm
Phase 2. Lot 1 Block 12 is set aside for the development
of affordable units. Additional coordination with the
City is needed to further refine plans for this area.[‘];/
Urban + Farm Phase 2 includes plans for a thoughtful
parks system, open space and a wetland conservation
area. Together, these amenities provide amble
outdoor recreational opportunities in West Bozeman.
For additional details on the parkland dedication
assumptions for Urban + Farm Phase 2, including
discussion of CILP, please reference the Parks Master
Plan.
URBAN + FARM // BOZEMAN, MT // DECEMBER 16, 2022 BAXTER CREEKPOND LILY DRIVEPOND LILY DRIVEURBAN + FARM // Conceptual Site Plan
300’600’150’0’
PROJECT AREAHUFFINE LANEHUFFINE LANE
VALLEY COMMONSVALLEY COMMONS
NORTON RANCHNORTON RANCHCOMMUNITYCOMMUNITY
COMPETITION DRIVECOMPETITION DRIVE
FALLON STREETFALLON STREET
MAY FLY STREET
EXISTING PARK
ROW EASEMENT
MIXED USE
MIXED USEMIXED USERELIANCE STREETRELIANCE STREETELDORADO AVENUEELDORADO AVENUELAUREL PARKWAYLAUREL PARKWAYWATER LILY DRIVEWATER LILY DRIVEBETTY LANEBETTY LANEL4-B12L4-B120.96 AC0.96 ACGREENHOUSEGREENHOUSE
LX-BXXL=LotB=BlockP=ParkOS=Open Space
LEGEND
L1-B13L1-B131.58 AC1.58 ACCommercialCommercial
OS G-B13OS G-B130.23 AC OPEN SPACE0.23 AC OPEN SPACE OS F-B12OS F-B120.41 AC OPEN SPACE0.41 AC OPEN SPACE
L3-B12L3-B121.40 AC1.40 ACRECREATION CENTER / RESIDENTIALRECREATION CENTER / RESIDENTIAL
L5-B12L5-B124.95 AC4.95 AC
L1-B12L1-B120.86 AC0.86 AC
OS EOS E2.09 AC2.09 ACOPEN SPACEOPEN SPACE
L2-B11L2-B110.95 AC0.95 ACFIRE DISTRICTFIRE DISTRICT
L1-B11L1-B11
2.39 AC2.39 AC
OS D-B11OS D-B110.56 AC0.56 ACOPEN SPACEOPEN SPACE
L1-B10L1-B101.61 AC1.61 AC
L1-B9L1-B90.72 AC0.72 AC L2-B9L2-B90.69 AC0.69 AC
PG-B9PG-B92.95 AC2.95 ACPARKPARK
P C-B3P C-B31.95 AC 1.95 AC PARKPARK
P B-B2P B-B20.49 AC 0.49 AC PARKPARK
P A-B1P A-B10.39 AC 0.39 AC PARKPARK
L1-B8L1-B86.81 AC6.81 AC
P F-B7P F-B70.72 AC PARK0.72 AC PARK
OS C-B8OS C-B80.78 AC OPEN SPACE0.78 AC OPEN SPACE
L1-B7L1-B75.70 AC5.70 AC
L2-B6L2-B61.13 AC1.13 ACOS B-B6OS B-B60.11 AC0.11 ACOSOS
L1-B6L1-B61.06 AC1.06 AC
L1-B4L1-B44.59 AC4.59 AC
L1-B5L1-B54.12 AC4.12 ACL1-B1L1-B14.38 AC4.38 AC
L1-B2L1-B25.04 AC5.04 AC
L1-B3L1-B36.81 AC6.81 AC
OS A -B3OS A -B31.01 AC OPEN SPACE1.01 AC OPEN SPACE
OS HOS H1.73 AC1.73 ACOPEN SPACEOPEN SPACE
P D-B2P D-B20.66 AC PARK0.66 AC PARK P E-B4P E-B40.59 AC PARK0.59 AC PARK
7 URBAN + FARM PHASE 2
THEME 2 | A CITY OF UNIQUE NEIGHBORHOODS
Goal N-1: Support well-planned, walkable
neighborhoods.
Parcel area adequate to support high density
development and ample pedestrian connectivity
influenced the proposed layout. North-south and
east-west trail connections are contemplated to
extend existing pedestrian routes and create new
thoroughfares throughout the neighborhood. These
pedestrian pathways are intended deemphasize
typical moto-centric design and to appeal to a
multi-modal transportation lifestyle. In addition,
complementary open spaces maximize functionality
most notably with the addition of ~ 3,400 linear
feet of asphalt pathway running the length of the
neighborhood adjacent to Huffine, and are meant
to encourage interaction between neighbors and
support effort to create a Westside neighborhood
identity.
N-1.5 Encourage neighborhood focal point
development with functions, activities, and facilities
that can be sustained over time. Maintain standards
for placement of community focal points and services
within new development.
Urban + Farm Phase 2 includes a Neighborhood
Center that includes green space, walking paths, a
playground and pond. This area will serve as a new
landmark in west Bozeman and provide a place for
congregation and play.
N-1.6 Encourage urban agriculture as part of focal
point development, in close proximity to schools, and
near dense or multi-unit housing.
Urban Farm Phase 2 is influenced by urban agricultural
and opportunities for residential and commercial
activities in close proximity to multi-unit housing are
planned. Open spaces and parks include edible plants
meant to encourage foraging. Further- the commercial
core will be anchored by a greenhouse envisioned to
provide opportunities for food production.
Open spaces., parks and the commercial core are
located within walking distance from residences and
the pathway and trail system will provide safe and
efficient routes.
N-1.9 Ensure multimodal connections between
adjacent developments
The pathway located within the West Linear Park
directly connected the existing trail originating in
Norton Farms south to an eventual connection to a
multi-use path adjacent to Huffine.
Further, the Baxter Creek Trail aligned with Baxter Creek
will connect to the north using a trail proposed in the
West Side Flats Phase 2 & 3 site plan currently under
review. The Baxter Creek Trail will eventually connect to
the multi-use train to the south once redevelopment
of the adjacent property is initiated.
The multi-use trail located within the Open Space
Conformance with the 2020 Community Plan
8 CUSHING TERRELL
area adjacent to Huffine serves as the western most
connection within city limits. Its eventual connection
to Cottonwood Road to the east will complete a
significant east-west non-vehicular travel route.
N-1.10 Increase connectivity between parks and
neighborhoods through continued trail and sidewalk
development. Prioritize closing gaps within the
network.
In addition to the connections described above,
a significant trail and pathway network has been
developed throughout the neighborhood. Using a
series of sidewalks, pathways, multi-use paths and
trails residents and visitors can travel to each park
space on a bike or on foot. In addition, future site plan
development will have access to existing multi-modal
routes which provide connection between parcels.
Patrons of the future commercial core area can also
travel to and from businesses without relying on a
vehicle. Finally, the expansion to existing trail routes
within Norton Ranch and West Side Flats improves
connectivity to park spaces outside the Urban + Farm
neighborhood and city wide.
N-2.5 Ensure that new development includes
opportunities for urban agriculture, including rooftop
and home gardens, community gardens, or urban
farms.
Urban Farm Phase 2 is influenced by urban agricultural
and opportunities for residential and commercial
activities in close proximity to multi-unit housing are
planned. Open spaces and parks include edible plants
meant to encourage foraging. Further- the commercial
core will be anchored by a greenhouse envisioned to
provide opportunities for food production.
Open spaces., parks and the commercial core are
located within walking distance from residences and
the pathway and trail system will provide safe and
efficient routes.
Goal N-3: Promote a diverse supply of quality
housing units.
N-3.8 Promote the development of “Missing Middle”
housing (side by side or stacked duplex, triplex, live-
work, cottage housing, group living, rowhouses/
townhouses, etc.) as one of the most critical
components of affordable housing.
Each planning area parcel proposed in the Preliminary
Plat is sized to accommodate future development
that complies with B2M standards. Current city zoning
requires that a residential building contain a minimum
of four (4) attached households. As designed, parcels
contain area sufficient to develop a variety of attached
housing.
Goal N-4: Continue to encourage Bozeman’s sense of
place.
N-4.2 Incorporate features, in both public and private
projects, to provide organization, structure, and
landmarks as Bozeman grows.
Urban + Farm Phase 2 will expand the existing
city street grid network and future development
will comply with street frontage requirements and
city design standards. By aligning with existing
development structure, future development in Urban
+ Farm Phase 2 will feel familiar to Bozeman residents.
9 URBAN + FARM PHASE 2
In addition, the proposed project includes a
Neighborhood Center with green space, walking
paths, a playground and pond. This area is prominent
and will serve as a new landmark in west Bozeman and
provide a place for congregation and play
N-4.4 Ensure an adequate supply of off leash facilities
to meet the demand of Bozeman dog owners.
Bozeman residents are dog lovers. An important
part of the Urban + Farm parkland design is the
Dog Park planned in the southwest portion of the
neighborhood. The Dog Park design includes features
and amenities specific to meet the needs of pet
owners and will include a fenced off-leash area.
THEME 3 | A CITY BOLSTERED BY DOWNTOWN AND
COMPLEMENTARY DISTRICTS
Goal DCD-1: Support urban development within the
City.
DCD-1.9 Promote mixed-use developments with access
to parks, open space, and transit options.
Urban + Farm is a mixed-use agrihood community
in Bozeman setting a new precedent for active,
sustainable living in Southwest Montana. Anchoring
West Bozeman, Urban + Farm is located within city
limits and includes a diverse mix of housing and
experiential opportunities. Designed to be a “complete
community”, Urban + Farm will provide opportunities
for a mix of high density housing types and
commercial services. The proposed park system and
open spaces are accessible to all planning area parcels
and provide infrastructure needed to live car-free!
DCD-2.2 Support higher density development along
main corridors and at high visibility street corners
to accommodate population growth and support
businesses.
Urban + Farm Phase 2 is located adjacent to Huffine,
a Principal Arterial Street and will provide three
access points onto Huffine west of Cottonwood
Road. The proposed plan includes the extension
of Laurel Parkway, a Collector Street, south to a
signalized intersection at Huffine Lane. If approved, the
neighborhood planned for this location will support
this goal.
DCD-2.6 Evaluate and pursue joint mitigation of
development impacts across multiple developments.
Urban + Farm Phase 2 is currently working with
the neighboring landowners and developers to
further expand on the existing Norton Ranch Lift
Station (NRLS) in order to be able to serve the
currently planned developments as well as the future
developments that the area is slated for. This includes
additional wet well upgrades, sewer pump upgrades,
a new force main to the existing gravity system as well
as other electrical and SCADA improvements.
On top of the sewer upgrades necessary, the City of
Bozeman Water Master Plan identifies the Norton
Ranch area as a upcoming pressure zone area, thus
requiring the need for new transmission mains
outside of the U+F area as well as a new Pressure
Reducing Valve in order to serve the currently high
pressure area. Coordination with the City of Bozeman
Engineering Department, as well as the Water & Sewer
10 CUSHING TERRELL
Departments, will be ongoing for the next couple of
years in order to bring it to construction and per the
City’s details & recommendations.
Goal DCD-3: Ensure multimodal connectivity within
the City
Parcel area adequate to support high density
development and ample pedestrian connectivity
influenced the proposed layout and will contribute
to city-wide multimodal connectivity. North-south
and east-west trail connections are contemplated
to extend existing pedestrian routes and create new
thoroughfares throughout the neighborhood. These
pedestrian pathways are intended deemphasize
typical moto-centric design and to appeal to a
multi-modal transportation lifestyle. In addition,
complementary open spaces maximize functionality
most notably with the addition of XX feet of asphalt
pathway running the length of the neighborhood
adjacent to Huffine, and are meant to encourage
interaction between neighbors and support effort to
create a Westside neighborhood identity.
THEME 4 | A CITY INFLUENCED BY OUR NATURAL
ENVIRONMENT, PARKS, AND OPEN LANDS
Urban + Farm Phase 2 includes plans for a thoughtful
parks system, open space and a wetland conservation
area. Together, these amenities provide amble
outdoor recreational opportunities in West Bozeman.
For additional details on the parkland dedication
assumptions for Urban + Farm Phase 2, including
discussion of CILP, please reference the Parks Master
Plan.
EPO-1.1 Coordinate the location of existing and future
parks to create opportunities for linear parks
to connect larger parks. Prioritize quality locations and
features in parks over quantity of parks.
The development of the West Linear Park, Huffine
& Baxter Creek Open Space directly respond to city
requests and correlate with the 2007 PROST Plan and
trail corridor map. In addition, it is the preference
of the developer to satisfy the required parkland
dedication obligation using both dedicated land and
Cash in Lieu. Ultimately the cash obligation is planned
for reinvestment into the proposed park spaces as
amenities. This strategy supports the city goal to
prioritize park quality over quantity.
EPO-1.3 Incorporate unique and inclusive recreational
and artistic elements into parks.
The park system designed for Urban + Farm Phase
2 include spaces and amenities offering a variety of
activities. A dog park, walking paths, bike routes, play
spaces, green areas, edible landscaping, a pond, shade
structures and benches provide opportunities for
recreation that are varied and inclusive.
A line item for Public Art installations has been set
aside within the proposed budget to add artistic
elements throughout.
EPO-1.4 Research and implement multi-use features
within parks to promote increased use and visitation.
Wherever possible, parks are connected to multi-modal
transportation options and accessible for people with
disabilities.
All park spaces have been designed to comply with
American with Disabilities Act (ADA) standards.
Specifically, all pathways have been appropriately
graded & in line with City of Bozeman trail standards.
11 URBAN + FARM PHASE 2
The proposed playground equipment includes
activities for a variety of ages & abilities. Curb ramps
and transfer stations are also integrated throughout
park spaces.
Multiple park spaces are planned throughout the
Urban + Farm neighborhood. Each one provides a
unique user experience and opportunity to walk to an
outdoor space for recreation no matter where you live
within the development.
The trail and pathway network included within Urban
+ Farm provide a completely connected pedestrian
and bike route through the neighborhood. Using
a variety of profiles, routes have been planned for
and incorporated to provide convenient car-free
movement. In addition of connections to existing
routes will improve alternative transportation options
for the city and encourage visitors to walk or ride their
bike.
EPO-1.5 Work with partner organizations to identify
and reduce impacts on at-risk, environmentally
sensitive areas that contribute to water quality, wildlife
corridors, or wildlife habitat, specifically wildlife habitat
as we continue outward growth.
The scope of Urban + Farm Phase 2 includes the
preservation of 5.12 acres of Baxter Creek and wetland
area as open space. In addition to setting aside this
open space to protect it from development, the
wetland protection strategy also includes re-routing
of Huffine ditch to allow water to enter Baxter Creek
and a realignment of Baxter Creek to include improved
sinuosity and wetland enhancements.
Goal EPO-2: Work to ensure that development is
responsive to natural features.
The scope of Urban + Farm Phase 2 includes the
preservation of 5.12 acres of Baxter Creek and wetland
area as open space. In addition to setting aside this
open space to protect it from development, the
wetland protection strategy also includes re-routing
of Huffine ditch to allow water to enter Baxter Creek
and a realignment of Baxter Creek to include improved
sinuosity and wetland enhancements. Natural
watercourse corridors are also maintained within
Urban + Farm. The plan recognizes 50 ft wetland
building setbacks located on either side to create a
minimum 100 ft corridor along Baxter Creek.
EPO-3.2 Ensure complete streets and identify long-
term resources for the maintenance of year round bike
and multi-use paths to improve utilization and reduce
annual per capita vehicle miles traveled.
Long-term maintenance of the Active Transportation
Network was considered throughout the design
process. Specific requirements and maintenance plans
will be addressed within the Master Covenant (CCR’s).
Bike and pedestrian paths located within park spaces
will be maintained by the city and pathways located
within open spaces will be maintained by the Home
Owners Association. All pathways will be maintained
and able to be used year-round.
EPO-3.3 Support water conservation, use of native
plants in landscaping, and development of water
reuse systems.
Park and open space design within Urban + Farm
Phase 2 includes thoughtful water conscious
12 CUSHING TERRELL
design. Incorporation of dryland grass swaths which
require much less irrigation, once established, than
traditional blue grass (thus reducing overall high water
lawn areas). Use of drought tolerant and climate
appropriate plant materials. Grouping/massing of
plants to consolidate irrigated areas for water use
efficiency. Use of shade trees to cool and provide
shade - lessening evapotranspiration.
EPO-3.10 Inclusion of community gardens, edible
landscaping, and urban micro-farms as part of open
spaces outside of watercourses and wetlands in
subdivisions is encouraged where appropriate.
Areas planted with edible landscapes are planned
within the Central Park and Open Space area adjacent
to the commercial core.
EPO-4.1 Eliminate reliance on private maintenance
of public infrastructure, including public parks,
trail systems, and stormwater facilities. Identify a
sustainable and reliable public funding source for this
infrastructure.
All dedicated park spaces and planned amenities
proposed within Urban + Farm Phase 2 will be
maintained by the City of Bozeman.
THEME 5 | A CITY THAT PRIORITIZES ACCESSIBILITY
AND MOBILITY CHOICES
Goal M-1: Ensure multimodal accessibility.
The trail and pathway network included within Urban
+ Farm provide a completely connected pedestrian
and bike route through the neighborhood. Using
a variety of profiles, routes have been planned for
and incorporated to provide convenient car-free
movement. In addition of connections to existing
routes will improve alternative transportation options
for the city and encourage visitors to walk or ride their
bike.
Adequate vehicular access has also been incorporated
into the neighborhood design. City approved block
lengths and street sections create familiar travel
patterns for the traveling public.
M-1.1 Prioritize mixed-use land use patterns.
Encourage and enable the development of housing,
jobs, and services in close proximity to one another.
Parcel area adequate to support high density mixed-
use development and ample pedestrian connectivity
influenced the proposed layout.
The commercial center proposed within Urban
+ Farm creates commercial opportunities for the
area and combines them with public space and
civic buildings, trail connections and parkland to
create a new destination in west Bozeman. Mixing
commercial opportunities with high density residential
development like envisioned in Urban + Farm
supports this community goal.
M-1.7 Develop a trunk network of high-frequency,
priority transit service connecting major commercial
nodes and coinciding with increased density.
High Use Pedestrian Paths and Bike Routes have been
identified throughout Urban + Farm Phase 2. These
pathways provide connections from residential areas
to park spaces and the village center. Please refer to
13 URBAN + FARM PHASE 2
the Parks Master Plan for additional information.
M-1.9 Prioritize and construct key bicycle infrastructure,
to include wayfinding signage, connections, and
enhancements with emphasis on completing network
connectivity.
The continuation of Bike Lanes along Laurel Parkway
is included in the neighborhood design. This north/
south passage on the west side of town will ultimately
terminate at the 10 ft wide multiuse path adjacent to
Huffine and will serve as a significant enhancement for
bicycle infrastructure for the city.
M-2.5 Develop safe crossings along priority and high
utilization pedestrian and biking corridors.
Around the Village core, the principal commercial
gathering hub, multi-modal safety is enforced through
the following design elements including: Pedestrian
bulb outs to decrease walking distance; Back-in
diagonal parking to improve visibility; Mid-block
crossings to slow traffic while reducing jaywalking;
Maximum speed limit of 25 to reduce pedestrian
and cyclist fatalities; and Roadway material changes
at key pedestrian crossings to alert drivers of an
upcoming crossing. Beyond the Village Core, active
mobility corridors feature separated and/or dedicated
infrastructure for active mobility uses to reduce
conflicts with vehicles.
14 CUSHING TERRELL
Items Waived During Pre-App
7. Agriculture
8. Agricultural Water user Facilities
17. Miscellaneous
18. Affordable Housing
Items Not Waived During Pre-App
1. Surface Water – Within the Phase 2 area,
there currently exists Baxter Creek along the eastern
part of the site, as well as an unnamed stream-ditch
coming in from the south-east, neither of which have a
floodplain associated with them.
a. See the included Preliminary Construction
drawings for a reference to both the surface water
components.
b. Baxter Creek and the unnamed stream-ditch
are the only 2 surface water components existing on
site, both of which have water flowing year-round.
With the exception of the work to re-route the
stream-ditch along the south property line (within the
proposed open space), as well as the proposed re-
routing of Baxter Creek to enhance the sinuosity of the
Creek back to historical features (all of which is being
reviewed through the ACOE & GCD), no work will be in
or near the ditches for the subdivision.
c. As noted above, both Baxter Creek and the
stream ditch are currently being proposed to be re-
routed. The preliminary plans for the stream-ditch are
included in the preliminary Construction Drawings,
and the Baxter Creek enhancement is under review
with the ACOE and wetland specialists.
d. Noted, a Wetland delineation has been
conducted and is provided with the application.
e. No permits are currently in hand but are in
review with the appropriate authorities.
2. Floodplains – N/A, no floodplains or regulated
flood hazard areas currently exist on the site. Baxter
Creek is a controlled creek while the unnamed stream-
ditch is solely groundwater based.
3. Groundwater – Groundwater is known to
be relatively high on the site. Four (4) monitoring
wells have been regularly checked to establish
seasonally high groundwater levels. There is no on-site
stormwater proposed that could potentially degrade
groundwater. Potential conflicts associated with high
groundwater have been addressed on the preliminary
plat. Basements will not be allowed as per previous
platting phases.
4. Geology – There are no known geologic
hazards associated with the site. There is no unusual
soil, topographic or geologic conditions associated
with the property. Included with this submittal is a
Geotech report that includes soil properties. No large
cuts or fills will be associated with the site, with only
general site grading being performed.
5. Vegetation – See the included wetland
delineation report for any mention of critical plantings
along Baxter Creek. Any existing trees onsite will be
preserved if allowed and practical. Also included
with the application is the approved Noxious Weed
Management Plan that was obtained through the GC
Weed Department.
BMC 38.220.060- Documentation of Compliance
with Adopted Standards
15 URBAN + FARM PHASE 2
6. Wildlife –
a. N/A, no species of concern are noted on the
Montana National Heritage Program or through FWP.
b. No known areas are located within the areas
of the subdivision.
c. N/A, no public access to public lands exists
within the site.
d. N/A, no wildlife habitat exists within the site,
therefore no protective measures are necessary.
e. FWP has been contacted for this development,
but their history lately has been to not provide a
response unless one is deemed to be necessary. Any
correspondence will be passed along if received.
9. Water and Sewer – Included with this
submittal is an engineering report demonstrating the
proposed water and sewer systems and capacities.
Water rights will be paid cash in lieu.
10. Stormwater management – A stormwater plan
is included in the engineering report included with
this submittal. The subject property was not planned
within the Norton Ranch development, however a
portion of the oversized capacity of the recent Phase
5 ponds will be utilized. There is existing surrounding
infrastructure that will be utilized as well as proposed
infrastructure that will tie into existing as well as the
majority of the site will be retained/detained on site.
11. Street, Roads, and Alleys – A combination of
streets will be constructed with this phase, with the
major components being the continuation of Laurel
Parkway to Huffine Lane, a new signalized intersection
there, as well as 2 additional access points onto
Huffine Lane (3/4 turn & right-in/right-out), pending
MDT approval. In addition, local access points will
be connected to at South Eldorado, South Reliance,
Pond Lily, Water Lily & Competition Drive. The Laurel
Parkway existing road section will be carried through
the site, including the on-street parking, bike lanes,
pedestrian walkways and a new shared use path. All
roadways will consist of curb & gutter and asphalt
paving to control dust and provide a longstanding
product. An updated TIS for the subdivision is
included with the application, outlining the traffic
generation, affected intersection and applicable
recommendations.
12. Non-Municipal Utilities – Non-municipal utility
companies have been contacted to provide service,
copies of emails have been provided from the previous
phases of the development as multiple companies
iterated that if they can serve 1 phase, they can serve
them all.
13. Land Use.
Please see previous narrative.
14. Parks and Recreation.
Please see Parks Master Plan.
15. Neighborhood Center
Please see Parks Master Plan
16. Lighting Plan
Please see Landscape plan sheets
17. Growth Policy
Please see previous narrative.
16 CUSHING TERRELL
Subdivision Preliminary Plat
Submittal Requirements
1. Preliminary Plat Checklist
A checklist is included in the submittal documents.
2. Pre-Application Information
All pre-application comments and responses are
included as a separate document.
3. Subdivision Information
This information is found on the plat drawings
included in the civil plan set.
4. Subdivision Map
This is found on the Plat and construction documents
included in the civil plan set.
5. Streets, Road & Grades
6. Adjoining subdivisions
This information is found on the plat drawings
included in the civil plan set.
7. Adjoining Owners.
This information is found on the plat drawings
included in the civil plan set.
8. Perimeter Survey.
This information is found on the plat drawings
included in the civil plan set.
9. Section Corner.
This information is included on the plat drawings
included in the civil plan set.
10. Phase Improvements.
No phasing is proposed with this development. All
required improvements will be installed prior to final
plat, at the expense of the developer, or depending
on the timing of the non-essential items, may be
bonded off on at the time of final plat application.
Concurrent construction is NOT being requested for
this subdivision.
11. Contours
Please see the included Preliminary Plat as well as the
Preliminary Construction plans included in the civil
plan set.
12. Waivers
The waivers granted during the pre-app process
include;
- Agriculture
- Agricultural Water User Facilities
- Miscellaneous
- Affordable Housing
Those waivers NOT granted are addressed herein.
13. DEQ Exemptions Request
All applicable design reports and application forms are
provided with this submittal to initiate the Municipal
17 URBAN + FARM PHASE 2
Facilities Exclusion and exempt the subdivision
from DEQ review. All water, sewer and stormwater
infrastructure will be installed/completed prior to final
plat approval. Please find the included draft MFE form
with this application.
Sec. 38.220.040.B - Preliminary plat supplements
required for all subdivisions
1. Area Map
See the included Preliminary Plat & the Preliminary
Construction Plans
2. Non-compliance with standards.
No variances are requested with this application.
3. Noticing Materials
See Noticing Requirements (Form N1) & the Adjoiner
lists
4. Documents & Certificates.
CCRs & By-laws are included
Preliminary MDT approval letter is included in the civil
documents
The Plat drawing includes all required certificates
Maintenance of streets, parks & other improvements is
included in the CC&R & By-law documents.
5. Street Profile sheets.
No grades greater than 5% are proposed. See the
included Preliminary Engineering Plans.
6. Application & Fee
Major Subdivision Base fee: TBD
Scaled Fee: 19 buildable lots, 4 dedicated park lots and
8 open space lots.