Loading...
HomeMy WebLinkAbout74,115 Northern Pacific Railway Co N o, 74115 NORTHERN PACTr'IC RAILuvAY CO14PANY1, hereinafter called the first party, hereby permits CITY of BOZEI4AN,, a municipal_ co -,pora.- tion of the State of Montana, hereinafter called the serand party, to construct, operate and maintain upon its right of way and beneath its tracks a 21, inch sewer pipe line along; the course described as follows: Entering; the first party' s Main Line right of way in. Section 6., Township 2 South, Range 6 East, Montana Prin- c1pal Meridian, at Bozeman station, Montana, which right of way is 200 feet wide on each side of the center lane, of its main track as now constructed, at a point, in he northeasterly line thereof distant 402 feet more or less, northwesterly, measured along said center line, from Mile Post 141 (which mile post is located 2183 feet south- easterly, measured along; said center line , from the north line of said section) ; thence southwesterly to a point distant 85 feet, more or less, northeasterly, measured at right angles, from said center line and. 442 feet north- westerly, measured along; said center line, from said mile post; thence southwesterly at right angles to said center line 255 feet,, more or less, and passing beneath the .first party' s tracks; thence westerly to a point in the a) uth- westerly line of said. right of way distant 462 feet, more or less,, northwesterly, rrieasurer a:Long said center line, from said mile post where it leaves said right of way; Also entering; the first party' s Alternate Main Line right of way in said section and at said station, which is 100 feet wide on the northerly side and 130 .feet wide or, the southerly side of the center line of the first party' s main track as now constructed at a point in the northerly line thereof distant 1253 feet, more or less, westerly, measured along the last mentioned center line, from Mile Post 141 (which. mile post is located 1852 feet easterly, measured ,long said last mentioned center Line , 'Crory the; west line of said section) ; thence westerly to a point distant 90 feet, more or less, northerly, measured at right angles, from said last mentioned center line and 12�3 feet westerly,, measured along said last mentioned center line , from the last mentioned mile posts, thence southerly at right angles to said last mentioned center line 170 feet, more or less, and passing beneath the first party' s tracks; thence westerly to a point in the souther- ly line of the last mentioned right of way distant 1468 feet more or less, westerly, measured along said last mentiond center line from said. last mentioned mile post where it; leaves said last mentioned right of way, This permission is granted upon the following; terms., 1. The entire cost shall be borne by the second party,- the estimate, the second party will pay the additional amount when, called upon; if the actual cost is less 1.-han the estimate, the first party will repay the surplus. All work hereunder by the second party shall be done in a first-class workmanlike manner to the satisfac- tion of the division superintendent of the first party, and in accor- dance with plans and specifications which he may prescribe or approve, The division superintendent of the first party shall have the right at any time when. in his judgment it becomes necessary or advisable, to require any material used. in the work to be replaced with like material or with material of a more permanent character; also tc,) require additional work or changes of location as a matter of safe- ty, or of appearance, or on account of additional tracks being laid, change of grade, or for any other reason connected with the operation of the railroad of the first party; all of which shall be done at the expense of the second party in the manner herein provided,, 2. The second party agrees that the improvements shall. not at any time damage the railroad or structures of the first party, or be a menace to the safety of its operation; and to indemnify and save harmless the first party .from all. loss and. damage to its tracks, roadbed, structures, rolling stook and other property of the first party and property of third persons, and from injuries to persons occasioned by the improvements,, 3, It is agreed that the provisions of Section 2 are .for the equal protection of any other railroad company or companies heretofore or hereafter granted the joint use of the first party' s property of which the premises upon which said improvements are located are a part. 14 . This permit cannot be transferred or assigned by the second party without the written consent of the first party 5. If the second party shall at any time cease to main- tain and operate the said pipe line or shall fail faithfully to their former state ,, 6. Said pipe line shall be constructed and maintained in accordance with the specifications hereto attached, marked Exhibit A and made a part hereof,, 7, Upon request of the first party, made at any time, that it be permitted to dispose of sewerage through said pipe line„ the second party will make connection therewith for the benefit of the first party, without requiring payment of any fee therefor,, except the actual cost of labor and material, used by the second party in making such connection. In the event that such sewer connection is made the first party shall pay the second party for disposal of sewerage through said sewer pipe at the same rate as any other, common use thereof. 8. This permit is granted subject to the rights granted by the first party to Jessie E. Francis under a cultivation license numbered 70432 and dated April 1, 1949 and T, B, Story under an irrigation ditch permit numbered 16487 and dated June 1, 1905, 9. The second party further agrees that in any contract which it shall let for the construction of said sewer on the right of way of the first party under this permit, it shall Y provide as follows, a, The Contractor shall indemnify and save harmless the first party from any and all claims, suits, 'losses, damages or expenses on account of injuries to or death of any and all persons, whomsoever, including the Con- tractor, Subcontractors, employes of the Contractors Subcontractors and of the first party, and any and all property damage arising or growing out of, or in any manner connected with the work performed under this contract,, or caused or occasioned in whole or in part, by reason of the presence of the person or of the property of the Contractor, Subcontractors, their employes or agents, upon or in proximity to the property of the first party, b, The Contractor shall procure and furnish to the first party the insurance policy, or in lieu thereof a certified copy of said policy as provided for in paragraph "C" hereof, together with an endorsement injuries to or death of two nr more persons in any P_no accidents and reE_'ula.r. Contractor° s Propei`ty Darn,,, (ge Liability Insurance providing for a limit of not less than Twenty-Five Thousand Dollars f $2;n 000,,G0) for al".""' damages to or destruction of property in any one accident, and subject to that limit., a total ( or aggregate ) 13-mit of Fifty Thousand. Dollars (��150 v 000�00) .for all, damage-s to or c;estruction of pro-certy during; ttiie poll y period, All such policies shall be approved by the first party as to the insurance company' writing; same , the amount and the form, IDI 'WITNESS 'vdHEREOF, the parties have executed these presents this Ihth day of July, 1.951. NORTHERN FACII01C RAIL'ru/tY Attest: CIII'Y of BOZEI, � % I By Christopher J.Danos }�i va✓ Assistant Vice President Montana Rail Link, Economic Development&Real Estate M.50 Lou4k4�,Orive Montana Rail Link,Inc. ;:o;s Vycrlh_;X 76131 101 International Dwe (406)523.1500 Post Office Box 16390 (406)523-149 3 fax 10issoula,Montana v vA,;montanarail corn Chrstopher Danos v 6N_-com USA 59303 November 23, 2023 Via Certified Mail City of Bozeman-Permits PO Box 1230 Bozeman, MT 59771 Re: Agreement 74115 dated effective as of 7/16/1951 (together with any subsequent supplements or amendments, the"Agreement")between Montana Rail Link,Inc., a Montana corporation ("MRL") and City of Bozeman-Permits,regarding certain property located at or near Bozeman, Gallatin County, Montana; Notice of Assignment. To Whom It May Concern: This letter concerns the Agreement referenced above. In accordance with the Agreement, MRL hereby notifies City of Bozeman-Permits that the land subject to the Agreement has either transferred or reverted to BNSF Railway Company, a Delaware corporation ("BNSF"). In connection therewith, MRL has assigned all of its rights, interests, and obligations under the Agreement to BNSF. BNSF, in turn,has assumed all of MRL's obligations under the Agreement. The assignment and assumption between MRL and BNSF will become effective on January 1, 2024 (the "Assignment Effective Date"). As of the Assignment Effective Date, BNSF's notice address is as follows: BNSF Railway Company 2650 Lou Menk Drive, MOB-2 Fort Worth, Texas 76131 Attn.: CRED with a copy to: Jones Lang LaSalle Brokerage, Inc. 2650 Lou Menk Drive,MOB-2 Fort Worth, Texas 76131 Attn.: Lease Administration If you make payments related to the Agreement, please be advised that the invoice for December 2023 will be sent to you by MRL in November 2023 and should be paid to MRL. The invoice for January 2024 will be sent you by BNSF's agent, Jones Lang LaSalle Brokerage, Inc., in December 2023 and should be paid to BNSF Railway Company. Thank you for your cooperation. r M22 Very truly yours, BNSF Railway Company, a Delaware corporation 1 By: Name: Christopher Danos Title: Assistant Vice President Montana Rail Link,Inc., a Montana corporation Z W I. Z-,, By: Name: Joe Racicot Title: President F 1oaf22