Press Alt + R to read the document text or Alt + P to download or print.
This document contains no pages.
HomeMy WebLinkAbout602,228 - City of Bozeman200'
EXHIBIT A
ENGINEERING DEPARTMENT
on paper
one-inch (1")
This should be
Verify scale!
GALLATIN
CITY COUNTY STATE
DATE
SECOND
SUBDIVISION
Sheet 1 of 1
SHEET
1" = 150'
SCALE
PLAT SHOWING LONGITUDINAL
MONTANA
"
BOZEMAN
JULY 7, 2019
FOR: CITY OF BOZEMANHYDHYD1447603+20STA 7610+10
MAIN TRACK
OF MAIN TRACK
DETAILS OMITTED SOUTH
Highway Easement
Highway Easement
RAILROAD RIGHT OF WAYHighway Easement
25'
11'
105'
AT 1-800-521-0579.
THIS CABLE AND AUTHORITY TO CROSS IT MUST BE OBTAINED FROM U.S. SPRINT
OPTIC CABLE ON MONTANA RAIL LINK RIGHT OF WAY IN THIS AREA. LOCATION OF
U.S. SPRINT COMMUNICATIONS COMPANY HAS INSTALLED AN UNDERGROUND FIBER
Varies
MP 144+0690'
Permittee's Expense May Be Required.
Right-Of-Way. A Railroad Flagger At
Days Before Starting Work On Railroad
223-3237, At Least Five (5) Working
Notify Roadmaster Chris Seymour, (406)
Required.
Flagger At Permittee's Expense May Be
Railroad Right-Of-Way. A Railroad
Working Days Before Starting Work On
(406) 570-5993, At Least Five (5)
Notify Signal Supervisor Nathan Kluck
WATER AND SEWER PIPELINES
Filepath: N:\NWB\2nd Sub\MP 143 CityofBozeman Water and Sewer TOP.dgn
HEREON.
SEWER PIPELINES, AS DEPICTED
LONGITUDINAL POTABLE WATER AND
: DESCRIPTION
(permit in process)
Existing longitudinal potable water pipeline
STA 7617+16 the railroad right of way
Both pipelines continue off
(permit in prgress)
sanitary sewer pipeline
Existing 1.5-inch dia.
on behalf of applicant
dated 02/2019, provided
Plan Sheet Excerpt W-7,
valve changes
hydrant and
pipeline, new
potable water
New longitudinal
to Sheet W-7 plan STA 8+20 only
New longitudinal sanitary sewer pipeline constructed
MP 144+1,396'
@Montana Rail LinkApplication for PipelineNew or ExistingPage 1 of 2There is a Nonrefundable $600.00 application fee for review of this application.Agreement Holder Information:Name of Agreement Holder:City of BozemanPhone No:(406) 582-2300Email Address:shohtz@bozeman.netContact Name & Phone No:Shawn Kohtz - (406) 582-2280Corporation (if any):State in which incorporated:Complete Business Address (if different from below):Complete Billing Address & Phone Number:20 East Olive Street, 1st FloorBozeman, MT 59715If not a corporation, name(s) of owners or partners: city of BozemanApplicant Reference No (if any):Pipeline Product Information:Application For (choose one):Product to be handled in pipeline: water0 Pipeline Crossing ® Pipeline parallel to track 0 BothLocation Information:Name of nearest city or town: BozemanCounty: GallatinState: MontanaDistance and direction from nearest Railroad milepost: Milepost 145.11 - 145.21 (95 feet to the Northeast)Quarter Section, Section, Township, Range: NW 1/4 Section 26, Township 1 South, Range 5 EastDistance in feet measured along the track from the point pipe crosses the track (main track or more than one track) to known point onRailroad (centerline of road crossing, center of railroad culvert, east or west end of a railroad bridge, points of a railroad switch):N/AIf a transfer of an existing Agreement, please provide current Agreement No.:Angle pipe will make with track at the point of crossing: N/ADistance from centerline of nearest track if a parallel pipeline encroachment: 95 feetIs crossing within a public road right of way? 8 Yes 0 NoName of road: Frontage RoadIf Yes:Right of way width60.feetUS Dept. of Transpori:ation Railroad Crossing No.: 060076U (nearest)Total length of pipeline on railroad right of way: 820 feetCarrier Pipe Information:Inside Diameter: 16"Wall Thickness: 0.37"Pipe material: Class 51 Ductile Iron PipeWorking pressure:132 PsiMaterial specification(s):AVWVAC151Cathodic protection provided?a Yes0 NoCoating: N/A
Application for PipelineNew or ExistingPage 2 of 2Casing Pipe Information:Inside diameter: N/AWall thickness: N/APipe material N/AMaterial specification: N/ALength of casing: N/ANumber of vents N/AConstruction Information:Method of installation (choose one):0 Other.0 Dry Boring 0 Jacking8 Trenching (for longitudinal installation only)Distance from header of dry boring or jacking pit to center of closest track measured perpendicular to track: N/AVertical distance from base of rail of lowest track to top of casing: N/ADistance from bottom of track ditch to top of pipe: 10.0 feetDistance below ground surface outside of track and track ditch area: 9.0 feetSubmit two (2) copies of this application along with plan view and cross sectional view sketches showing the proposedpipeline and the railroad track for total occupancy of railroad property. Show actual designed depths heights, and distances,not minimum standards.If in the opinion of Railroad, sufficient hazard is involved, Railroad will supply a flagman, with proper advance notice, or if thepipeline installation requires removal, replacement, modification, or locating of track, bridges, signals, railroad wires orpipelines, roads, or the supply of railroad engineering or supervision, the applicant agrees the full cost of such railroadservices will be borne by the agreement holder.Failure to provide all of the requested information will result in the automatic cancellation of this application.SignatLfr^ of Applicant^/-/^-/<fLDate^<^/y^ ^~^f^tf^^Title^If a consultant or other third party is preparing this application, please fill out the following:Tyler WilkensName of individual preparing application:Name of firm:Business Address of preparer:Telephone Number:Morrison-Maierle2880 Technology Blvd. West, Bozeman, MT 59715(406) 587-0721
16W16W16W16W16W16W16W16W16WWS
16W 16W 16W 16W 16W 16W 16W 16W 16W 16W 16W16W16W16WHYDHYD
///////////////////////////////////////////////////////////////////////////////////////////////////
///
///
///
///
///
///
///
///
///
//////////////////////////////////////////////////////////////////////////////////////////
OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP
OHPOHPOHPBT BT BT
BT BT BT BT BT BT BT BT BT BT BT BT BTBTBTBTBTBTBTBTBTBTBTBTBTBTBTBTBTGASGASGASGASBPBP
EFM EFM
E8W E8WEFMEFMEFMEFMEFMEFMEFMEFMEFMEFME8WE8WE8WE8WE8WE8WE8WE8WE8WE6W
E6W
E6W
UCD UCD UCDUCDUCDUCDUCDUCDUCD FMFMFMFMFMFMFMFMFMFMFM FM FM FM FM FM FM FM FM FM FMFMFMFMFM
FMFMFMFM16W16W16W16W16W16W16W16W16WWS
16W 16W 16W 16W 16W 16W 16W 16W 16W 16W 16W16W16W16WHYDHYD0+001+002+003+004+005+006+007+008+009+00TV
P
P
BT BT BT BT BT BT BTBTBTBTBTBTBTBTBTBTOHPOHPOHPOHP
OHPOHPBTBTBTBTBTBTBTBTBPNG
NG
OHP OHP OHP OHP OHP OHP OHP OHP
BT BT BT BT BT BT BT
NG NG NG NG NG NG NG NG NG NG NG NG NG NG NG NG
<<<<OSDBT BT BTBTIR
IR
STA 1+85.8 - 20.5' RT
NELSON ROAD STA 0+61.71 - 74.47' RT
NEW 16" 45 DEG HORIZ. BEND
STA 2+50.67 - 30.74' RT
NEW 16" 11.25 DEG HORIZ. BEND
STA 3+73.7 - 25.04' RT
DEFLECT PIPE JOINTS
NEW 16" GATE VALVE
13.00'
12.00'FM FM FM FM FM FM FM FM FM FM FM FMFMFMFMFMFMFMFM FM FM
4595
4600
4605
4610
4615
4620
4625
4595
4600
4605
4610
4615
4620
4625
0+00 0+50 1+00 1+50 2+00 2+50 3+00 3+50 4+00 4+50 5+00 5+50 6+00 6+50 7+00 7+50 8+00 8+50 9+00 9+50 10+00EG CL-4612.17EG CL-4612.39EG CL-4612.48EG CL-4612.42EG CL-4612.39EG CL-4612.41EG CL-4612.80EG CL-4613.41EG CL-4612.94EG CL-4613.38EG CL-EG CL-4616.20EG CL-4617.09EG CL-4617.47EG CL-4617.63EG CL-4618.08EG CL-4618.41EG CL-4618.56EG CL-4618.87EG CL-4618.67EG CL-4617.59EG CL-4617.87EG CL-4620.93EG CL-4620.78EG CL-4621.27EG CL-4621.61EG CL-4621.79EG CL-4621.37EG CL-4619.97EG CL-4619.38EG CL-4621.51EG CL-4621.60EG CL-4622.52EG CL-4622.26EG CL-4621.37EG CL-4619.32EG CL-4619.32EG CL-4619.53EG CL-4619.67EG CL-4620.00EG CL-4620.38FG CL-4612.84FG CL-FG CL-FG CL-4613.25FG CL-4613.05FG CL-4613.48FG CL-4614.48FG CL-4614.26FG CL-FG CL-FG CL-FG CL-FG CL-FG CL-FG CL-FG CL-FG CL-FG CL-FG CL-FG CL-FG CL-FG CL-FG CL-FG CL-FG CL-FG CL-FG CL-FG CL-FG CL-FG CL-FG CL-FG CL-FG CL-FG CL-FG CL-FG CL-FG CL-FG CL-FG CL-FG CL-FG CL-INV-INV-INV-INV-INV-INV-INV-INV-INV-4605.67INV-4605.58INV-4605.50INV-4606.06INV-4606.62INV-4607.19INV-4607.76INV-4608.32INV-4608.75INV-4609.18INV-4609.61INV-4610.04INV-4610.01INV-4609.90INV-4609.79INV-4609.68INV-4609.56INV-4609.45INV-4609.34INV-4609.23INV-4609.12INV-4609.01INV-4608.89INV-4608.78INV-4608.67INV-4608.56INV-4608.45INV-4608.72INV-INV-INV-INV-INV-STA 0+61.7116" 45 DEG HORIZ. BENDINV= 4606.03STA 2+50.6716" 11.25 DEG HORIZ. BENDINV= 4605.85STA 8+71.69
16 X 8 REDUCER
INV= 4608.69
STA 8+75.65
CONNECT TO EXISTING
8" MAIN AND INSTALL
NEW 8" GATE VALVE
INV=± 4608.72
EXISTING GRADE
AT PROPERTY LINE
MIN. 6.5' COVER (TYP.)
STA 8+64.28
16 X 12 TEE
INV= 4608.67
16W 16W 16W
OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP
BT BT BT BT BT BT BT BT BT BT BT BT
EFM EFM EFM
E8W E8W E8W E8W E8WE8W
E6WEFMEFMEFMEFMEFMEFME8WE8WE8WE8WFMFM16W 16W 16W
OHP OHP OHP OHP OHP OHP
BT BT BT BT BT BT BT BT BT BT
NG
OOBT BT BT BT BT BT BT BT BT BTFMFMFMFMFMFMFMFMFMFMFMFM
FMFMVERIFY SCALE!
THESE PRINTS MAY BE REDUCED.
LINE BELOW MEASURES ONE INCH
ON ORIGINAL DRAWING.
MODIFY SCALE ACCORDINGLY!
2019COPYRIGHT © MORRISON-MAIERLE, INC.,
SHEET NUMBER
PROJECT NUMBER
DRAWING NUMBER
DATEDESCRIPTIONNO.BY
N:\2286\009\04 DESIGN\PERMITS\MDT & RAILROAD\WATER (FOR MRL PERMIT).DWG PLOTTED BY:TYLER WILKENS ON Jun/14/2019
REVISIONS DRAWN BY:
DSGN. BY:
APPR. BY:
DATE:
Q.C. REVIEW
DATE:
BY:
2880 Technology Blvd West
Bozeman, MT 59718
406.587.0721
www.m-m.net
engineers surveyors planners scientists
MorrisonMaierle
NELSON MEADOWS SUBDIVISION
INFRASTRUCTURE IMPROVEMENTS
2286.009
MONTANA
FRONTAGE ROAD WATER CONNECTION
W-7
CPK
CPK
MEE
02/2019
BOZEMAN
CONNECTION TO EXISTING WATER MAIN
SCALE: 1" = 10'
1
-
0
VERT. SCALE IN FEET
0
HORIZ. SCALE IN FEET
2.55 5 10
2550 50 100
FRONTAGE ROAD
02/25/2019NELSON
ROAD
EXISTING 8"
WATER MAIN (TYP.)
EXISTING 8" TEE
REMOVE EXISTING CAP
INSTALL NEW 8" GATE VALVE
EXISTING
FIRE
HYDRANT
NEW 16 X 8 REDUCER
NEW 16 X 12 TEE
WITH STUB AND CAP
TO THE SOUTHWEST
FRONTAGE ROAD
INSTALL 686 LF 16" AND ±10 LF 8"
CLASS 51 D.I. WATER PIPE
TYPE A TRENCH BACKFILL
TYPE 1 BEDDING
NEW GATE VALVE ON
EXISTING 8" MAIN
NEW GATE VALVE ON
EXISTING 8" MAIN
PROPERTY BOUNDARY
MDT FACILITY
COS 473F
EXISTING 1.5" MDT
SEWER FORCE MAIN
INSTALL NEW PRESSURE REDUCING
VALVE (PRV) ON EXISTING 8" WATER
MAIN SEE SHEET D-4
EXISTING LIGHT POLE
TO BE REMOVED
CONNECTION TO EXISTING 8" WATER MAIN.
CONTRACTOR TO VERIFY HORIZONTAL AND VERTICAL LOCATION.
NOTE:
CONTRACTOR TO VERIFY HORIZONTAL ANDVERTICAL LOCATION OF EXISTING WATER MAIN.
EXISTING SEWER FORCE MAIN
MATC
H
LI
N
E
SEE
S
H
E
E
T
W-
5
FUTURE LOCATION OF
PRESSURE REDUCING
VALVE (PRV)
EXISTING PUBLIC
ROADWAY EASEMENT
(TYP.)
RAILROAD R/W
(TYP.)
EXISTING 8"
WATER MAIN
EXISTING
ROADWAY EOA
(TYP.)
PROPOSED NELSON
ROAD APPROACH
EXISTING NELSON
ROAD APPROACH MDT STATIONING:
RR 7614+04
R/W 52+60.00
R/W = EX. RR. R/W
EXISTING PUBLIC
ROADWAY EASEMENT
(TYP.)
PLAN A
FUTURE SEWER FORCE
MAIN CONNECTION
PLAN B
FUTURE SEWER FORCE
MAIN CONNECTION
FUTURE CITY OF BOZEMAN
DAVIS LANE LIFT STATION
CIP #WWIF24
OHP OHP OHP OHP OHP
BT BT BT BT
BT
WV DYHWV
NG NG NG NG NG NG NG NG NG
BP BP BP BP BP BP BP BP BP BP
<<<<<<OOOOOOOIL
BT BT BT BT BT BT BT BT BT
214626.02BM /BURY BOLT NORTH BO
L
TBOL
WVWVUCDUCDUCDUCDUCDUCDUCDUCDUCD
UTILUTILUTIL UTIL
UTILUTIL UTIL
PPBPPB16W16W16W16W16W16W 16W 16W 16W 16W 16W 16W 16W 16W 16W 16W 16W16W16W16WHYDHYD0+001+002+003+004+005+006+007+008+009+0010+0011+0012+0013+0014+0012.00'
STA 1+92.95 - 9.97' RT
NEW 45 DEG. HORIZ. BEND
STA 2+48.96 - 18.81' RT
NEW 11.25 DEG HORIZ. BEND
////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////
///
///
///
///
///
///
///
///////////////////////////////////////////////////////////////////////////////////////OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP
OHPOHPOHPBT BT BT BT
BT BT BT BT BT BT BT BT BT BT BT BT BT BT BT BT BT BT BT BT BTBTBTBTBTBTBTBTBTBTBTGASGASGASBPEFMEFMEFMEFMEFMEFMEFMEFMEFMEFMEFM
E8W E8W E8W E8W E8W E8W E8W E8W E8W E8W E8WEFMEFMEFMEFMEFMEFMEFME8WE8WE8WE8WE8WE8WNELSON STA 0+70.76 - 83.42' RT
FRONTAGE ROAD STA 1+92.95
NEW 45 DEG. HORIZ. BEND
13.00'
FM FM FM FM FM FM FM FM FM FM FMFMFMFMFMFMFMFMFMFMFMFMFMFMFM FMFMFMFMFMFMF
M
FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM
PV - FRONTAGE-RD
4590
4595
4600
4605
4610
4615
4620
4625
4590
4595
4600
4605
4610
4615
4620
4625
0+00 0+50 1+00 1+50 2+00 2+50 3+00 3+50 4+00 4+50 5+00 5+50 6+00 6+50 7+00 7+50 8+00 8+50 9+00 9+50 10+00 10+50 11+00EG CL-4612.17EG CL-4612.39EG CL-4612.48EG CL-4612.42EG CL-4612.39EG CL-4612.41EG CL-4612.80EG CL-4613.41EG CL-4612.94EG CL-4613.38EG CL-EG CL-4616.20EG CL-4617.09EG CL-4617.47EG CL-4617.63EG CL-4618.08EG CL-4618.41EG CL-4618.56EG CL-4618.87EG CL-4618.67EG CL-4617.59EG CL-4617.87EG CL-4620.93EG CL-4620.78EG CL-4621.27EG CL-4621.61EG CL-4621.79EG CL-4621.37EG CL-4619.97EG CL-4619.38EG CL-4621.51EG CL-4621.60EG CL-4622.52EG CL-4622.26EG CL-4621.37EG CL-4619.32EG CL-4619.32EG CL-4619.53EG CL-4619.67EG CL-4620.00EG CL-4620.38EG CL-4620.52EG CL-4620.85EG CL-4621.26EG CL-4621.70FG CL-4612.84FG CL-FG CL-FG CL-4613.25FG CL-4613.05FG CL-4613.48FG CL-4614.48FG CL-4614.26FG CL-FG CL-FG CL-FG CL-FG CL-FG CL-FG CL-FG CL-FG CL-FG CL-FG CL-FG CL-FG CL-FG CL-FG CL-FG CL-FG CL-FG CL-FG CL-FG CL-FG CL-FG CL-FG CL-FG CL-FG CL-FG CL-FG CL-FG CL-FG CL-FG CL-FG CL-FG CL-FG CL-FG CL-FG CL-FG CL-FG CL-INV-INV-INV-INV-INV-INV-INV-INV-INV-4606.51INV-4606.76INV-4607.03INV-4607.29INV-4607.56INV-4607.83INV-4608.09INV-4608.36INV-4608.62INV-4608.89INV-4609.15INV-4609.42INV-4609.68INV-4609.95INV-4610.21INV-4610.48INV-4610.75INV-4611.01INV-4611.28INV-4611.54INV-4611.81INV-4612.02INV-4612.03INV-4612.03INV-4612.04INV-4612.04INV-4612.05INV-4612.24INV-4612.46INV-4612.69INV-4612.91INV-4613.13INV-4613.35INV-4613.57INV-4613.79INV-4614.01INV-4614.23STA 1+92.9545 DEG. HORIZ. BENDINV= 4606.36STA 2+48.9611.25 DEG HORIZ. BENDINV= 4606.91MIN. 6.5' COVER (TYP.)STA 3+73.38DEFLECT PIPE JOINTSINV = 4607.22PROPOSED 16"
WATER MAIN
EXISTING GRADE
AT PROPERTY LINE
RE-GRADE LOW
SPOT TO ENSURE
ADEQUATE COVER
STA 8+52.43
45 DEG. HORIZ BEND
INV= 4611.96
STA 8+19.12
45 DEG HORIZ BEND
INV= 4611.93
MIN. 1.5'
CLEARANCE
VERIFY SCALE!
THESE PRINTS MAY BE REDUCED.
LINE BELOW MEASURES ONE INCH
ON ORIGINAL DRAWING.
MODIFY SCALE ACCORDINGLY!
2019COPYRIGHT © MORRISON-MAIERLE, INC.,
SHEET NUMBER
PROJECT NUMBER
DRAWING NUMBER
DATEDESCRIPTIONNO.BY
N:\2286\009\04 DESIGN\PERMITS\MDT & RAILROAD\SEWER (FOR MRL PERMT).DWG PLOTTED BY:TYLER WILKENS ON Jun/14/2019
REVISIONS DRAWN BY:
DSGN. BY:
APPR. BY:
DATE:
Q.C. REVIEW
DATE:
BY:
2880 Technology Blvd West
Bozeman, MT 59718
406.587.0721
www.m-m.net
engineers surveyors planners scientists
MorrisonMaierle
NELSON MEADOWS SUBDIVISION
INFRASTRUCTURE IMPROVEMENTS
2286.009
MONTANA
FRONTAGE ROAD SEWER FORCE MAIN
STA 0+00 TO END
SS-8
CPK
CPK
MEE
02/2019
1 CITY REVIEW 05/17/2019CPK
BOZEMAN
FRONTAGE ROAD
02/25/2019NELSON
ROAD
PROPERTY LINE (TYP.)
0
VERT. SCALE IN FEET
0
HORIZ. SCALE IN FEET
2.55 5 10
2550 50 100
MDT FACILITY
COS 473F EXISTING 1.5" MDT
SEWER FORCE MAIN
FRONTAGE ROAD
SEWER FORCE MAIN
INSTALL 628 LF 6" PVC C900 SEWER PIPE
TYPE A TRENCH BACKFILL
TYPE 1 BEDDING
MATCH LI
NE
SEE SHEET SS-5
OVERHEAD POWER (TYP.)
LIGHT POLE TO BE REMOVED
BURIED TELEPHONE (TYP.)
FUTURE CITY OF BOZEMAN
DAVIS LANE LIFT STATION
CIP #WWIF24
EXISTING PUBLIC
ROADWAY EASEMENT
(TYP.)
RAILROAD R/W
(TYP.)
EXISTING 8"
WATER MAIN
EXISTING
ROADWAY EOA
(TYP.)
PROPOSED NELSON
ROAD APPROACH EXISTING NELSON
ROAD APPROACH
PLAN A
FUTURE SEWER FORCE
MAIN CONNECTION
MDT STATIONING:
RR 7614+04
R/W 52+60.00
R/W = EX. RR. R/W
PLAN B
FUTURE SEWER FORCE
MAIN CONNECTION
EXISTING 1.5" MDT
SEWER FORCE MAIN
EXISTING 8"
WATER MAIN
CITY OF BOZEMAN
WATER RECLAIMATION FACILITY
MDT STATIONING:
RR 7605+46
R/W 49+98.36
200'
EXHIBIT A
ENGINEERING DEPARTMENT
on paper
one-inch (1")
This should be
Verify scale!
GALLATIN
CITY COUNTY STATE
DATE
SECOND
SUBDIVISION
Sheet 1 of 1
SHEET
1" = 150'
SCALE
PLAT SHOWING LONGITUDINAL
MONTANA
"
BOZEMAN
JULY 7, 2019
FOR: CITY OF BOZEMANHYDHYD1447603+20STA 7610+10
MAIN TRACK
OF MAIN TRACK
DETAILS OMITTED SOUTH
Highway Easement
Highway Easement
RAILROAD RIGHT OF WAYHighway Easement
25'
11'
105'
AT 1-800-521-0579.
THIS CABLE AND AUTHORITY TO CROSS IT MUST BE OBTAINED FROM U.S. SPRINT
OPTIC CABLE ON MONTANA RAIL LINK RIGHT OF WAY IN THIS AREA. LOCATION OF
U.S. SPRINT COMMUNICATIONS COMPANY HAS INSTALLED AN UNDERGROUND FIBER
Varies
MP 144+0690'
Permittee's Expense May Be Required.
Right-Of-Way. A Railroad Flagger At
Days Before Starting Work On Railroad
223-3237, At Least Five (5) Working
Notify Roadmaster Chris Seymour, (406)
Required.
Flagger At Permittee's Expense May Be
Railroad Right-Of-Way. A Railroad
Working Days Before Starting Work On
(406) 570-5993, At Least Five (5)
Notify Signal Supervisor Nathan Kluck
WATER AND SEWER PIPELINES
Filepath: N:\NWB\2nd Sub\MP 143 CityofBozeman Water and Sewer TOP.dgn
HEREON.
SEWER PIPELINES, AS DEPICTED
LONGITUDINAL POTABLE WATER AND
: DESCRIPTION
(permit in process)
Existing longitudinal potable water pipeline
STA 7617+16 the railroad right of way
Both pipelines continue off
(permit in prgress)
sanitary sewer pipeline
Existing 1.5-inch dia.
on behalf of applicant
dated 02/2019, provided
Plan Sheet Excerpt W-7,
valve changes
hydrant and
pipeline, new
potable water
New longitudinal
to Sheet W-7 plan STA 8+20 only
New longitudinal sanitary sewer pipeline constructed
MP 144+1,396'