HomeMy WebLinkAboutCOMMUNITY FIRST - GRIFFIN PLACE PH 1 (HOMEWARD POINT - HRDCEXISTINGEXISTINGPROPOSEDPROPOSEDCIVIL PLAN SHEET INDEXABBREVIATIONSLEGENDLIGHTING PLAN SHEET INDEXT1.0HRDCHOMEWARD POINTBOZEMAN, MONTANAPROFESSIONALENGINEERS &SURVEYORSHOMEWARD POINT
STAHLYENGINEERING& ASSOCIATESHRDC
206 EAST GRIFFIN DR.
BOZEMAN, MTENGINEER OF RECORD:QUALITY CONTROL REVIEWER:,PETITLE,PEPHASE 1 RECORD DRAWINGSSEPTEMBER 20, 2023
GENERAL CIVIL NOTESGENERAL UTILITY NOTESWATER SYSTEM NOTESCONSTRUCTION STAKING NOTESSANITARY SEWER SYSTEM NOTESON-SITE MATERIALS TESTINGMATERIALS SUBMITTALS REQUIREDC0.1CIVILSPECIFICATIONSPROFESSIONALENGINEERS &SURVEYORSHOMEWARD POINT
STAHLYENGINEERING& ASSOCIATESHRDC
206 EAST GRIFFIN DR.
BOZEMAN, MTPHASE 1 RECORD DRAWINGSSEPTEMBER 20, 2023
298'GRIFFIN DRIVEPROJECT SITE5.24 ACRESNORTH BUILDING27,089 SF FOOTPRINT206 E. GRIFFIN DR.SOUTH BUILDING14,500 SF FOOTPRINT208 E. GRIFFIN DR.18'26'40'26'18'12'18'26'18'36'30'12'20'12'24'11'8'20'74'13'44'96'26'30'24'12'9'40'26'26'18'26'18'18'2
6
'8'8'6
'11'1
2
'40'2
0
0
'MONTANA RAIL LINKPHASE 1PHASE 25'8'8'5'PROJECT SITE5.24 ACRESC1.0CIVIL SITE PLANPROFESSIONALENGINEERS &SURVEYORSHOMEWARD POINT
STAHLYENGINEERING& ASSOCIATESHRDC
206 EAST GRIFFIN DR.
BOZEMAN, MTPHASE 1 RECORD DRAWINGSSEPTEMBER 20, 2023
GRIFFIN DRIVENORTH BUILDING27,089 SF FOOTPRINT206 E. GRIFFIN DR.SOUTH BUILDINGMONTANA RAIL LINKPHASE 1PHASE 2C1.1ENLARGEDCIVIL SITE PLANNORTHPROFESSIONALENGINEERS &SURVEYORSHOMEWARD POINT
STAHLYENGINEERING& ASSOCIATESHRDC
206 EAST GRIFFIN DR.
BOZEMAN, MT PHASE 1 RECORD DRAWINGSSEPTEMBER 20, 2023
GRIFFIN DRIVENORTH BUILDING27,089 SF FOOTPRINT202 E. GRIFFIN DR.SOUTH BUILDINGMONTANA RAIL LINKPHASE 1PHASE 2C1.3SHALLOW UTILITY& SLEEVING PLANNORTHPROFESSIONALENGINEERS &SURVEYORSHOMEWARD POINT
STAHLYENGINEERING& ASSOCIATESHRDC
206 EAST GRIFFIN DR.
BOZEMAN, MT PHASE 1 RECORD DRAWINGSSEPTEMBER 20, 2023
GRIFFIN DRIVEPROJECT SITE5.24 ACRESNORTH BUILDING27,089 SF FOOTPRINT206 E. GRIFFIN DR.SOUTH BUILDING14,500 SF FOOTPRINT208 E. GRIFFIN DR.MONTANA RAIL LINKPHASE 1PHASE 2PROJECT SITE5.24 ACRESC2.0WATER PLANPROFESSIONALENGINEERS &SURVEYORSHOMEWARD POINT
STAHLYENGINEERING& ASSOCIATESHRDC
206 EAST GRIFFIN DR.
BOZEMAN, MTPHASE 1 RECORD DRAWINGSSEPTEMBER 20, 2023
NOTE: THE DETAILS SHOWN ON THIS PLAN ARE PROVIDED FOR EASE OFREFERENCE. OTHER STANDARD DETAILS MAY APPLY.NOTESNOTESNOTESNOTESNOTESNOTESNOTESC 2.1WATER DETAILSPROFESSIONALENGINEERS &SURVEYORSHOMEWARD POINT
STAHLYENGINEERING& ASSOCIATESHRDC
206 EAST GRIFFIN DR.
BOZEMAN, MT PHASE 1 RECORD DRAWINGSSEPTEMBER 20, 2023
0+001+002+003+004
+
0
0
PHASE 1
PHASE 2 NORTH BUILDINGBUILDING
PROFESSIONALENGINEERS &SURVEYORSHOMEWARD POINT
STAHLYENGINEERING& ASSOCIATESHRDC
206 EAST GRIFFIN DR.
BOZEMAN, MTC2.2WATER PLAN &PROFILE(WEST ACCESS)PHASE 1 RECORD DRAWINGSSEPTEMBER 20, 2023
3+290+001+002+003+00PHASE 1PHASE 2NORTHBUILDINGSOUTH BUILDINGC2.3WATER PLAN &PROFILE(DROP OFF)PROFESSIONALENGINEERS &SURVEYORSHOMEWARD POINT
STAHLYENGINEERING& ASSOCIATESHRDC
206 EAST GRIFFIN DR.
BOZEMAN, MT PHASE 1 RECORD DRAWINGSSEPTEMBER 20, 2023
0+001+002+003+004+00SOUTH BUILDINGNORTH BUILDINGC2.4WATER PLAN &PROFILE(EAST ACCESS)PROFESSIONALENGINEERS &SURVEYORSHOMEWARD POINT
STAHLYENGINEERING& ASSOCIATESHRDC
206 EAST GRIFFIN DR.
BOZEMAN, MT PHASE 1 RECORD DRAWINGSSEPTEMBER 20, 2023
0+000+501+001+06NORTH BUILDING27,089 SF FOOTPRINT206 E. GRIFFIN DR.C2.5WATER RISERROOM PLAN(N. BUILDING)PROFESSIONALENGINEERS &SURVEYORSHOMEWARD POINT
STAHLYENGINEERING& ASSOCIATESHRDC
206 EAST GRIFFIN DR.
BOZEMAN, MTRISER ROOM LAYOUTNOTESNOTESPHASE 1 RECORD DRAWINGSSEPTEMBER 20, 2023
GRIFFIN DRIVEPROJECT SITE5.24 ACRESNORTH BUILDING27,089 SF FOOTPRINT206 E. GRIFFIN DR.SOUTH BUILDING14,500 SF FOOTPRINT208 E. GRIFFIN DR.MONTANA RAIL LINKPHASE 1PHASE 2PROJECT SITE5.24 ACRESC3.0SEWER PLANPROFESSIONALENGINEERS &SURVEYORSHOMEWARD POINT
STAHLYENGINEERING& ASSOCIATESHRDC
206 EAST GRIFFIN DR.
BOZEMAN, MTPHASE 1 RECORD DRAWINGSSEPTEMBER 20, 2023
NOTE: THE DETAILS SHOWN ON THIS PLAN ARE PROVIDED FOR EASE OFREFERENCE. OTHER STANDARD DETAILS MAY APPLY.NOTES1500 GALLON GREASE INTERCEPTORSIDE VIEW1500 GALLON GREASE INTERCEPTORTOP VIEWNOTESNOTESNOTESNOTESTYPICAL SEWER SERVICE CLEANOUTNOTESC 3.1SEWER DETAILSPROFESSIONALENGINEERS &SURVEYORSHOMEWARD POINT
STAHLYENGINEERING& ASSOCIATESHRDC
206 EAST GRIFFIN DR.
BOZEMAN, MTPHASE 1 RECORD DRAWINGSSEPTEMBER 20, 2023
3+290+001+002+003+00PHASE 1PHASE 2NORTHBUILDINGSOUTH BUILDINGC3.2SEWER PLAN &PROFILE( DROP OFF)PROFESSIONALENGINEERS &SURVEYORSHOMEWARD POINT
STAHLYENGINEERING& ASSOCIATESHRDC
206 EAST GRIFFIN DR.
BOZEMAN, MT PHASE 1 RECORD DRAWINGSSEPTEMBER 20, 2023
0+001+002+003+004+00SOUTH BUILDINGNORTH BUILDINGC3.3SEWER PLAN &PROFILE(EAST ACCESS)PROFESSIONALENGINEERS &SURVEYORSHOMEWARD POINT
STAHLYENGINEERING& ASSOCIATESHRDC
206 EAST GRIFFIN DR.
BOZEMAN, MTPHASE 1 RECORD DRAWINGSSEPTEMBER 20, 2023
GRIFFIN DRIVEPROJECT SITE5.24 ACRESNORTH BUILDING27,089 SF FOOTPRINT202 E. GRIFFIN DR.SOUTH BUILDING14,500 SF FOOTPRINT206 E. GRIFFIN DR.MONTANA RAIL LINKSOUTH RETENTION BASINTOP ELEV: 4721.50TOP AREA: 1,270 SFBOTTOM AREA:416 SFBOTTOM ELEV: 4720.50PONDING DEPTH: 1 FTPONDING STORAGE: 843 CFGRAVEL STORAGE: 116 CFTOTAL STORAGE VOLUME: 959 CFNORTH RETENTION BASINBASIN TOP ELEV: 4718.50BASIN TOP AREA: 9,155 SFBASIN BOTTOM ELEV: 4717.00BASIN BOTTOM AREA: 6,208 SFPONDING DEPTH: 1.5 FTPONDING STORAGE: 11,522 CFGRAVEL STORAGE: 849 CFTOTAL STORAGE VOLUME: 12,371 CFPHASE 1PHASE 2PROJECT SITE5.24 ACRESC4.0 DRAINAGE PLANPROFESSIONALENGINEERS &SURVEYORSHOMEWARD POINT
STAHLYENGINEERING& ASSOCIATESHRDC
206 EAST GRIFFIN DR.
BOZEMAN, MTPHASE 1 RECORD DRAWINGSSEPTEMBER 20, 2023
ENHANCED INFILTRATION STRIP DETAILNOTESNOTE: THE DETAILS SHOWN ON THIS PLAN ARE PROVIDED FOR EASE OFREFERENCE. OTHER STANDARD DETAILS MAY APPLY.NOTESNOTESNOTESNOTES:STORMWATER INFILTRATION SYSTEMGENERAL STORMWATER SYSTEM NOTESBUILDING DRAINAGE DETAILSNOTESROOF DRAIN DETAILNOTESCLEANOUT DETAILCLEANOUT DETAILC 4.1DRAINAGEDETAILSPROFESSIONALENGINEERS &SURVEYORSHOMEWARD POINT
STAHLYENGINEERING& ASSOCIATESHRDC
206 EAST GRIFFIN DR.
BOZEMAN, MTPHASE 1 RECORD DRAWINGSSEPTEMBER 20, 2023
0+001+002+003+004+
0
0
PHASE 1
PHASE 2 NORTH BUILDINGPROFESSIONALENGINEERS &SURVEYORSHOMEWARD POINT
STAHLYENGINEERING& ASSOCIATESHRDC
206 EAST GRIFFIN DR.
BOZEMAN, MTC4.2ROAD PLAN &PROFILE(WEST ACCESS)PHASE 1 RECORD DRAWINGSSEPTEMBER 20, 2023
3+290+001+002+003+00PHASE 1PHASE 2NORTHBUILDINGSOUTH BUILDINGC4.3ROAD PLAN &PROFILE(DROP OFF)PROFESSIONALENGINEERS &SURVEYORSHOMEWARD POINT
STAHLYENGINEERING& ASSOCIATESHRDC
206 EAST GRIFFIN DR.
BOZEMAN, MT PHASE 1 RECORD DRAWINGSSEPTEMBER 20, 2023
0+001+002+003+004+00SOUTH BUILDINGNORTH BUILDINGC4.4ROAD PLAN &PROFILE(EAST ACCESS)PROFESSIONALENGINEERS &SURVEYORSHOMEWARD POINT
STAHLYENGINEERING& ASSOCIATESHRDC
206 EAST GRIFFIN DR.
BOZEMAN, MT PHASE 1 RECORD DRAWINGSSEPTEMBER 20, 2023
298'GRIFFIN DRIVEPROJECT SITE5.24 ACRESNORTH BUILDING27,089 SF FOOTPRINT202 E. GRIFFIN DR.SOUTH BUILDING14,500 SF FOOTPRINT206 E. GRIFFIN DR.18'26'40'26'18'12'18'26'18'36'30'12'20'12'24'11'8'20'74'13'44'96'26'30'24'12'9'40'26'26'18'26'18'18'2
6
'8'8'6'11'1
2
'40'2
0
0
'MONTANA RAIL LINKPHASE 1PHASE 25'8'8'5'PROJECT SITE5.24 ACRESPAVING LEGENDASPHALT(TRAFFIC RATED)CONCRETE SIDEWALK(NON-TRAFFIC RATED)CONCRETE(TRAFFIC RATED)PAVERS(NON-TRAFFIC RATED)CATCH CURB(FULL HEIGHT)SPILL CURB(FULL HEIGHT)CATCH CURB(LAYDOWN)SPILL CURB(LAYDOWN)CURB SCUPPERTHICKENEDEDGE SIDEWALKC5.0PAVING PLANPROFESSIONALENGINEERS &SURVEYORSHOMEWARD POINT
STAHLYENGINEERING& ASSOCIATESHRDC
206 EAST GRIFFIN DR.
BOZEMAN, MTPHASE 1 RECORD DRAWINGSSEPTEMBER 20, 2023
NORTH BUILDING27,089 SF FOOTPRINT202 E. GRIFFIN DR.SOUTH BUILDING14,500 SF FOOTPRINTPHASE 1PHASE 2C5.1ENLARGEDGRADING PLAN-NORTHPROFESSIONALENGINEERS &SURVEYORSHOMEWARD POINT
STAHLYENGINEERING& ASSOCIATESHRDC
206 EAST GRIFFIN DR.
BOZEMAN, MT GRADING NOTES:1.FINISHED GRADE CONTOURS ARE AT PAVEMENT GRADE.2.FINISHED GRADE CONTOUR INTERVAL IS 0.25'.3.SLOPE SIDEWALKS TO TOP BACK OF CURB AT 1.5% (TYP, 1% MIN, 2% MAX). WARP SIDEWALKGRADES TO BE LEVEL AT BUILDING ENTRANCES.4.ACCESSIBLE ROUTES (GENERALLY SIDEWALK AND MAIN BUILDING ACCESSES) TO COMPLYWITH ADA REQUIREMENTS.5.LANDSCAPED AREAS TO HAVE A SLOPE NO GREATER THAN 4h:1v.6.ENSURE THE WALKS ALONG THE ACCESSIBLE ROUTE HAVE A RUNNING SLOPE OF 1:20 OR 5%MAXIMUM (EXCEPT AT THE CURB RAMPS, WHICH CAN BE UP TO 1:12 OR 8.33%) AND A CROSSSLOPE OF 1:48 OR 2% MAXIMUM. THIS INCLUDES AT THE CROSSING OF DRIVE LANES.7.WHERE THE ACCESSIBLE ROUTES INTERSECT, A 48"X48" LEVEL "LANDING" THAT HAS ASLOPE OF 2% MAXIMUM IN ANY DIRECTION IS REQUIRED.8.ENSURE THE MANEUVERING CLEARANCES AT THE EXTERIOR SIDE OF ALL ENTRY DOORSAND AT BOTH SIDES OF GATES HAVE A SLOPE OF 1:48 OR 2% MAXIMUM IN ANY DIRECTION,AND A 1/2" MAXIMUM OVERALL CHANGE IN LEVEL AT THE THRESHOLDS.9.ENSURE A 30" X 48" CLEAR FLOOR SPACE (CFS) IS PROVIDED ADJACENT TO THE EXTERIORSITE ELEMENTS SUCH AS BENCHES, TRASH CANS, AND BIKE RACKS, AND HAVE A SLOPE OF1:48 OR 2% MAXIMUM IN ANY DIRECTION.10.SLOPE LANDSCAPED AREAS AWAY FROM BUILDING AT 5% MIN, 10% MAX GRADE FOR ADISTANCE OF 10 FEET.11.MAINTAIN POSITIVE DRAINAGE TO CURB INLETS. SLOPE ASPHALT TO NEW CURB AT 1% MIN,4% MAX.THIS SITE HAS BEEN DESIGNED IN COMPLIANCEWITH THE STANDARDS OF THE AMERICANS WITHDISABILITIES ACT (ADA) AS CERTIFIED BY THEENGINEER OF RECORD, STAHLY ENGINEERING.ZACH LOWE, PECERTIFIED BYPHASE 1 RECORD DRAWINGSSEPTEMBER 20, 2023
TYPICAL CONCRETE DRIVEWAY APPROACH, PAD,OR CROSSWALK SECTION (TRAFFIC AREAS)NOTESTYPICAL PAVEMENT SECTIONNOTESTYPICAL CONCRETE SIDEWALK SECTION (NON TRAFFIC)NOTESNOTESTHICKENED EDGE SIDEWALK SECTIONFRONT VIEWSIDE VIEWTYPICAL SCUPPER DETAILNOTESNOTESNOTE: THE DETAILS SHOWN ON THIS PLAN ARE PROVIDED FOR EASE OFREFERENCE. OTHER STANDARD DETAILS MAY APPLY.CURB FLOW TRANSITION DETAILNOTESNOTES:STRUCTURAL KEYSTONE BLOCK WALLNON-STRUCTURAL KEYSTONE BLOCK WALLNEW CHAIN LINK FENCENOTES:C 5.3SITE DETAILSPROFESSIONALENGINEERS &SURVEYORSHOMEWARD POINT
STAHLYENGINEERING& ASSOCIATESHRDC
206 EAST GRIFFIN DR.
BOZEMAN, MT PHASE 1 RECORD DRAWINGSSEPTEMBER 20, 2023
ISLAND DETAIL FOR DONOR DROP OFFRAMP DETAIL FORSIDEWALK PARALLEL TO CURBRAMP CONSTRUCTION NOTESRAMP DETAIL FORPLAZA SIDEWALKRAMP DETAIL FORSIDEWALK ADJACENT TO CURBRAMP DETAIL FORSIDEWALK PERPENDICULAR TO CURBNOTE: THE DETAILS SHOWN ON THIS PLAN ARE PROVIDED FOR EASE OFREFERENCE. OTHER STANDARD DETAILS MAY APPLY.RAMP DETAIL FORSIDEWALK ADJACENT TO CURBC 5.4SITE DETAILSPROFESSIONALENGINEERS &SURVEYORSHOMEWARD POINT
STAHLYENGINEERING& ASSOCIATESHRDC
206 EAST GRIFFIN DR.
BOZEMAN, MTPHASE 1 RECORD DRAWINGSSEPTEMBER 20, 2023
GRIFFIN DRIVEPROJECT SITE5.24 ACRESNORTH BUILDING27,089 SF FOOTPRINT202 E. GRIFFIN DR.SOUTH BUILDING14,500 SF FOOTPRINT206 E. GRIFFIN DR.MONTANA RAIL LINKPHASE 1PHASE 2PROJECT SITE5.24 ACRESSTRIPING/MARKING NOTES:NOTESEAST STOP BAR AND CROSSWALK MARKING DETAILWEST STOP BAR AND CROSSWALK MARKING DETAILC6.0SIGNAGE ANDSTRIPING PLANPROFESSIONALENGINEERS &SURVEYORSHOMEWARD POINT
STAHLYENGINEERING& ASSOCIATESHRDC
206 EAST GRIFFIN DR.
BOZEMAN, MT PHASE 1 RECORD DRAWINGSSEPTEMBER 20, 2023