Loading...
HomeMy WebLinkAbout24106 Application SummaryBOZEMANMT Community Development DEVELOPMENT REVIEW APPLICATION Remember to obtain owner signature on this form prior to uploading with the rest of your submittal PROJECT INFORMATION Project Name:2320 West Babcock Street Annexation Project Type(s):Annexation & Initial Zone Map Amendment ANNX Street Address:2320 W Babcock Street Bozeman, MT 59718 Legal Description: Parcels Shown Per Film 24, Page 425, and Film 24, Page 426 SE 1/4 S11, T2S, R5E, PMM, Gallatin County, MT Description of Project: Annexation and initial zoning of two parcels of land located at 2320 W Babcock Street. Current Zoning:N/A - Requesting Annexation / Out of City Existing Use:Mixed Proposed Use:Mixed Gross Lot Area:117829 Number of Buildings:0 Type and Number of Dwellings:0 Building Size (SF):5900 Non-Residential Building Size (SF):5900 Building Height (ft):20 Affordable Housing (Y/N):No Departure/Deviation Request (Y/N):No Zoning Verification Expedited (Y/N):No Wetlands Activity (Y/N): Traffic Study or Waiver:N/A - Application is not a Master Site Plan, Site Plan, Subdivision, or Planned Development Zone. PROPERTY OWNER Company Name:N/A Name:Luke Welborn Full Address:PO Box 6507, Bozeman, MT 59771 Email:lukewelborn@gmail.com Phone:(303) 482-7533 APPLICANT Company Name:White Mountain Engineering Name:Ethan Cote Full Address:PO Box 888 , Belgrade, Montana 59714 Email:ethan@wmtneng.com Phone:(603) 491-0927 REPRESENTATIVE Company Name:White Mountain Engineering Name:Ethan Cote Full Address:PO Box 888 , Belgrade, Montana 59714 Email:ethan@wmtneng.com Phone:(603) 491-0927 CERTIFICATIONS AND SIGNATURES Applicant signature is captured electronically at time of application submittal. This application PDF must also be signed by the property owner(s) for all application types before the submittal will be accepted. The only exception to this is an informal review application that may be signed by the applicant(s) only. The applicant(s) and property owner(s) submit this application for review under the terms and provisions of the Bozeman Municipal Code. It is further indicated that any work undertaken to complete a development approved by the City of Bozeman shall be in conformance with the requirements of the Bozeman Municipal Code and any special conditions established by the approval authority. I acknowledge that the City has an Impact Fee Program and impact fees may be assessed for my project. Further, I agree to grant City personnel and other review agency representative's access to the subject site during the course of the review process (Section 38.200.050, BMC). I (We) hereby certify that the above information is true and correct to the best of my (our) knowledge. Certification of Completion and Compliance - I understand that conditions of approval may be applied to the application and that I will comply with any conditions of approval or make necessary corrections to the application materials in order to comply with municipal code provisions. Statement of Intent to Construct According to the Final Plan - I acknowledge that construction not in compliance with the approved final plan may result in delays of pccupancy or costs to correct noncompliance. Property Owner Signature: Printed Name:Luke Welborn CONTACT US Alfred M. Stiff Professional Building phone 406-582-2260 20 East Olive Street fax 406-582-2263 Bozemn, MT 59715 planning@bozeman.net www.bozeman.net/planning