Loading...
HomeMy WebLinkAbout005 - A1_1 General Site Use PlanGENERAL BUILDING AREA GENERAL BUILDING AREA GENERAL BUILDING AREA GENERAL BUILDING AREA GENERAL BUILDING AREA GENERAL BUILDING AREA GENERAL BUILDING AREA GENERAL BUILDING AREA GENERAL BUILDING AREA GENERAL BUILDING AREA GENERAL BUILDING AREA GENERAL BUILDING AREA GENERAL BUILDING AREA EXISTING BUILDING EXISTING BUILDING EXISTING BUILDING EXISTING PARKING AREA EXISTING PARKING AREAEXISTING PARKING AREA EXISTING PARKING AREA PARKING & SERVICE AREA OPEN SPACE OPEN SPACE OPEN SPACE OPEN SPACE OPEN SPACE T ECHNOLOGY B LVD .INVENTION DRIVEW. GARFIELD STREET W. COLLEGE STREET RESEARCH DRIVEEXISTING RIPARIAN ZONE EXISTING RIPARIAN ZONE EXISTING RIPARIAN ZONE EXISTING RIPARIAN ZONE EXISTING MULTI-USE PATH PROPOSED MULTI-USE PATH PROPOSED MULTI-USE PATH MAXIMUM 175,000 GSF MAXIMUM 150,000 GSF MAXIMUM 150,000 GSF MAXIMUM 150,000 GSF MAXIMUM 125,000 GSF MAXIMUM 125,000 GSF MAXIMUM 60,000 GSF MAXIMUM 60,000 GSF MAXIMUM 150,000 GSF MAXIMUM 175,000 GSF MAXIMUM 100,000 GSF MAXIMUM 175,000 GSF MAXIMUM 150,000 GSF 78,000 GSF 22,000 GSF 90,000 GSF PARKING & SERVICE AREA PARKING & SERVICE AREA PARKING & SERVICE AREA PARKING & SERVICE AREA PARKING & SERVICE AREA PARKING & SERVICE AREA PROPOSED MULTI-USE PATH TO BE INSTALLED WITH THE NEXT DEVELOPMENT NORTH OF TECHNOLOGY BOULEVARD issue date project # phasesheet projectownerrevision date 9/1/2023 10:24:56 AMA1.1 09/07/2023GENERAL SITE USE PLAN22030 PDZ PRELIMINARY PLAN SUBMISSIONMSU INNOVATION CAMPUS PDZMSU INNOVATION CAMPUSNORTH SITE PLAN NOTES 1" = 80'-0"1 GENERAL SITE USE PLAN 1. The entire 41.98 acre parcel to have B-2 as a base district with PDZ relaxations as described in the accompanying narrative. The applicant acknowledges that that any referenced base district standards of the B-2 Zone or other standards not explicitly modified by the PDZ are subject to change if the B-2 base district is amended. 2. Phasing: Individual buildings on the MSUIC are being developed through a build-to-suit lease model with each building area shown on the site plan likely being developed at a unique point in time. As there is no set order to the build-out, there is no way to accurately assign phasing to the site plan. 3. General Landscaping: Emphasis will be placed on pedestrian connectivity throughout the campus and the creation of distinct, public open spaces at key locations as shown on the site plan. General landscaping will include street trees in the boulevard to continue the landscape language approved as part of the Aurora and Industry developments. Treatment of public open spaces will be a combination of hardscapes, seating elements and planting areas with the intention of encouraging the active utilization of these spaces. 4. General Land Use: It is proposed that the entire 42 acre parcel will be zoned B-2 with PDZ relaxations as described in the accompanying narrative. 5. Development Intensity: The maximum GSF number shown for each building area is based on the theoretical maximum of eight stories of building height times the rough area of the building area. This maximum GSF number is likely much larger than the actual development intensity that will be achieved by any individual development increment.