Loading...
HomeMy WebLinkAbout004 - C2_1 Concept PlanBFBFBFBFBFBFBFBFBFBFBFBFBFBFBFBFBFBFBFBFBFBFNGNGNGNGNGNGFFFFFDYHDYHSMWTTTTTWVWVWVWVWVWVWVFFFFFFTVEEEDYH DYHISSSSPPTTWVWVWVWVWVBFBFBFBFBFOHPOHPOHPOHPOHPOHPOHPOHPSSSWWWMWMWBTVBTVBTVBTVDSSSBF BF BFBF IIIDSSSSMWTWVNGNGOHPOHPDMWBFBFBFBFBFBFBFBFBFBFBFBFBFBFBF HYDHYDHYDHYDHYDWWWWWWWW WWWWWWWWWWWWWWOHP OHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPNGTPTPTPTP TPTPTPBFSDSDSDSDSDSDSDSD SD WWBFBFBTVBTVBTVBTVBTVBTVBTVBTVBTVBTVBTVBTVNGNGTVPTVTPEPTVSSSSSSSWWWWWWWWSSSSPROPOSED LEASE A R E A4.896 ACRES >>>>>>>>>>>>>>>>>>> 8S 8 S 8 S 8 S 8 S 8S 8S 8S 8S 8S 8SSS SSS8S8S8S8S8S8S8S8S8S8SS8S S8W8W8W8W8W8W8W8W8W8W8W8W8W8W8W8W8W8W8W8WHYDHYDHY D HYD8W12.50' PUBLIC STREET AND UTILITYEASEMENT PER DOC. NO. 259439232.50' PUBLIC STREET AND UTILITYEASEMENT PER DOC. NO. 2127508SSS8S8S8SSHYD 8W8W8W8W8W8W8W8W8W8W>>>>>>>>>SSSSSBPBPNG NG S15SD15SD15SD15SD15SDTS89°48'31"E1155.52'S14°31'55 " E 215.29' S3 8 ° 5 3 ' 4 2 " W 30 8 . 0 0 'S49°30'45"E387.64'S46°27'28"E60.06'L=30.49, R=270.00Δ=6°28'12"L=118.28 ,R= 3 3 0. 0 0Δ=2 0°32'1 2 " S0°05'19"W 475.68'S89°54'05"E1311.68'N89°49'37"E270.57'N0°02'48"E935.95'N75°20'59"E276.96'S89°52'33"E29.99'N0°56'55"E259.17'GENERALBUILDING AREAGENERALBUILDING AREAGENERALBUILDING AREAGENERALBUILDING AREAGENERALBUILDING AREAGENERALBUILDING AREAGENERALBUILDING AREAGENERALBUILDING AREAGENERALBUILDING AREAGENERALBUILDING AREAGENERALBUILDING AREAGENERALBUILDING AREAGENERALBUILDING AREAPARKING AREAPARKING AREAPARKING AREAPARKINGAREAPARKINGAREAPARKING AREAPARKING AREAOPEN SPACEOPENSPACEOPEN SPACEOPENSPACEOPEN SPACE8S8SWWSSSWSWSSSSSSSSSSSSSWSSS 8S 8S 8S W W W W SSSSSSSSWSSD SD SD SDSDSSSD SDSDSDSSHYD HYDWSWSWS15SD15SD18SD18SD18SD18 S D 18 S D 18 S D 18 S D 18 S D SD DD8.00' PUBLIC ACCESS EASEMENTPER DOC. NO. 236429910.00' PIPELINE EASEMENTPER DOC. NO. 247021120.00' BOZEMAN FIBER UTILITY EASEMENT PER DOC. NO. 25459798.00' PUBLIC ACCESS EASEMENTPER DOC. NO. 236429960.00' PUBLIC STREETAND UTILITY EASEMENT 80.00' PUBLIC STREETAND UTILITY EASEMENTTECHNOLOGY BLVDDRIVEW. COLLEGE STBOZEMAN FIBERCONSTRUCTION EASEMENTPER DOC. NO. 2545979PUBLIC ACCESS AND UTILITYEASEMENT FOR PEDESTRIANPATH, SEWER MAIN AND STORMWATER FACILITIESEXISTING STORM WATER POND TO BE REPLACED WITHMULTIPLE NEW STORAGE FACILITIES UPSTREAM ANDDOWN STREAM, INCLUDING UNDERGROUND STORAGE.PARKING LOTS AND CONVEYANCE SYSTEMS WILL BEDESIGNED WITH AN EMPHASIS ON LOW IMPACT DESIGNFEATURES AS EACH NEW SITE PLAN IS DEVELOPED.12' WIDE CONCRETEPEDESTRIAN PATH ANDSEWER ACCESSEXISTING ARLBUILDING SITEEXISTINGINDUSTRY BOZEMANSITEEXISTINGSTORM WA T E R P O N D RESEARCH DRTECHNOLOGY BLVD8016040800SCALE IN FEETWETLANDBOUNDARY (TYP.)30FT WETLANDSETBACK (TYP.)50FT WETLANDSETBACK (TYP.)PROPOSED STREET LIGHTS (TYP.)EXISTING HOPLITE FACILITYW. GARFIELD STEXISTINGAURORA SITEEXISTING YELLOWSTONEFIBER BUILDINGPROPERTY BOUNDARY (TYP.)TRACT C-1AAMENDED PLAT OF WEST COLLEGEMINOR SUBDIVISION #19541.97 ACRESOWNER:MONTANA STATE UNIVERSITY CAMPUS C/OMSU ALUMNI FOUNDATIONPO BOX 172755BOZEMAN, MT 59717CONCEPTUAL FUTUREPARKING AREA (TYP.)CONCEPTUAL FUTUREBUILDING AREA (TYP.)W3050W3050KEY NOTESDELINEATED WETLAND BOUNDARY30 FOOT WETLAND SETBACK50 FOOT WETLAND SETBACKFUTURE STORM WATER STORAGE FACILITYW3050SDSDSDSDSDSDWSW8SSSWATER MAIN EXTENSIONWATER SERVICESEWER MAIN EXTENSIONSEWER SERVICEUTILITY LEGENDissue dateproject #phasesheet project ownerrevisiondate6/6/2023 4:12 PM C2.1N:\5755\005 - Innovation Campus CDs\04 Design\PDZ\PDZ Exhibit.dwg PROPOSED CONCEPTUAL PLAN 22030MSU INNOVATION CAMPUS PDZ MSU INNOVATION CAMPUS 8S8WEXISTING WATER MAINEXISTING SEWER MAINCONCEPTUALEXISTINGEXISTING UTILITYEASEMENT (SEWER)INVENTIONNOTE: ANY FUTURE SEWER, WATER OR STORMDRAIN MAINS EXTENDED INTO OPEN SPACEAREAS WILL REQUIRE ALL-WEATHER VEHICLEACCESS AND NEW EASEMENTS. NOSTRUCTURES OR TREES WILL BE ALLOWED INTHE EASEMENT. FINAL EASEMENTS WILL BEDEVELOPED ONCE THE DESIGN IS FINALIZED.PROPOSEDMULTI-USE PATHMIN 10FT WIDE09/07/2023PDZ PRELIMINARYPLAN SUBMISSION