Loading...
HomeMy WebLinkAbout001.1_Project Narrative 1091 Stoneridge Drive • Bozeman, Montana • Phone (406) 587-1115 • Fax (406) 587-9768 www.chengineers.com • E-Mail: info@chengineers.com September 19, 2023 City of Bozeman Department of Community Development 20 East Olive Street Bozeman, MT 59715 RE: Project Narrative – Site Plan for Nahorniak Commons 8-plex, Tract 6 & 10’ of Tract 7, Block 4 Smith Subdivision (190527) The proposed Nahorniak Commons 8-plex development is located on Tract 6 & 10’ of Tract 7, Block 4 of Smith Subdivision in the City of Bozeman. The project includes developing a single 4- plex structure in Phase 1 and a single 8-plex structure in Phase 2 within said lot, which currently has a 1,644 square foot residence, a shed and outbuilding. The 1.04-acre parcel is zoned R-4. Please see the site plan (Sheet C1.0) for information on the location of the proposed residential buildings, parking, and utilities. Access is south off Durston Road, which has a block frontage of ‘Landscaped’. UDC R-4 zoning allows for four living units per grouping with a maximum width of 120’. This project proposes two four-plex structures with 116’ group width. Maximum building height varies with roof slope. Proposed is a 6/12 pitch and total building height of 36’ (42’ allowed). Table 1 below provides the proposed site data. Item Area Lot Area 45,291.5 sq. ft. Building footprint 1,272 sq. ft./structure Ground floor area 1,272 sq. ft. Second floor area 1,239 sq. ft. Third floor area 830 sq. ft. Lot coverage percentage 22% F.A.R. 59% Table 1 Site data The intent of the design is to provide attractive, medium density residential buildings within the recently annexed lot. The floor plans for each unit are similar to each other. Variations to the plans include ground floor home office/bonus/living space. Each living unit has a two-car garage, covered entry located under second floor cantilevered window bays, second floor living space and third floor sleeping spaces. Decks are provided on both east and west elevations. Proposed materials include prefinished corrugated metal panels, painted metal garage door, natural clear finished wood, painted metal railings, CONCEPT PLAN NARRATIVE #190527 –CONCEPT SITE PLAN – NAHORNIAK COMMONS 2 aluminum clad windows and asphalt shingles. Design elements include the following: • screen wall deck structure providing privacy and building mass relief, • cantilevered window bay, • varied deck and deck enclosure volumes, and • roof dormers. The development will be serviced by existing City of Bozeman road, water, and sanitary sewer systems (main extensions required). A looped water main system has been investigated and determined not to be feasible. The adjacent landowners of Lots 3C & 1A (Valley Meadows Subd.) to the south of the property have been unwilling agree upon an easement. The easement would have allowed an additional drive approach out to Meriwether Avenue as well as a looped water connection. The project is to be completed in 2 phases as shown on sheets C1.1-C3.1 All water/sewer mains and services will be completed with Phase 1. Construction is intended to begin soon after permitting, with the final phase being completed in the spring of 2024. No affordable housing is proposed. Sincerely, Mark J. Nahorniak Owner