Loading...
HomeMy WebLinkAbout17 A5-0 - ROOF PLAN1. COORDINATE LOCATION AND ROUTING OF ROOF DRAINS w/ ARCHITECT & G.C. 2. COORDINATE MECHANICAL EQUIPMENT LOCATIONS w/ ARCHITECT & G.C. 3. COORDINATE LOCATION OF VTR'S WITH G.C. 4. PROVIDE ICE & WATER SHIELD MEMBRANE UNDER METAL ROOFING (ENTIRE ROOF). 5. USE 24 GA PREFINISHED ALUMINUM FLASHING (OR APPROVED ALTERNATE). 6. PROTECTION IS REQUIRED TO AVOID DIRECT CONTACT WITH DISSIMILAR MATERIALS THAT COULD CAUSE GALVANIC CORROSION (ELECTROLYSIS). 7. INSTALL ALL FLASHING WITH PROVISIONS FOR DIFFERENTIAL AND THERMAL MOVEMENT BETWEEN ADJACENT MATERIALS, AS REQUIRED BY BUILDING CONDITIONS. 8. CONTERFLASHINGS SHALL LAP BASE FLASHINGS AT LEAST 4 INCHES MINIMUM AND LAP ALL VERTICAL JOINTS. 9. REFER TO DETAILS AND SPECIFICATIONS IN THE ARCHITECTURAL SHEET METAL MANUAL, SMACNA. 10. PROVIDE ROOF/ATTIC VENTING PER ALL APPLICABLE LOCAL BUILDING CODES. MINIMUM NET FREE VENTILATION AREA SHALL BE 1/150 OF THE AREA VENTED SPACE. 11. ALL DIMENSIONS OF SLOPED ROOFS ARE HORIZONTAL DIMENSIONS. ROOF OVERHANG DIMENSIONS ARE FROM EXTERIOR FAC OF STUD WALL UNLESS OTHERWISE NOTED. 12. SEE MECHANICAL FOR ROOF PLUMBING PENETRATIONS AND EQUIPMENT CURB. 13. ALL PENETRATIONS TO BE FLASHED PER ROOF MFGR'S APPROVED DETAILS. 14. PROVIDE CRICKETS WHERE EVER NECCESSARY FOR PROPER DRAINAGE. 15. TRUSS MFGR TO COORDINATE ALL MECH PENETRATIONS INTO TRUSS DESIGN. 16. FLASH MECH EQUIP. CURBS PER ROOF MFGR'S APPROVED DETAILS. SEE MECH FOR CURB DETAIL CRICKETING TYPICAL AT ALL ROOF CURBS. 17. SEE ELECTRICAL FOR LOCATIONS OF HEAT TAPE IN GUTTERS AND DOWNSPOUTS. HEAT TAPE TO EXTEND A MINIMUM OF 4' 0" INTO SUBGRADE DRAIN PIPE. NOTES: BLACK STANDING SEAM METAL ROOFING FLAT MEMBRANE ROOF DOWN SPOUT / GUTTER SYSTEM CORRUGATED METAL ROOFING LEGEND A3.0 1 A3.0 2 A3.0 3 A3.0 4 1 A6.0 OPENING 6' - 0" OPENING 6' - 0" COORDINATE INSULATION HEIGHT AT PARAPET WALL OPENINGS ROOF DRAIN ROOF DRAIN ROOF DRAIN ROOF DRAIN ROOF DRAIN ROOF DRAIN ROOF DRAIN ROOF DRAIN 1/4:121/4:12 1/4:121/4:12SLOPE ELEVATOR BULKHEAD 1/4:121/4:121/4:121/4:12 1/4:121/4:121/4:121/4:12 1/4:121/4:121/4:121/4:121/4:12 1/4:121/4:121/4:121/4:12 1/4:121 1 2 2 3 3 4 4 5 5 6 6 8 8 9 9 10 10 7 7 A A C C B B D D E E F F G G H H ROOF HATCH DESIGN ROOFTOP MECHANICAL TO BE INSTALLED WITHIN TALL CORNER PARAPETS DESIGN ROOFTOP MECHANICAL TO BE INSTALLED WITHIN TALL CORNER PARAPETS WALKPAD ROOF PROTECTION ROOF MEMBRANE COVER BOARD TAPERED RIGID INSULATION PER INSULATION LEGEND ROOF SHEATHING PER STRUCTURAL SLOPE ROOF JOIST PER STRUCTURALNOTE: T.I. TO EVALUATE AND MITIGATE NOISE FROM ROOF TOP EQUIPMENT AND COORDINATE WITH FINISHED CEILINGS. CAULK TERMINATION BAR TAPERED INSULATION COVER BOARD SHEATHING PER PLAN ROOFING MEMBRANE LADDER UP - (LOCATIONS PER PLAN) 3' - 7" FRAME OPENING LENGTH 3' - 0"3' - 7"FRAME OPENING LENGTH3' - 0"ROOF ACCESS HATCH, SEE MANUF. SPECS. FRMG. PER STRUCT. 1'-6" TAPERED INSULATION DRAIN ASSEMBLY WITH CLAMPING RING SEALANT NON-REINFORCED MEMBRANE FLASHING TAPERED INSULATION ATTACHED @ MINIMUM OF 2 FASTENERS PER BOARD COVER BOARD EXTEND NON-REINFORCED MIN. OF 1/2" BEYOND INSIDE CLAMPING RING FIELD TAPER SUMP TO PROVIDE A SMOOTH TRANSITION AS REQ. ROOF MEMBRANE SEAL ROOFING MEMBRANE FASTENER(S) & STRESS PLATE(S) 12" O.C. AROUND SUMP AREA RIGID INSULATION PER INSULATION LEGEND WOOD JOIST PER STRUCTURAL REFER TO PLUMBING DRAWINGS FOR OVERFLOW DRAIN AND DRAIN TYPE JOB No.SHEET NUMBERPROJECT / OWNERARCHITECTLOCATI ARCHITECTS1007 E. MAIN SUITE 202 BOZEMAN MONTANA406-587-1139COPYRIGHT LOCATI ARCHITECTS LLC2022 ALL RIGHTS RESERVEDPROJECT MGR2022_19BRAXTON DEVEL.11TH & OAKBOZEMANMONTANAA5.0ROOF PLANTJH# ISSUE DATE SCALE: 1/8" = 1'-0"A5.0 ROOF1 SCALE: 3" = 1'-0"A5.0 DETAIL (TYP. MEMBRANE ROOF)2 SCALE: 1 1/2" = 1'-0"A5.0 ROOF ACCESS HATCH w/ LADDER3 SCALE: 1 1/2" = 1'-0"A5.0 ROOF DRAIN4