HomeMy WebLinkAbout20189 Staff Report FINAL Staff Report
Westland Lofts Ph. 2 Site Plan
Application No. 20189
October 14, 2021
Page 1 of 13
Application No. 20189 Type Site Plan
Project Name Westland Lofts Phase 2
Summary Phase 2 of the Westland Lofts Master Site Plan & CUP, #18557. Phase 2 consists of 16
residential condominium units in Buildings C and D on the eastern side of the lot including
additional parking, landscaping and open space. The Approved Master Site Plan is for a
phased development containing one mixed-use building with storefront commercial space
along Gallatin Green Boulevard and a conditional use permit for ground level residential and
three apartment buildings. 31 total dwelling units are proposed over two phases with parking,
open space and associated site improvements.
Zoning B-2 Growth Policy Residential Mixed Use Parcel Size 1.4483 Acres
63,091 SF
Overlay District(s) None
Street Address 2470 & 2474 Gallatin Green Blvd.
Legal Description Baxter Meadows Sub Phase 6, S34, T01 S, R05 E, Block 14, Lot 5, Acres 1.448, Plat J-466 Plus
Open Space & PPW, City of Bozeman, Gallatin County, Montana.
Owner Dallas Financial, LLC, PO Box 12009, Bozeman, MT 59719
Applicant Mcgough Construction, PO Box 12009, Bozeman, MT 59719
Representative C&H Engineering, 1091 Stoneridge Dr., Bozeman, MT 59718
Staff Planner Danielle Garber Engineer Karl Johnson
Noticing Public Comment Period Site Posted Adjacent Owners
Mailed
Newspaper Legal Ad
8/9/21 – 8/24/21
8/9/21 8/9/21 N/A
Advisory Boards Board Date Recommendation
Development Review
Committee
8/9/21 The application is adequate, conforms to
standards, and is sufficient for approval with
conditions and code provisions
Design Review Board NA NA
Recommendation The application is adequate, conforms to standards, and is sufficient for approval with conditions and
code provisions as noted below.
Decision Authority Director of Community Development Date 10/14/21
Full application and file of record: Community Development Department, 20 E. Olive St., Bozeman, MT 59715
Staff Report
Westland Lofts Ph. 2 Site Plan
Application No. 20189
October 14, 2021
Page 2 of 13
FINDINGS OF FACT AND APPEAL PROVISIONS CERTIFICATE
A) PURSUANT to Chapter 38, Article 2, Bozeman Municipal Code (BMC), and other applicable sections of Ch.38, BMC, public
notice was given, opportunity to submit comment was provided to affected parties, and a review of the Site Plan described in
this report was conducted. The applicant proposed to the City a Site Plan (SP) to permit 16 residential condominiums
constructed as 2 buildings with associated parking, drive access, open space, landscaping, and site improvements. The
purposes of the Site Plan review were to consider all relevant evidence relating to public health, safety, welfare, and the other
purposes of Ch. 38, BMC; to evaluate the proposal against the criteria of Sec. 38.230.100 BMC, and the standards of Ch. 38,
BMC; and to determine whether the application should be approved, conditionally approved, or denied.
B) It appeared to the Director that all parties and the public wishing to examine the proposed Site Plan and offer comment were
provided the opportunity to do so. After receiving the recommendation of the relevant advisory bodies established by Ch. 38,
Art. 210, BMC, and considering all matters of record presented with the application and during the public comment period
defined by Ch. 38, BMC, the Director has found that the proposed Site Plan would comply with the requirements of the BMC if
certain conditions were imposed. Therefore, being fully advised of all matters having come before them regarding this
application, the Director makes the following decision.
C) The Site Plan has been found to meet the criteria of Ch. 38, BMC, and is therefore approved, subject to the conditions listed
in this report and the correction of any elements not in conformance with the standards of the Title. The evidence contained in
the submittal materials, advisory body review, public testimony, and this report, justifies the conditions imposed on this
development to ensure that the Site Plan complies with all applicable regulations, and all applicable criteria of Ch. 38, BMC.
On this ______ day of ________________, 2021, Martin Matsen, Director of Community Development, approved with
conditions this Site Plan for and on behalf of the City of Bozeman as authorized by Sec. 38.200.010, BMC.
D) This Director of Community Development’s project decision may be appealed by filing a documented appeal with and paying
an appeal fee to the Clerk of the Commission for the City of Bozeman within 10 working days after the date of the final decision
as evidenced by the Director’s signature, following the procedures of Sec. 38.250.030, BMC.
DIRECTOR OF COMMUNITY DEVELOPMENT
CONDITIONS OF APPROVAL
1. The applicant is advised that unmet code provisions, or code provisions that are not specifically listed as conditions
of approval, does not, in any way, create a waiver or other relaxation of the lawful requirements of the Bozeman
Municipal Code or state law.
Staff Report
Westland Lofts Ph. 2 Site Plan
Application No. 20189
October 14, 2021
Page 3 of 13
Figure 1: Current Zoning Map
Staff Report
Westland Lofts Ph. 2 Site Plan
Application No. 20189
October 14, 2021
Page 4 of 13
Figure 2: Proposed Site Plan, Phase 2 includes Buildings C & D along the east property line
Staff Report
Westland Lofts Ph. 2 Site Plan
Application No. 20189
October 14, 2021
Page 5 of 13
Figure 3: Landscape Plan
Staff Report
Westland Lofts Ph. 2 Site Plan
Application No. 20189
October 14, 2021
Page 6 of 13
Figure 4: Civil Plan with phasing
Staff Report
Westland Lofts Ph. 2 Site Plan
Application No. 20189
October 14, 2021
Page 7 of 13
Figure 5: Building C – West Elevations (parking lot facing)
Figure 6: Building C – East Elevations (park/open space facing)
Staff Report
Westland Lofts Ph. 2 Site Plan
Application No. 20189
October 14, 2021
Page 8 of 13
ANALYSIS AND FINDINGS
Analysis and resulting recommendations based on the entirety of the application materials, municipal codes, standards,
plans, public comment, and all other materials available during the review period. Collectively this information is the record
of the review. The analysis in this report is a summary of the completed review.
Plan Review, Section 38.230.100, BMC
In considering applications for plan approval under this title, the Director of Community Development shall consider the
following:
1. Conformance with Article 1 - Consistency with the City’s adopted Growth
Policy 38.100.040.D
Meets Code?
Growth Policy
Land Use
Residential Mixed Use Yes
Zoning B-2, Community Business District Yes
Comments: The project conforms to the requirements of the B-2 zoning district with an existing master site plan and
conditional use permit for ground level residential and apartment buildings approved by the City Commission on August 5,
2019 with a 5-0 vote. The 2020 Community Plan designation of residential Mixed was assigned with the approval of resolution
5133 adopted by the City Commission November 17, 2020, the previous designation was Community Commercial Mixed
Use. The Residential Mixed Use designation created a non-conformity with the B-2 zoning district. For the purposes of this
application, the approved conditional use permit remains in effect for this parcel and proposed use, which conforms to the
zoning designation of B-2. The proposed project also conforms to the new community plan designation by providing
apartment style condominiums in a neighborhood substantially dominated by housing, yet integrated with small-scale
commercial uses meeting the intent, type of use, and intensity of development described in the designation.
2. Conformance with Article 1 - All other applicable laws, ordinances, and
regulations (38.100.080)
Condominium ownership No
Comments: Additional steps will be required including but not limited to review of building permits and
infrastructure plans. The Building Division of the Department of Community Development will review the
requirements of the International Building Code for compliance at the time of building permit application.
3. Conformance with Article 2, including the cessation of any current violations
(38.200.160)
Meets Code?
Current Violations None Yes
Comments: There are no current violations on the property.
4. Conformance with Article 2 - Submittal material (38.220) requirements and
plan review for applicable permit types (38.230)
Meets Code?
Site Plan Yes
Submittal requirements 38.220.100 Yes
Phasing of development
38.230.020.B
No. of phases: 1 (2 overall) Yes
Comments: The approved master site plan details improvements in two phases. 31 total dwelling units
are proposed over two phases with parking, open space and associated site improvements.
Phase 1 included buildings A and B (see site plan above), as well as associated parking, drive access,
utility extensions, and open space. Phase 1 is currently under construction and includes 15
condominiums and 8 commercial spaces. Phase 2, proposed with this application, includes building C
and D and adjacent walkways, parking, and open space.
Staff Report
Westland Lofts Ph. 2 Site Plan
Application No. 20189
October 14, 2021
Page 9 of 13
Any additional use permit (Conditional Use Permit) 38.230.120 or (Special use
Permit) 38.230.120
Yes
Comments: An existing master site plan and conditional use permit for ground level residential and
apartment buildings was approved by the City Commission on August 5, 2019 with a 5-0 vote. This
application is consistent with that approval.
5. Conformance with Article 3 - Zoning Provisions (38.300) Meets Code?
Permitted uses 38.310 Apartments Yes
Form and intensity standards 38.320
Zoning: REMU Setbacks
(feet)
Structures Parking / Loading Yes
Front NA NA
Rear 10 10
Side 5 8
Alley NA NA
Comments: Apartments are primary uses within the B-2 zoning district, ground level apartments are
permitted with the CUP approval described above. No front setbacks are present for this Phase 2 site
plan. The rear setback of 10-feet is met along the east property line with allowable encroachments. The
side setback of 5-feet is met along the north property line.
Lot
coverage
32.3% overall Allowed 100% Yes
Building
height
33’ 4 5/8”
Buildings C & D
Allowed 50-feet
<3:12 Roof pitch
Yes
Comments: Building height is met with the proposed 3-story buildings. Phase 2 shares a lot with phase 1, and
lot coverage was previously reviewed with the master site plan.
Applicable zone specific or overlay standards 38.330-40 NA
Comments: NA
General land use standards and requirements 38.350 NA
Comments: NA
Applicable supplemental use criteria 38.360 NA
Supplemental
uses/type
NA NA
Comments: NA
Wireless facilities 38.370 NA
Affordable Housing 38.380.010 NA
Affordable housing plan NA
Comments: No wireless facilities are proposed. No affordable housing requirements are triggered with
the proposed uses.
6a. Conformance with Article 4 - Community Design Provisions: Transportation
Facilities and Access (38.400)
Meets Code?
Streets 38.400.010 Yes
Street and road dedication 38.400.020 NA
Access easements Yes
Level of Service
38.400.060
Yes Transportation grid adequate to serve site Yes
Comments: Adjacent streets exist to serve the site, no additional dedication is needed. No new traffic
impact study was required by the Engineering Division, a traffic impact study (TIS) was conducted in
Staff Report
Westland Lofts Ph. 2 Site Plan
Application No. 20189
October 14, 2021
Page 10 of 13
2019 and submitted with this application to satisfy a master site plan condition of approval. A recorded
SID waiver was provided with the master site plan.
Sidewalks 38.400.080 Yes
Comments: Sidewalks are to be provided adjacent to the phase 2 buildings, connecting to phase 1
pathways and to the subdivision open space to the east.
Drive access 38.400.090 Access to site: 2 Yes
Fire lanes, curbs, signage and striping Yes
Comments: Two drive accesses are proposed along Gallatin Green Blvd.; engineering evaluated both
drive accesses for spacing and design standards with the master site plan review. A departure request
from spacing with the adjacent intersection was included with the master site plan and was approved by
engineering.
Street vision triangle 38.400.100 Yes
Transportation pathways 38.400.110 Yes
Pedestrian access easements for shared use pathways and similar transportation
facilities
NA
Public transportation 38.400.120 NA
Comments: The project connects to the larger city sidewalk network, and adjacent trail system. Internal
pathways meet code requirements and are safe. Stamped concrete will be installed to provide safer
pedestrian walkways through the parking lot. There are no known obstructions to the site vision triangles.
No access easements are necessary
6b. Conformance with Article 4 – Community Design Provisions: Community
Design and Elements (38.410)
Meets Code?
Neighborhood centers 38.410.020 NA
Comments: This project does not trigger neighborhood center requirements.
Lot and block standards 38.410.030-040 NA
Midblock crossing: rights of way for pedestrians alternative block delineation NA
Comments: This project does not trigger lot and block standards.
If the development is adjacent to an existing or approved public park or public open
space area, have provisions been made in the plan to avoid interfering with public
access to and use of that area
Yes
Provisions for utilities including efficient public services and utilities 38.410.050-060 Yes
Easements (City and public utility rights-of-way etc.) Yes
Water, sewer, and stormwater Yes
Other utilities (electric, natural gas, communications) Yes
CIL of water Yes
Comments: A waterline utility easement has been provided and will be recorded prior to master site plan
approval. CIL of water rights was provided with the plat, no additional fee is required. Water, sewer, and
stormwater design plans were reviewed by the Engineering Division
Municipal infrastructure requirements 38.410.070 Yes
Comments: Municipal water, sanitary sewer, and storm sewer systems proposed with this project have
been reviewed by engineering. A condition of approval with the master site plan required phase 2 to wait
for the Norton East Wastewater Interceptor to be constructed which was completed this summer to
provide adequate capacity for the subject property.
Grading & drainage 38.410.080 Yes
Location, design and capacity of stormwater facilities Yes
Stormwater maintenance plan Yes
Landscaping: native species, curvilinear, 75% live vegetation 38.410.080.H NA
Staff Report
Westland Lofts Ph. 2 Site Plan
Application No. 20189
October 14, 2021
Page 11 of 13
Comments: Stormwater detention is exclusively underground.
Watercourse setback 38.410.100 NA
Watercourse setback planting plan 38.410.100.2.f NA
6c. Conformance with Article 4 – Community Design Provisions: Park and
Recreation Requirements (38.420)
Meets Code?
Parkland requirements 38.420.020.A NA NA
Cash donation in lieu (CIL) 38.420.030 NA
Improvements in-lieu NA
Comments: NA
Park Frontage 38.420.060 NA
Park development 38.420.080 NA
Recreation pathways 38.420.110 NA
Park/Recreational area design NA
Comments: CIL Parkland was paid with the master site plan application no. 18557 in the amount of
$22,999.68. No park development or recreation pathways are proposed. Subdivision park and open
space with a trail exists to the east. The applicant is providing pedestrian connections to that open space
trail.
7a. Conformance with Article 5 – Project Design: Block Frontage Standards
(38.510)
Meets Code?
Block frontage classification Trail/Park Yes
Departure criteria None requested NA
Comments: This project is not subject to street block frontage standards. Phase 1 satisfied the required
block frontage design standards along Gallatin Green. The two proposed buildings have Trail/Park frontages
and comply with the required mixed block frontage standards including 10-foot setbacks.
7b. Conformance with Article 5 – Project Design: Site Planning and Design
Elements (38.520)
Meets Code?
Design and arrangement of the elements of the plan (e.g., buildings, circulation, open
space and landscaping, etc.) so that activities are integrated with the organizational
scheme of the community, neighborhood, and other approved development and produce
an efficient, functionally organized and cohesive development
Yes
Relationship to adjacent properties 38.520.030 NA
Non-motorized circulation and design systems to enhance convenience and safety
across parking lots and streets, including, but not limited to paving patterns, pathway
design, landscaping and lighting 38.420.040
Yes
Comments: The property is surrounded on three sides by subdivision open space and parkland. Internal
pedestrian circulation connects to nearby trails. Decorative cement crosswalks are used where walkways
cross drive aisles. A departure to use planters in lieu of landscaping beds between pathways and
structures was supported by staff and approved with the master site plan.
Design of vehicular circulation systems to assure that vehicles can move safely and
easily both within the site and between properties and activities within the general
community 38.420.050
Yes
Internal roadway design 38.520.050.D NA
Comments: NA
On-site open space 38.520.060
Total required 2,100 square feet Yes
Staff Report
Westland Lofts Ph. 2 Site Plan
Application No. 20189
October 14, 2021
Page 12 of 13
7d. Conformance with Article 5 – Parking (38.540) Meets Code?
Parking requirements 38.540.050 Yes Yes
Parking requirements residential 38.540.050.A.1 30 spaces phase 2
Reductions residential 38.540.050.A.1.b NA
Parking requirements nonresidential
38.540.050.A.2
NA
Reductions nonresidential 38.540.050.A.2.c NA
Provided off-street 30 spaces phase 2
Provided on-street NA
Bicycle parking 38.540.050.A.4 16 Overall
Comments: This project proposes 4 one-bedroom units, and 12 two-bedroom units with a total of 30
parking spaces required for phase 2. Parking is proposed within garages, in the surface lot both covered
and uncovered. Each stall provided off-street meets the stall, aisle, and driveway design requirements of
Section 38.540.020. Bike parking will be provided within the previously approved custom bike rack
located in phase 1.
Loading and uploading area requirements 38.540.080 NA
First berth – minimum 70 feet length, 12 feet in width, 14 feet in height NA
Additional berth – minimum 45 feet length NA
Comments: NA
7e. Conformance with Article 5 – Landscaping (38.550) Meets Code?
Mandatory landscaping requirements 38.550.050 Yes
Drought tolerant species 75% required Yes
Parking lot landscaping Yes
Additional screening NA
Street frontage NA
Street median island NA
Acceptable landscape materials Yes
Protection of landscape areas NA
Irrigation: plan, water source, system type Yes
Total provided 2,300 square feet Yes
Comments: The 16 one and two bedroom units trigger 2,100 square feet of required open space. A
shared open space area to the east of building D provides 2,300 square feet of open space.
Location and design of service areas and mechanical equipment 38.520.070 Yes
Comments: Mechanical equipment is proposed on the roof of each building behind a parapet and screen
wall. Utility meters are to be screened by landscaping. Solid waste will be collected via a shared
enclosure approved with the master site plan and will be constructed with phase 1.
7c. Conformance with Article 5 – Project Design: Building Design (38.530) Meets Code?
Compatibility with, and sensitivity to, the immediate environment of the site and the
adjacent neighborhoods and other approved development 38.530.030
Yes
Building massing and articulation 38.530.040 Yes
Building details, materials, and blank wall treatments 38.530.050-070 NA
Comments: Articulation is achieved for the exterior facing elevations with roofline modulation, use of
windows, and use of weather protection features. Modulation for facades interior to the site facing the
parking lot rely on exterior material changes, window patterns, and entries. Exterior materials include
cedar board and batten, painted horizontal fiber cement lap siding, and steel awnings. Blank walls are
mitigated with windows and climbing vines on trellises.
Staff Report
Westland Lofts Ph. 2 Site Plan
Application No. 20189
October 14, 2021
Page 13 of 13
Residential adjacency NA
Comments: The provided landscaping plan conforms to standards.
Landscaping of public lands 38.550.070 NA
Comments: Street trees will be provided along the street frontage with phase 1.
7f. Conformance with Article 5 – Signs (38.560) Meets Code?
Allowed SF/building 38.560.060 NA NA
Proposed SF/building NA NA
Comments: NA
7g. Conformance with Article 5 – Lighting (38.560) Meets Code?
Site lighting (supports, cutoff, footcandles, temperature) 38.570.040 Yes
Building-mounted lighting (supports, cutoff, footcandles, temperature) 38.570.040.B Yes
Comments: The lighting meets standards. Both site and building mounted lighting are proposed including
underneath the covered parking structure
8. Conformance with Article 6 – Natural Resource Protection Meets Code?
Floodplain regulations 38.600 NA
Wetland regulations 38.610 NA
Comments: NA
9. Relevant Comment from Affected Parties (38.220) Meets Code?
Public Comment Yes
Comments: A public notice period was conducted meeting the requirements of this section and detailed on
page 1 of this report. No public comment was received.
10. Division of Land Pertaining to Subdivisions (38.240-Part 4) Meets Code?
Subdivision exemptions NA
Required easements Yes
Comments: Utility easements were provided with the master site plan approval. Privacy fencing is shown
to encroach into the private utility easement along the east property line adjacent to building C. A waiver
for that encroachment was provided by Northwestern Energy and three telecom companies that would
have access to that easement. Their responses are in the file.