Loading...
HomeMy WebLinkAbout014 - C3.2 DetailsNOTES1.8-30" (200-750 mm) GRATES/SOLID COVERS SHALL BE DUCTILE IRON PER ASTM A536GRADE 70-50-052.12-30" (300-750 mm) FRAMES SHALL BE DUCTILE IRON PER ASTM A536 GRADE 70-50-053.DRAIN BASIN TO BE CUSTOM MANUFACTURED ACCORDING TO PLAN DETAILS4.DRAINAGE CONNECTION STUB JOINT TIGHTNESS SHALL CONFORM TO ASTM D3212FOR CORRUGATED HDPE (ADS & HANCOR DUAL WALL) & SDR 35 PVC5.FOR COMPLETE DESIGN AND PRODUCT INFORMATION: WWW.NYLOPLAST-US.COM6.TO ORDER CALL: 800-821-6710APART #GRATE/SOLID COVER OPTIONS8"(200 mm)2808AGPEDESTRIAN LIGHTDUTYSTANDARD LIGHTDUTYSOLID LIGHT DUTY10"(250 mm)2810AGPEDESTRIAN LIGHTDUTYSTANDARD LIGHTDUTYSOLID LIGHT DUTY12"(300 mm)2812AGPEDESTRIANAASHTO H-10STANDARD AASHTOH-20SOLIDAASHTO H-2015"(375 mm)2815AGPEDESTRIANAASHTO H-10STANDARD AASHTOH-20SOLIDAASHTO H-2018"(450 mm)2818AGPEDESTRIANAASHTO H-10STANDARD AASHTOH-20SOLIDAASHTO H-2024"(600 mm)2824AGPEDESTRIANAASHTO H-10STANDARD AASHTOH-20SOLIDAASHTO H-2030"(750 mm)2830AGPEDESTRIANAASHTO H-20STANDARD AASHTOH-20SOLIDAASHTO H-20INTEGRATED DUCTILE IRONFRAME & GRATE/SOLID TOMATCH BASIN O.D.VARIOUS TYPES OF INLET ANDOUTLET ADAPTERS AVAILABLE:4-30" (100-750 mm) FORCORRUGATED HDPEWATERTIGHT JOINT(CORRUGATED HDPE SHOWN)BACKFILL MATERIAL BELOW AND TO SIDESOF STRUCTURE SHALL BE ASTM D2321CLASS I OR II CRUSHED STONE OR GRAVELAND BE PLACED UNIFORMLY IN 12" (305 mm)LIFTS AND COMPACTED TO MIN OF 90%TRAFFIC LOADS: CONCRETE DIMENSIONSARE FOR GUIDELINE PURPOSES ONLY.ACTUAL CONCRETE SLAB MUST BEDESIGNED GIVING CONSIDERATION FORLOCAL SOIL CONDITIONS, TRAFFIC LOADING& OTHER APPLICABLE DESIGN FACTORSADAPTER ANGLES VARIABLE 0°- 360°ACCORDING TO PLANS18" (457 mm)MIN WIDTHAAASHTO H-20 CONCRETE SLAB8" (203 mm) MIN THICKNESSVARIABLE SUMP DEPTHACCORDING TO PLANS[6" (152 mm) MIN ON 8-24" (200-600 mm),10" (254 mm) MIN ON 30" (750 mm)]4" (102 mm) MIN ON 8-24" (200-600 mm)6" (152 mm) MIN ON 30" (750 mm)12" (610 mm) MIN(FOR AASHTO H-20)INVERT ACCORDING TOPLANS/TAKE OFFNOTES1.INSPECT EVERY 6 MONTHS DURING THE FIRST YEAR OF OPERATION. ADJUST THEINSPECTION INTERVAL BASED ON PREVIOUS OBSERVATIONS OF SEDIMENTACCUMULATION AND HIGH WATER ELEVATIONS.2.CONDUCT JETTING AND VACTORING ANNUALLY OR WHEN INSPECTION SHOWS THATMAINTENANCE IS NECESSARY.05/22/23INSPECTION & MAINTENANCESTEP 1)INSPECT ISOLATOR ROW PLUS FOR SEDIMENTA.INSPECTION PORTS (IF PRESENT)A.1.REMOVE/OPEN LID ON NYLOPLAST INLINE DRAINA.2.REMOVE AND CLEAN FLEXSTORM FILTER IF INSTALLEDA.3.USING A FLASHLIGHT AND STADIA ROD, MEASURE DEPTH OF SEDIMENT AND RECORD ON MAINTENANCE LOGA.4.LOWER A CAMERA INTO ISOLATOR ROW PLUS FOR VISUAL INSPECTION OF SEDIMENT LEVELS (OPTIONAL)A.5.IF SEDIMENT IS AT, OR ABOVE, 3" (80 mm) PROCEED TO STEP 2. IF NOT, PROCEED TO STEP 3.B.ALL ISOLATOR PLUS ROWSB.1.REMOVE COVER FROM STRUCTURE AT UPSTREAM END OF ISOLATOR ROW PLUSB.2.USING A FLASHLIGHT, INSPECT DOWN THE ISOLATOR ROW PLUS THROUGH OUTLET PIPEi)MIRRORS ON POLES OR CAMERAS MAY BE USED TO AVOID A CONFINED SPACE ENTRYii)FOLLOW OSHA REGULATIONS FOR CONFINED SPACE ENTRY IF ENTERING MANHOLEB.3.IF SEDIMENT IS AT, OR ABOVE, 3" (80 mm) PROCEED TO STEP 2. IF NOT, PROCEED TO STEP 3.STEP 2)CLEAN OUT ISOLATOR ROW PLUS USING THE JETVAC PROCESSA.A FIXED CULVERT CLEANING NOZZLE WITH REAR FACING SPREAD OF 45" (1.1 m) OR MORE IS PREFERREDB.APPLY MULTIPLE PASSES OF JETVAC UNTIL BACKFLUSH WATER IS CLEANC.VACUUM STRUCTURE SUMP AS REQUIREDSTEP 3)REPLACE ALL COVERS, GRATES, FILTERS, AND LIDS; RECORD OBSERVATIONS AND ACTIONS.STEP 4)INSPECT AND CLEAN BASINS AND MANHOLES UPSTREAM OF THE STORMTECH SYSTEM.NOTES1.INSPECT EVERY 6 MONTHS DURING THE FIRST YEAR OF OPERATION. ADJUST THE INSPECTION INTERVAL BASED ON PREVIOUSOBSERVATIONS OF SEDIMENT ACCUMULATION AND HIGH WATER ELEVATIONS.2.CONDUCT JETTING AND VACTORING ANNUALLY OR WHEN INSPECTION SHOWS THAT MAINTENANCE IS NECESSARY.CATCH BASINORMANHOLEDC-780 ISOLATOR ROW PLUS DETAILNTSSTORMTECH HIGHLY RECOMMENDSFLEXSTORM INSERTS IN ANY UPSTREAMSTRUCTURES WITH OPEN GRATESOPTIONAL: COVER ENTIRE ISOLATOR ROW PLUS WITHADS GEOSYNTHETICS 601T NON-WOVEN GEOTEXTILE8' (2.4 m) MIN WIDEOPTIONAL INSPECTION PORTDC-780/SC-740 END CAPONE LAYER OF ADSPLUS125 WOVEN GEOTEXTILE BETWEENFOUNDATION STONE AND CHAMBERS5' (1.5 m) MIN WIDE CONTINUOUS FABRIC WITHOUT SEAMSSUMP DEPTH TBD BYSITE DESIGN ENGINEER(24" [600 mm] MIN RECOMMENDED)INSTALL FLAMP ON 24" (600 mm) ACCESS PIPEPART#: SC74024RAMP24" (600 mm) HDPE ACCESS PIPE REQUIREDUSE EZ END CAP PART #: SC740ECEZDC-780 CHAMBERUNDERDRAIN DETAILNTSAABBSECTION A-ASECTION B-BDUAL WALLPERFORATEDHDPEUNDERDRAINADS GEOSYNTHETICS 601TNON-WOVEN GEOTEXTILESTORMTECH END CAPADS GEOSYNTHETICS 601TNON-WOVEN GEOTEXTILESTORMTECHCHAMBEROUTLET MANIFOLDSTORMTECH END CAPSTORMTECHCHAMBERSNUMBER AND SIZE OF UNDERDRAINS PER SITE DESIGN ENGINEER4" (100 mm) TYP FOR SC-310 & SC-160LP SYSTEMS6" (150 mm) TYP FOR SC-740, DC-780, MC-3500, MC-4500 & MC-7200 SYSTEMSFOUNDATION STONEBENEATH CHAMBERSFOUNDATION STONEBENEATH CHAMBERSPART #STUBABCSC740EPE06T / SC740EPE06TPC6" (150 mm)10.9" (277 mm)18.5" (470 mm)---SC740EPE06B / SC740EPE06BPC---0.5" (13 mm)SC740EPE08T / SC740EPE08TPC8" (200 mm)12.2" (310 mm)16.5" (419 mm)---SC740EPE08B / SC740EPE08BPC---0.6" (15 mm)SC740EPE10T / SC740EPE10TPC10" (250 mm)13.4" (340 mm)14.5" (368 mm)---SC740EPE10B / SC740EPE10BPC---0.7" (18 mm)SC740EPE12T / SC740EPE12TPC12" (300 mm)14.7" (373 mm)12.5" (318 mm)---SC740EPE12B / SC740EPE12BPC---1.2" (30 mm)SC740EPE15T / SC740EPE15TPC15" (375 mm)18.4" (467 mm)9.0" (229 mm)---SC740EPE15B / SC740EPE15BPC---1.3" (33 mm)SC740EPE18T/ SC740EPE18TPC18" (450 mm)19.7" (500 mm)5.0" (127 mm)---SC740EPE18B / SC740EPE18BPC---1.6" (41 mm)SC740ECEZ*24" (600 mm)18.5" (470 mm)---0.1" (3 mm)ALL STUBS, EXCEPT FOR THE SC740ECEZ ARE PLACED AT BOTTOM OF END CAP SUCH THAT THE OUTSIDE DIAMETER OF THESTUB IS FLUSH WITH THE BOTTOM OF THE END CAP. FOR ADDITIONAL INFORMATION CONTACT STORMTECH AT1-888-892-2694.* FOR THE SC740ECEZ THE 24" (600 mm) STUB LIES BELOW THE BOTTOM OF THE END CAP APPROXIMATELY 1.75" (44 mm).BACKFILL MATERIAL SHOULD BE REMOVED FROM BELOW THE N-12 STUB SO THAT THE FITTING SITS LEVEL.NOTE: ALL DIMENSIONS ARE NOMINALNOMINAL CHAMBER SPECIFICATIONSSIZE (W X H X INSTALLED LENGTH)51.0" X 30.0" X 85.4" (1295 mm X 762 mm X 2169 mm)CHAMBER STORAGE46.2 CUBIC FEET (1.30 m³)MINIMUM INSTALLED STORAGE*78.4 CUBIC FEET (2.20 m³)WEIGHT75.0 lbs.(33.6 kg)*ASSUMES 6" (152 mm) STONE ABOVE, 9" (229 mm) BELOW,AND 6" (152 mm) BETWEEN CHAMBERSSTUBS AT BOTTOM OF END CAP FOR PART NUMBERS ENDING WITH "B"STUBS AT TOP OF END CAP FOR PART NUMBERS ENDING WITH "T"DC-780 TECHNICAL SPECIFICATIONNTS90.7" (2304 mm) ACTUAL LENGTH85.4" (2169 mm) INSTALLED LENGTHBUILD ROW IN THIS DIRECTIONAACB51.0"(1295 mm)30.0"(762 mm)45.9" (1166 mm)29.3"(744 mm)12.2"(310 mm)OVERLAP NEXT CHAMBER HERE(OVER SMALL CORRUGATION)ACCEPTS 4" (100 mm) SCH 40 PVC PIPE FOR INSPECTION PORT. FOR PIPESIZES LARGER THAN 4" (100 mm) UP TO 10" (250 mm) USE INSERTA TEECONNECTION CENTERED ON A CHAMBER CREST CORRUGATIONSTART ENDACCEPTABLE FILL MATERIALS: STORMTECH DC-780 CHAMBER SYSTEMSPLEASE NOTE:1.THE LISTED AASHTO DESIGNATIONS ARE FOR GRADATIONS ONLY. THE STONE MUST ALSO BE CLEAN, CRUSHED, ANGULAR. FOR EXAMPLE, A SPECIFICATION FOR #4 STONE WOULD STATE: "CLEAN, CRUSHED, ANGULAR NO. 4 (AASHTO M43) STONE".2.STORMTECH COMPACTION REQUIREMENTS ARE MET FOR 'A' LOCATION MATERIALS WHEN PLACED AND COMPACTED IN 9" (230 mm) (MAX) LIFTS USING TWO FULL COVERAGES WITH A VIBRATORY COMPACTOR.3.WHERE INFILTRATION SURFACES MAY BE COMPROMISED BY COMPACTION, FOR STANDARD DESIGN LOAD CONDITIONS, A FLAT SURFACE MAY BE ACHIEVED BY RAKING OR DRAGGING WITHOUT COMPACTION EQUIPMENT. FOR SPECIAL LOAD DESIGNS, CONTACT STORMTECH FORCOMPACTION REQUIREMENTS.4.ONCE LAYER 'C' IS PLACED, ANY SOIL/MATERIAL CAN BE PLACED IN LAYER 'D' UP TO THE FINISHED GRADE. MOST PAVEMENT SUBBASE SOILS CAN BE USED TO REPLACE THE MATERIAL REQUIREMENTS OF LAYER 'C' OR 'D' AT THE SITE DESIGN ENGINEER'S DISCRETION.NOTES:1.CHAMBERS SHALL MEET THE REQUIREMENTS OF ASTM F2418, "STANDARD SPECIFICATION FOR POLYPROPYLENE (PP) CORRUGATED WALL STORMWATER COLLECTION CHAMBERS".2.DC-780 CHAMBERS SHALL BE DESIGNED IN ACCORDANCE WITH ASTM F2787 "STANDARD PRACTICE FOR STRUCTURAL DESIGN OF THERMOPLASTIC CORRUGATED WALL STORMWATER COLLECTION CHAMBERS".3.THE SITE DESIGN ENGINEER IS RESPONSIBLE FOR ASSESSING THE BEARING RESISTANCE (ALLOWABLE BEARING CAPACITY) OF THE SUBGRADE SOILS AND THE DEPTH OF FOUNDATION STONE WITHCONSIDERATION FOR THE RANGE OF EXPECTED SOIL MOISTURE CONDITIONS.4.PERIMETER STONE MUST BE EXTENDED HORIZONTALLY TO THE EXCAVATION WALL FOR BOTH VERTICAL AND SLOPED EXCAVATION WALLS.5.REQUIREMENTS FOR HANDLING AND INSTALLATION:·TO MAINTAIN THE WIDTH OF CHAMBERS DURING SHIPPING AND HANDLING, CHAMBERS SHALL HAVE INTEGRAL, INTERLOCKING STACKING LUGS.·TO ENSURE A SECURE JOINT DURING INSTALLATION AND BACKFILL, THE HEIGHT OF THE CHAMBER JOINT SHALL NOT BE LESS THAN 2”.·TO ENSURE THE INTEGRITY OF THE ARCH SHAPE DURING INSTALLATION, a) THE ARCH STIFFNESS CONSTANT SHALL BE GREATER THAN OR EQUAL TO 550 LBS/FT/%. THE ASC IS DEFINED IN SECTION 6.2.8 OFASTM F2418. AND b) TO RESIST CHAMBER DEFORMATION DURING INSTALLATION AT ELEVATED TEMPERATURES (ABOVE 73° F / 23° C), CHAMBERS SHALL BE PRODUCED FROM REFLECTIVE GOLD OR YELLOWCOLORS.MATERIAL LOCATIONDESCRIPTIONAASHTO MATERIALCLASSIFICATIONSCOMPACTION / DENSITY REQUIREMENTDFINAL FILL: FILL MATERIAL FOR LAYER 'D' STARTS FROM THE TOP OF THE 'C'LAYER TO THE BOTTOM OF FLEXIBLE PAVEMENT OR UNPAVED FINISHEDGRADE ABOVE. NOTE THAT PAVEMENT SUBBASE MAY BE PART OF THE 'D'LAYERANY SOIL/ROCK MATERIALS, NATIVE SOILS, OR PER ENGINEER'S PLANS.CHECK PLANS FOR PAVEMENT SUBGRADE REQUIREMENTS.N/APREPARE PER SITE DESIGN ENGINEER'S PLANS. PAVEDINSTALLATIONS MAY HAVE STRINGENT MATERIAL ANDPREPARATION REQUIREMENTS.CINITIAL FILL: FILL MATERIAL FOR LAYER 'C' STARTS FROM THE TOP OF THEEMBEDMENT STONE ('B' LAYER) TO 18" (450 mm) ABOVE THE TOP OF THECHAMBER. NOTE THAT PAVEMENT SUBBASE MAY BE A PART OF THE 'C'LAYER.GRANULAR WELL-GRADED SOIL/AGGREGATE MIXTURES, <35% FINES ORPROCESSED AGGREGATE. MOST PAVEMENT SUBBASE MATERIALS CAN BE USED IN LIEU OF THISLAYER.AASHTO M145¹A-1, A-2-4, A-3ORAASHTO M43¹3, 357, 4, 467, 5, 56, 57, 6, 67, 68, 7, 78, 8, 89, 9, 10BEGIN COMPACTIONS AFTER 12" (300 mm) OF MATERIAL OVERTHE CHAMBERS IS REACHED. COMPACT ADDITIONAL LAYERS IN6" (150 mm) MAX LIFTS TO A MIN. 95% PROCTOR DENSITY FORWELL GRADED MATERIAL AND 95% RELATIVE DENSITY FORPROCESSED AGGREGATE MATERIALS. ROLLER GROSSVEHICLE WEIGHT NOT TO EXCEED 12,000 lbs (53 kN). DYNAMICFORCE NOT TO EXCEED 20,000 lbs (89 kN).BEMBEDMENT STONE: FILL SURROUNDING THE CHAMBERS FROM THEFOUNDATION STONE ('A' LAYER) TO THE 'C' LAYER ABOVE.CLEAN, CRUSHED, ANGULAR STONEAASHTO M43¹3, 357, 4, 467, 5, 56, 57NO COMPACTION REQUIRED.AFOUNDATION STONE: FILL BELOW CHAMBERS FROM THE SUBGRADE UP TOTHE FOOT (BOTTOM) OF THE CHAMBER.CLEAN, CRUSHED, ANGULAR STONEAASHTO M43¹3, 357, 4, 467, 5, 56, 57PLATE COMPACT OR ROLL TO ACHIEVE A FLAT SURFACE.2,318"(450 mm) MIN*12'(3.7 m)MAX51" (1295 mm)6" (150 mm) MIN6"(150 mm) MINDCBA12" (300 mm) MIN12" (300 mm) TYP30"(760 mm)DEPTH OF STONE TO BE DETERMINEDBY DESIGN ENGINEER 9" (230 mm) MIN*TO BOTTOM OF FLEXIBLE PAVEMENT. FOR UNPAVEDINSTALLATIONS WHERE RUTTING FROM VEHICLES MAY OCCUR,INCREASE COVER TO 24" (600 mm).PAVEMENT LAYER (DESIGNEDBY SITE DESIGN ENGINEER)SC-740/DC-780END CAPEXCAVATION WALL (CANBE SLOPED OR VERTICAL)PERIMETER STONE(SEE NOTE 4)SUBGRADE SOILS(SEE NOTE 3)ADS GEOSYNTHETICS 601T NON-WOVEN GEOTEXTILE ALLAROUND CLEAN, CRUSHED, ANGULAR STONE IN A & B LAYERS121.95'78.10'115.47'75.50'GBCADEFPROPOSED ELEVATIONSMAXIMUM ALLOWABLE GRADE (TOP OF PAVEMENT/UNPAVED):4852.88MINIMUM ALLOWABLE GRADE (UNPAVED WITH TRAFFIC):4842.88MINIMUM ALLOWABLE GRADE (UNPAVED NO TRAFFIC):4842.38MINIMUM ALLOWABLE GRADE (TOP OF RIGID CONCRETE PAVEMENT):4842.38*MINIMUM ALLOWABLE GRADE (BASE OF FLEXIBLE PAVEMENT):4842.38TOP OF STONE:4841.38TOP OF DC-780 CHAMBER:4840.8812" x 12" BOTTOM MANIFOLD INVERT:4838.4812" BOTTOM CONNECTION INVERT:4838.4824" x 24" BOTTOM MANIFOLD INVERT:4838.3924" ISOLATOR ROW PLUS INVERT:4838.39BOTTOM OF DC-780 CHAMBER:4838.38UNDERDRAIN INVERT:4837.63BOTTOM OF STONE:4837.63PROPOSED LAYOUT254STORMTECH DC-780 CHAMBERS32STORMTECH DC-780 END CAPS6STONE ABOVE (in)9STONE BELOW (in)40STONE VOID21116INSTALLED SYSTEM VOLUME (CF)(PERIMETER STONE INCLUDED)(COVER STONE INCLUDED)(BASE STONE INCLUDED)9376SYSTEM AREA (SF)400.1SYSTEM PERIMETER (ft)*INVERT ABOVE BASE OF CHAMBERMAX FLOWINVERT*DESCRIPTIONITEM ONLAYOUTPART TYPE0.10"24" BOTTOM PREFABRICATED EZ END CAP, PART#: SC740ECEZ / TYP OF ALL 24" BOTTOMCONNECTIONS AND ISOLATOR PLUS ROWSAPREFABRICATED EZ END CAPINSTALL FLAMP ON 24" ACCESS PIPE / PART#: SC74024RAMPBFLAMP0.10"24" x 24" BOTTOM MANIFOLD, ADS N-12CMANIFOLD1.20"12" x 12" BOTTOM MANIFOLD, ADS N-12DMANIFOLD4.0 CFS OUTOCS (DESIGN BY ENGINEER / PROVIDED BY OTHERS)ECONCRETE STRUCTURE26.6 CFS IN(DESIGN BY ENGINEER / PROVIDED BY OTHERS)FCONCRETE STRUCTUREW/WEIR6" ADS N-12 DUAL WALL PERFORATED HDPE UNDERDRAINGUNDERDRAINISOLATOR ROW PLUS(SEE DETAIL)PLACE MINIMUM 12.50' OF ADSPLUS125 WOVEN GEOTEXTILE OVER BEDDINGSTONE AND UNDERNEATH CHAMBER FEET FOR SCOUR PROTECTION AT ALLCHAMBER INLET ROWSPerimeterNOTES•MANIFOLD SIZE TO BE DETERMINED BY SITE DESIGN ENGINEER. SEETECH NOTE #6.32 FOR MANIFOLD SIZING GUIDANCE.•DUE TO THE ADAPTATION OF THIS CHAMBER SYSTEM TO SPECIFICSITE AND DESIGN CONSTRAINTS, IT MAY BE NECESSARY TO CUT ANDCOUPLE ADDITIONAL PIPE TO STANDARD MANIFOLDCOMPONENTS IN THE FIELD.•THE SITE DESIGN ENGINEER MUST REVIEW ELEVATIONS AND IFNECESSARY ADJUST GRADING TO ENSURE THE CHAMBER COVERREQUIREMENTS ARE MET.•THIS CHAMBER SYSTEM WAS DESIGNED WITHOUT SITE-SPECIFICINFORMATION ON SOIL CONDITIONS OR BEARING CAPACITY. THE SITEDESIGN ENGINEER IS RESPONSIBLE FOR DETERMININGTHE SUITABILITY OF THE SOIL AND PROVIDING THE BEARING CAPACITY OFTHE INSITU SOILS. THE BASE STONE DEPTH MAY BE INCREASED ORDECREASED ONCE THIS INFORMATION ISPROVIDED.•NOT FOR CONSTRUCTION: THIS LAYOUT IS FORDIMENSIONAL PURPOSES ONLY TO PROVE CONCEPT & THE REQUIREDSTORAGE VOLUME CAN BE ACHIEVED ON SITE.