Loading...
HomeMy WebLinkAbout001 - G001 COVER SHEETJEFFERY A.KANNING BILLINGSMT 1482 ANMO NT A STO F ATE AR C TIH TCEDSE N E C IL 1482 JEFFERY A.KANNING BILLINGSMT COPYRIGHT C PREPARED FOR :PROJECT NUMBER:PROJECT ARCHITECT : ISSUE DATES:CITY VINEYARD T.I. 2825 WEST MAIN STREET, BOZEMAN, MT 59718 BECKY RENO JEFF KANNING 2327 REV0 PERMIT SET 10/4/2023 - REV0 PERMIT SET - - - - 2023 G001 COVER SHEET - C O L L A B O R A T I V ED E S I G N A R C H I T E C T S2327 - CITY VINEYARD T.I.2280 GRANT ROAD, SUITE C BILLINGS, MT 59102 406.248.3443www.cd-mt.comA R C H I T E C T S THESE DOCUMENTS, IN PART OR IN WHOLE, AND THEDESIGN THEY REPRESENT ARE THE SOLE PROPERTY OFCOLLABORATIVE DESIGN ARCHITECTS. THESEDOCUMENTS ARE INTENDED FOR THE PROJECT ON THESITE INDICATED. ANY USE, REPRODUCTION,MODIFICATION OR ADAPTATION WITHOUT THE EXPRESSWRITTEN CONSENT OF COLLABORATIVE DESIGNARCHITECTS IS STRICTLY PROHIBITED. CITY VINEYARD T.I.CITY VINEYARD T.I. JEFF KANNING OWNER ARCHITECT BECKY RENO MEP ENGINEERING RYAN THOMPSON JEFF KRAFT COPYRIGHTCTHESE DOCUMENTS, IN PART OR IN WHOLE, AND THEDESIGN THEY REPRESENT ARE THE SOLE PROPERTY OFCOLLABORATIVE DESIGN ARCHITECTS. THESEDOCUMENTS ARE INTENDED FOR THE PROJECT ON THESITE INDICATED. ANY USE, REPRODUCTION,MODIFICATION OR ADAPTATION WITHOUT THEEXPRESS WRITTEN CONSENT OF COLLABORATIVEDESIGN ARCHITECTS IS STRICTLY PROHIBITED.COLLABORATIVE DESIGNARCHITECTS2280 GRANT ROAD - SUITE C BILLINGS, MT 59102T. 406.248.3443 F. 406.248.3765 www.collaborativedesignarchitects.comPREPARED FOR: PROJECT MANAGER: PROJECT NO: ISSUE DATES:L O C K W O O DH I G H S C H O O L1932 HIGHWAY 87 EAST20192-8-19 SCHOOL DISTRICT 26 1828 NSP FOOTING AND FOUNDATION SET BILLINGSMONTANANICHOLAS S.PANCHEAU BILLINGSMT 6874 AN MO NT ASTOF A T E ARC TIH TCE DSE NECIL 6874 NICHOLAS S. PANCHEAU BILLINGSMT G-002 GENERAL NOTES CONSTRUCTION DOCUMENTS: 1 THE CONSTRUCTION CONTRACT INCLUDES THE EXECUTED, SIGNED AGREEMENT BETWEEN THE OWNER AND THE CONTRACTOR, AND THE CONSTRUCTION DOCUMENTS, WHICH INCLUDES THE DRAWINGS, THE GENERAL CONDITIONS, THE SUPPLEMENTARY CONDITIONS, AND THE DRAWINGS. 2 BY EXECUTION OF THE CONSTRUCTION CONTRACT, THE CONTRACTOR REPRESENTS THAT HE OR SHE HAS (1) READ AND UNDERSTANDS THE REQUIREMENTS OF THE CONSTRUCTION DOCUMENTS, (2) VISITED THE PROJECT-SITE, (3) BECOME FAMILIAR WITH THE LOCAL CONDITIONS UNDER WHICH THE WORK WILL BE PERFORMED, (4) CORRELATED PERSONAL OBSERVATIONS WITH REQUIREMENTS OF THE CONTRACT DOCUMENTS, AND (5) THAT HE OR SHE WILL COMPLY WITH ALL REQUIREMENTS OF THE CONSTRUCTION DOCUMENTS. 3 THE INTENT OF THE CONSTRUCTION DOCUMENTS IS TO INCLUDE ALL ITEMS NECESSARY FOR THE PROPER EXECUTION AND COMPLETION OF THE CONSTRUCTION WORK - AND TO PROVIDE (FURNISH AND INSTALL) ALL PRODUCTS, MATERIALS, EQUIPMENT OR ACCESSORIES REQUIRED FOR PROPER OPERATION, IN ACCORDANCE WITH THEIR MANUFACTURER'S REQUIREMENTS. 4 THE CONTRACT DOCUMENTS ARE COMPLEMENTARY - WHAT IS REQUIRED BY ONE SHALL BE AS BINDING AS IF REQUIRED BY ALL. WHILE PREPARED WITH DUE CARE AND DILIGENCE, PERFECTION IS NOT POSSIBLE. DESIGN AND CONSTRUCTION ARE COMPLEX - EVERY POSSIBLE CONDITION OR CONTINGENCY CANNOT BE ANTICIPATED OR FULLY INDICATED WITHIN THE DOCUMENTS. 5 CAREFULLY STUDY AND COMPARE THE VARIOUS DRAWINGS (INCLUDING BUT NOT LIMITED TO ARCHITECTURAL, STRUCTURAL, MECHANICAL OR ELECTRICAL) AND OTHER CONTRACT DOCUMENTS WITH THE EXISTING CONDITIONS AT THE PROJECT-SITE BEFORE STARTING CONSTRUCTION. REPORT ERRORS, INCONSISTENCIES OR OMISSIONS DISCOVERED FOR CLARIFICATION. THE CONTRACTOR WILL BE RESPONSIBLE FOR REPAIR OR CORRECTION COSTS IF WORK IS EXECUTED WITH KNOWLEDGE THAT IT INVOLVES AN ERROR, INCONSISTENCY OR OMISSION - WITHOUT THE ABOVE NOTICE. 6 IN THE EVENT OF CONFLICT OR AMBIGUITY WITHIN THE CONSTRUCTION DOCUMENTS, THE CONTRACTOR WILL BE DEEMED TO HAVE AGREED TO PROVIDE THE GREATER QUANTITY AND / OR BETTER QUALITY OF MATERIALS AND / OR WORK. OMISSIONS IN THE DESCRIPTION OF THE WORK DO NOT RELIEVE THE CONTRACTOR FROM PROVIDING A COMPLETE PROJECT. GENERAL SCOPE OF WORK: 7 PERFORM ALL CONSTRUCTION WORK INDICATED OR OTHERWISE REQUIRED FOR COMPLETION OF THE PROJECT - EXCEPT AS NOTED OTHERWISE. 8 SCHEDULE AND COORDINATE THE WORK OF THE COMPLETE PROJECT TO ASSURE AN EFFICIENT AND ORDERLY SEQUENCE OF INSTALLATION OF ALL ELEMENTS - WITH PROVISIONS FOR ACCOMMODATING ITEMS TO BE INSTALLED LATER. 9 THE CONTRACTOR IS SOLELY RESPONSIBLE FOR CONSTRUCTION MEANS, METHODS, TECHNIQUES, SEQUENCES AND PROCEDURES AND FOR COORDINATING ALL PORTIONS OF THE WORK. 10 PROVIDE ALL REQUIRED NOTICES FOR INSPECTIONS AND APPROVALS OF THE WORK BY THE AUTHORITY HAVING JURISDICTION. THE MOST RESTRICTIVE CODE REQUIREMENTS AS INTERPRETED BY LOCAL OFFICIALS WILL APPLY. 11 VERIFY LOCATIONS OF EXISTING UTILITY SERVICE CONNECTIONS SERVING THE PROJECT BEFORE STARTING CONSTRUCTION. LOCATIONS OF EXISTING UTILITIES NOTED ARE APPROXIMATE, AND MAY BE BASED ON UN-VERIFIED INFORMATION. PROVIDE ALL CONNECTIONS REQUIRED AT UTILITY CONNECTION POINTS AT NO ADDITIONAL COST TO THE OWNER. 12 PROVIDE SUBCONTRACTORS WITH A FULL-SET OF THE CONSTRUCTION DOCUMENTS TO ENSURE COORDINATION BETWEEN ALL TRADES AND EACH SUBCONTRACTOR. 13 ALL CONSTRUCTION WORK MUST BE OF GOOD QUALITY - FREE FROM DEFECTS AND IN ACCORDANCE WITH REQUIREMENTS OF THE CONSTRUCTION DOCUMENTS - OR THE WORK MAY BE CONSIDERED DEFECTIVE - AND SUBJECT TO CORRECTION OR REPLACEMENT BY THE CONTRACTOR WITHIN A PERIOD OF ONE (1) YEAR AFTER SUBSTANTIAL COMPLETION. COORDINATION WITH SEPARATE CONTRACTORS: 14 COORDINATE WITH THE OWNER'S SEPARATE CONTRACTORS OR SUPPLIERS FOR WORK INDICATED AS BEING OWNER-FURNISHED & CONTRACTOR INSTALLED (OFCI), OR NOT-IN-CONTRACT (NIC). PROVIDE SCHEDULED DATES WHEN THE PROJECT WILL BE READY FOR DELIVERY OR INSTALLATION OF OWNER FURNISHED PRODUCTS, AS APPLICABLE. 15 COORDINATE THIS WORK OF THIS PROJECT WITH OTHER CONTRACTORS AT SEPARATE CONSTRUCTION PROJECTS WITHIN THE SAME DEVELOPMENT, SO THAT THIS WORK WILL NOT INTERFERE WITH OR DELAY THEIR OPERATIONS. INSTALLATION OF OWNER-FURNISHED PRODUCTS: 16 COORDINATE, RECEIVE AT SITE, VERIFY RECEIPT, HANDLE, STORE ON-SITE (IF REQUIRED), PROTECT AND INSTALL OWNER-FURNISHED PRODUCTS, AND PROVIDE SERVICE CONNECTIONS AS APPLICABLE. 17 NOTIFY THE ARCHITECT/OWNER WITHIN SEVEN (7) DAYS OF RECEIPT OF ANY ITEMS ARE MISSING, DAMAGED OR OTHERWISE DEFECTIVE. LACK OF NOTIFICATION WILL BE CONSIDERED PRESUMPTIVE PROOF THAT ALL ITEMS DID ARRIVE UNDAMAGED AND IN PROPER QUANTITIES, AND ANY REPLACEMENT OR REPAIRS NECESSARY WILL THEN BE THE RESPONSIBILITY OF THE CONTRACTOR. 18 REPAIR DAMAGE TO OWNER-FURNISHED PRODUCTS CAUSED BY CONSTRUCTION OPERATIONS TO THE OWNER'S SATISFACTION. TEMPORARY FACILITIES, UTILITIES & CONTROLS: 19 PROVIDE BARRIERS, FENCES AND OTHER CONTROLS TO PREVENT PUBLIC ENTRY TO CONSTRUCTION AREAS, AND TO PROTECT CONSTRUCTION WORKERS AND THE PUBLIC FROM HAZARDS OF CONSTRUCTION. 20 PROVIDE PROTECTION OF CONSTRUCTION MATERIALS FROM LOSS, DAMAGE, FIRE OR THEFT, AND PROTECT EXISTING CONSTRUCTION FROM DAMAGE BY CONSTRUCTION OPERATIONS. 21 PROVIDE TEMPORARY FIRE-PREVENTION MEASURES AND PROCEDURES INCLUDING FIRE-EXTINGUISHERS PER CITY REQUIREMENTS. 22 PROVIDE DUMPSTERS AND COLLECT WASTE DAILY. DISPOSE OF MATERIAL IN A LAWFUL MANNER. PLACE DUMPSTER IN LOCATION APPROVED BY OWNER. GENERAL PRODUCT REQUIREMENTS: 23 STORE PRODUCTS PER MANUFACTURER'S INSTRUCTIONS, PROTECTED FROM DAMAGE OR ABUSE, AND WITH VENTILATION TO AVOID CONDENSATION. 24 APPLICATION OF A MATERIAL OR EQUIPMENT ITEM TO WORK INSTALLED BY OTHERS CONSTITUTES ACCEPTANCE OF THAT WORK AND ASSUMPTION OF RESPONSIBILITY FOR SATISFACTORY INSTALLATION AND PERFORMANCE. 25 INSPECT EACH ITEM OF MATERIAL OR EQUIPMENT IMMEDIATELY PRIOR TO INSTALLATION. REJECT DAMAGED AND DEFECTIVE ITEMS. COORDINATION WITH FIXTURES, FURNISHINGS & EQUIPMENT (FF&E): 26 REVIEW THE OWNER'S SEPARATE CASEWORK/FIXTURES, FURNISHINGS, & EQUIPMENT,DRAWINGS FOR UNIT SIZES, WEIGHTS, SERVICE-CONNECTIONS AND CLEARANCES REQUIRED - WHETHER FURNISHED OR INSTALLED BY THE CONTRACTOR OR OTHERS. VERIFY THAT REQUIRED ROUGH-INS, CONNECTIONS AND CLEARANCES WILL BE PROVIDED. PROVIDE OPENINGS AND DELIVERY ACCESS FOR FF&E ITEMS, AND PROVIDE STAGING SPACE FOR THEIR INSTALLATION. REPORT DISCREPANCIES OR OMISSIONS OF EQUIPMENT REQUIREMENTS PRIOR TO INSTALLATION. 27 PROVIDE ALL HVAC, PLUMBING, GAS OR ELECTRIC SERVICE CONNECTIONS TO CASEWORK / FIXTURES, OR EQUIPMENT INDICATED (WHETHER UNITS ARE INSTALLED BY CONTRACTOR OR BY OTHERS) GENERAL EXECUTION OF THE WORK: 28 ESTABLISH AND MAINTAIN DURABLE MARKERS TO LOCATE ALL ELEMENTS OF THE WORK, INCLUDING BUT NOT LIMITED TO PARTITIONS, CASEWORK, FIXTURES, EQUIPMENT AND LIGHT-FIXTURES, AND THEIR RELATED MECHANICAL, ELECTRICAL AND PLUMBING CONNECTIONS. 29 AT PROJECTIONS OF FINISHED SURFACES, INCLUDING PILASTERS OR THICKENED WALLS, RETURN ALL EXPOSED SURFACE FINISHES BACK TO THE PRIMARY SURFACE EVEN IF NOT SPECIFICALLY NOTED. 30 PERFORM ALL CUTTING, PATCHING AND FITTING TO ACCOMMODATE CONSTRUCTION WORK AND TO ACHIEVE THE INTENT OF THE CONSTRUCTION DOCUMENTS. CUT & PATCH PARTITIONS FOR INSTALLATION OF PLUMBING OR ELECTRICAL SERVICES AND FOR INSTALLATION OF WALL BLOCKING, IF NECESSARY. PROVIDE ESCUTCHEONS, GROMMETS AND SIMILAR SURFACE CLOSURE OR FINISHED TRIMS AT EXPOSED PENETRATIONS OF FINISHED SURFACES. COORDINATION WITH ADJACENT CONSTRUCTION: 31 LIMIT WORK TO OCCUR WITHIN THE PROJECT SITE, OR WITHIN OTHER AREAS DESIGNATED OR APPROVED FOR USE BY THE OWNER / LANDLORD / OR DEVELOPER. CONNECT TO EXISTING UTILITY SERVICES BEYOND THE PROJECT-SITE IN THE MOST EXPEDITIOUS MANNER POSSIBLE WITH MINIMAL DISTURBANCE OF EXISTING ELEMENTS OR FINISHES. FINAL CLEANING: 32 JUST BEFORE OWNER OCCUPANCY, CLEAN ALL SURFACES INCLUDING FIXTURES AND EQUIPMENT FOR THE OWNER'S USE AND OPERATION. POLISH GLASS AND PLUMBING FIXTURES TO BE WITHOUT NOTICEABLE STREAKS. VACUUM CLEAN FLOORS AND DAMP WIPE WALLS, FIXTURES AND EQUIPMENT TO BE DUST-FREE WITHOUT STAINS, FILMS AND OTHER DISTRACTING SUBSTANCES. 33 CLEAN THE PROJECT SITE OF RUBBISH, LITTER AND OTHER FOREIGN SUBSTANCES. BROOM CLEAN PAVED AREAS AND REMOVE STAINS, SPILLS AND OTHER FOREIGN DEPOSITS. RAKE GROUNDS THAT ARE NEITHER PAVED NOR PLANTED, TO A SMOOTH EVEN-TEXTURED SURFACE. TURN-OVER / CLOSE-OUT REQUIREMENTS: 34 SET ALL TIME CLOCKS, THERMOSTATS AND SIMILAR DEVICES TO THE CURRENT LOCAL TIME. PROVIDE A PRINTED LIST OF NAMES, ADDRESSES AND PHONE NUMBERS OF ALL SUB-CONTRACTORS AND MATERIAL SUPPLIERS USED. ARRANGE FOR ALL INSPECTIONS AND FURNISH OWNER WITH CERTIFICATE OF OCCUPANCY. 35 SUBMIT OPERATION AND MAINTENANCE DATA TO INCLUDE EMERGENCY INSTRUCTIONS, SPARE PARTS LISTS, PRODUCT WARRANTIES, WIRING DIAGRAMS, INSPECTION PROCEDURES, AND APPLICABLE SHOP DRAWINGS AND PRODUCT DATA. GENERAL CONSTRUCTION NOTES REV0 PERMIT SET AREA OF WORK COLLABORATIVE DESIGN ARCHITECTS 2280 GRANT ROAD - SUITE C, BILLINGS, MT 59102 T. 406.248.3443 SHEET INDEX GENERAL SHEETS BUILDING PLANS DETAILS SCHEDULES INTERIOR ELEVATIONS MECHANICAL SHEETS PLUMBING SHEETS ELECTRICAL SHEETS FIRE PROTECTION SHEETS G001 G002 G011 A101 A102 A103 A104 FS-1 A511 A601 A701 A702 A703 A704 A705 A706 A707 M001 M002 M101 M501 P001 P002 P101 P501 E001 E002 E003 E004 E005 E101 E201 F001 F002 F101 COVER SHEET ACCESSIBILITY REQUIREMENTS FIRE & LIFE SAFETY PLAN EXISTING FLOOR PLAN FLOOR PLAN REFLECTED CEILING PLAN FINISH FLOOR PLAN EQUIPMENT PLAN DETAILS DOOR & HARDWARE SCHEDULES INTERIOR ELEVATIONS INTERIOR ELEVATIONS INTERIOR ELEVATIONS INTERIOR ELEVATIONS INTERIOR ELEVATIONS INTERIOR ELEVATIONS INTERIOR ELEVATIONS MECHANICAL COVER SHEET MECHANICAL SPECIFICATIONS MECHANICAL FLOOR PLAN MECHANICAL DETAILS & SCHEDULES PLUMBING COVER SHEET PLUMBING SPECIFICATIONS PLUMBING FLOOR PLAN PLUMBING DETAILS & SCHEDULES ELECTRICAL SYMBOLS AND ABBREVIATIONS ELECTRICAL SPECIFICATIONS ELECTRICAL SPECIFICATIONS ELECTRICAL DETAILS ELECTRICAL SCHEDULES ELECTRICAL POWER AND SIGNAL PLAN ELECTRICAL LIGHTING PLAN FIRE PROTECTION COVER SHEET FIRE PROTECTION DETAILS FIRE PROTECTION REMODEL PLAN 2 G001 KEY PLAN 1 G001 CONCEPTUAL PERSPECTIVE RENDERING 3 G001 VICINITY MAP PROJECT LOCATION CITY VINEYARD of BOZEMAN 2825 W. MAIN ST. BOZEMAN MT 59718 MORRISON MAIERLE 315 NORTH 25TH STREET, SUITE 102 T. 406.237.1262 T. 406.698.1143