HomeMy WebLinkAbout001 - G001 COVER SHEETJEFFERY A.KANNING
BILLINGSMT
1482 ANMO
NT
A
STO F
ATE
AR C TIH TCEDSE
N
E
C
IL 1482
JEFFERY A.KANNING
BILLINGSMT
COPYRIGHT C
PREPARED FOR :PROJECT NUMBER:PROJECT ARCHITECT :
ISSUE DATES:CITY VINEYARD T.I.
2825 WEST MAIN STREET, BOZEMAN, MT 59718
BECKY RENO JEFF KANNING 2327
REV0 PERMIT SET
10/4/2023 - REV0 PERMIT SET
-
-
-
-
2023 G001
COVER SHEET
- C O L L A B O R A T I V ED E S I G N A R C H I T E C T S2327 - CITY VINEYARD T.I.2280 GRANT ROAD, SUITE C BILLINGS, MT 59102 406.248.3443www.cd-mt.comA R C H I T E C T S
THESE DOCUMENTS, IN PART OR IN WHOLE, AND THEDESIGN THEY REPRESENT ARE THE SOLE PROPERTY OFCOLLABORATIVE DESIGN ARCHITECTS. THESEDOCUMENTS ARE INTENDED FOR THE PROJECT ON THESITE INDICATED. ANY USE, REPRODUCTION,MODIFICATION OR ADAPTATION WITHOUT THE EXPRESSWRITTEN CONSENT OF COLLABORATIVE DESIGNARCHITECTS IS STRICTLY PROHIBITED.
CITY VINEYARD T.I.CITY VINEYARD T.I.
JEFF KANNING
OWNER
ARCHITECT
BECKY RENO
MEP ENGINEERING
RYAN THOMPSON
JEFF KRAFT
COPYRIGHTCTHESE DOCUMENTS, IN PART OR IN WHOLE, AND THEDESIGN THEY REPRESENT ARE THE SOLE PROPERTY OFCOLLABORATIVE DESIGN ARCHITECTS. THESEDOCUMENTS ARE INTENDED FOR THE PROJECT ON THESITE INDICATED. ANY USE, REPRODUCTION,MODIFICATION OR ADAPTATION WITHOUT THEEXPRESS WRITTEN CONSENT OF COLLABORATIVEDESIGN ARCHITECTS IS STRICTLY PROHIBITED.COLLABORATIVE DESIGNARCHITECTS2280 GRANT ROAD - SUITE C BILLINGS, MT 59102T. 406.248.3443 F. 406.248.3765 www.collaborativedesignarchitects.comPREPARED FOR:
PROJECT MANAGER:
PROJECT NO:
ISSUE DATES:L O C K W O O DH I G H S C H O O L1932 HIGHWAY 87 EAST20192-8-19
SCHOOL DISTRICT 26
1828
NSP
FOOTING AND FOUNDATION SET BILLINGSMONTANANICHOLAS S.PANCHEAU
BILLINGSMT
6874 AN
MO
NT
ASTOF
A T E
ARC TIH TCE
DSE
NECIL 6874
NICHOLAS S.
PANCHEAU
BILLINGSMT
G-002
GENERAL
NOTES
CONSTRUCTION DOCUMENTS:
1 THE CONSTRUCTION CONTRACT INCLUDES THE EXECUTED, SIGNED AGREEMENT BETWEEN THE OWNER AND THE CONTRACTOR, AND THE CONSTRUCTION DOCUMENTS, WHICH
INCLUDES THE DRAWINGS, THE GENERAL CONDITIONS, THE SUPPLEMENTARY CONDITIONS, AND THE DRAWINGS.
2 BY EXECUTION OF THE CONSTRUCTION CONTRACT, THE CONTRACTOR REPRESENTS THAT HE OR SHE HAS (1) READ AND UNDERSTANDS THE REQUIREMENTS OF THE CONSTRUCTION
DOCUMENTS, (2) VISITED THE PROJECT-SITE, (3) BECOME FAMILIAR WITH THE LOCAL CONDITIONS UNDER WHICH THE WORK WILL BE PERFORMED, (4) CORRELATED PERSONAL OBSERVATIONS
WITH REQUIREMENTS OF THE CONTRACT DOCUMENTS, AND (5) THAT HE OR SHE WILL COMPLY WITH ALL REQUIREMENTS OF THE CONSTRUCTION DOCUMENTS.
3 THE INTENT OF THE CONSTRUCTION DOCUMENTS IS TO INCLUDE ALL ITEMS NECESSARY FOR THE PROPER EXECUTION AND COMPLETION OF THE CONSTRUCTION WORK - AND TO
PROVIDE (FURNISH AND INSTALL) ALL PRODUCTS, MATERIALS, EQUIPMENT OR ACCESSORIES REQUIRED FOR PROPER OPERATION, IN ACCORDANCE WITH THEIR MANUFACTURER'S
REQUIREMENTS.
4 THE CONTRACT DOCUMENTS ARE COMPLEMENTARY - WHAT IS REQUIRED BY ONE SHALL BE AS BINDING AS IF REQUIRED BY ALL. WHILE PREPARED WITH DUE CARE AND DILIGENCE,
PERFECTION IS NOT POSSIBLE. DESIGN AND CONSTRUCTION ARE COMPLEX - EVERY POSSIBLE CONDITION OR CONTINGENCY CANNOT BE ANTICIPATED OR FULLY INDICATED WITHIN THE
DOCUMENTS.
5 CAREFULLY STUDY AND COMPARE THE VARIOUS DRAWINGS (INCLUDING BUT NOT LIMITED TO ARCHITECTURAL, STRUCTURAL, MECHANICAL OR ELECTRICAL) AND OTHER CONTRACT
DOCUMENTS WITH THE EXISTING CONDITIONS AT THE PROJECT-SITE BEFORE STARTING CONSTRUCTION. REPORT ERRORS, INCONSISTENCIES OR OMISSIONS DISCOVERED FOR
CLARIFICATION. THE CONTRACTOR WILL BE RESPONSIBLE FOR REPAIR OR CORRECTION COSTS IF WORK IS EXECUTED WITH KNOWLEDGE THAT IT INVOLVES AN ERROR, INCONSISTENCY OR
OMISSION - WITHOUT THE ABOVE NOTICE.
6 IN THE EVENT OF CONFLICT OR AMBIGUITY WITHIN THE CONSTRUCTION DOCUMENTS, THE CONTRACTOR WILL BE DEEMED TO HAVE AGREED TO PROVIDE THE GREATER QUANTITY
AND / OR BETTER QUALITY OF MATERIALS AND / OR WORK. OMISSIONS IN THE DESCRIPTION OF THE WORK DO NOT RELIEVE THE CONTRACTOR FROM PROVIDING A COMPLETE PROJECT.
GENERAL SCOPE OF WORK:
7 PERFORM ALL CONSTRUCTION WORK INDICATED OR OTHERWISE REQUIRED FOR COMPLETION OF THE PROJECT - EXCEPT AS NOTED OTHERWISE.
8 SCHEDULE AND COORDINATE THE WORK OF THE COMPLETE PROJECT TO ASSURE AN EFFICIENT AND ORDERLY SEQUENCE OF INSTALLATION OF ALL ELEMENTS - WITH PROVISIONS FOR
ACCOMMODATING ITEMS TO BE INSTALLED LATER.
9 THE CONTRACTOR IS SOLELY RESPONSIBLE FOR CONSTRUCTION MEANS, METHODS, TECHNIQUES, SEQUENCES AND PROCEDURES AND FOR COORDINATING ALL PORTIONS OF THE
WORK.
10 PROVIDE ALL REQUIRED NOTICES FOR INSPECTIONS AND APPROVALS OF THE WORK BY THE AUTHORITY HAVING JURISDICTION. THE MOST RESTRICTIVE CODE REQUIREMENTS AS
INTERPRETED BY LOCAL OFFICIALS WILL APPLY.
11 VERIFY LOCATIONS OF EXISTING UTILITY SERVICE CONNECTIONS SERVING THE PROJECT BEFORE STARTING CONSTRUCTION. LOCATIONS OF EXISTING UTILITIES NOTED ARE
APPROXIMATE, AND MAY BE BASED ON UN-VERIFIED INFORMATION. PROVIDE ALL CONNECTIONS REQUIRED AT UTILITY CONNECTION POINTS AT NO ADDITIONAL COST TO THE OWNER.
12 PROVIDE SUBCONTRACTORS WITH A FULL-SET OF THE CONSTRUCTION DOCUMENTS TO ENSURE COORDINATION BETWEEN ALL TRADES AND EACH SUBCONTRACTOR.
13 ALL CONSTRUCTION WORK MUST BE OF GOOD QUALITY - FREE FROM DEFECTS AND IN ACCORDANCE WITH REQUIREMENTS OF THE CONSTRUCTION DOCUMENTS - OR THE WORK
MAY BE CONSIDERED DEFECTIVE - AND SUBJECT TO CORRECTION OR REPLACEMENT BY THE CONTRACTOR WITHIN A PERIOD OF ONE (1) YEAR AFTER SUBSTANTIAL COMPLETION.
COORDINATION WITH SEPARATE CONTRACTORS:
14 COORDINATE WITH THE OWNER'S SEPARATE CONTRACTORS OR SUPPLIERS FOR WORK INDICATED AS BEING OWNER-FURNISHED & CONTRACTOR INSTALLED (OFCI), OR
NOT-IN-CONTRACT (NIC). PROVIDE SCHEDULED DATES WHEN THE PROJECT WILL BE READY FOR DELIVERY OR INSTALLATION OF OWNER FURNISHED PRODUCTS, AS APPLICABLE.
15 COORDINATE THIS WORK OF THIS PROJECT WITH OTHER CONTRACTORS AT SEPARATE CONSTRUCTION PROJECTS WITHIN THE SAME DEVELOPMENT, SO THAT THIS WORK WILL NOT
INTERFERE WITH OR DELAY THEIR OPERATIONS.
INSTALLATION OF OWNER-FURNISHED PRODUCTS:
16 COORDINATE, RECEIVE AT SITE, VERIFY RECEIPT, HANDLE, STORE ON-SITE (IF REQUIRED), PROTECT AND INSTALL OWNER-FURNISHED PRODUCTS, AND PROVIDE SERVICE CONNECTIONS
AS APPLICABLE.
17 NOTIFY THE ARCHITECT/OWNER WITHIN SEVEN (7) DAYS OF RECEIPT OF ANY ITEMS ARE MISSING, DAMAGED OR OTHERWISE DEFECTIVE. LACK OF NOTIFICATION WILL BE
CONSIDERED PRESUMPTIVE PROOF THAT ALL ITEMS DID ARRIVE UNDAMAGED AND IN PROPER QUANTITIES, AND ANY REPLACEMENT OR REPAIRS NECESSARY WILL THEN BE THE RESPONSIBILITY
OF THE CONTRACTOR.
18 REPAIR DAMAGE TO OWNER-FURNISHED PRODUCTS CAUSED BY CONSTRUCTION OPERATIONS TO THE OWNER'S SATISFACTION.
TEMPORARY FACILITIES, UTILITIES & CONTROLS:
19 PROVIDE BARRIERS, FENCES AND OTHER CONTROLS TO PREVENT PUBLIC ENTRY TO CONSTRUCTION AREAS, AND TO PROTECT CONSTRUCTION WORKERS AND THE PUBLIC FROM
HAZARDS OF CONSTRUCTION.
20 PROVIDE PROTECTION OF CONSTRUCTION MATERIALS FROM LOSS, DAMAGE, FIRE OR THEFT, AND PROTECT EXISTING CONSTRUCTION FROM DAMAGE BY CONSTRUCTION
OPERATIONS.
21 PROVIDE TEMPORARY FIRE-PREVENTION MEASURES AND PROCEDURES INCLUDING FIRE-EXTINGUISHERS PER CITY REQUIREMENTS.
22 PROVIDE DUMPSTERS AND COLLECT WASTE DAILY. DISPOSE OF MATERIAL IN A LAWFUL MANNER. PLACE DUMPSTER IN LOCATION APPROVED BY OWNER.
GENERAL PRODUCT REQUIREMENTS:
23 STORE PRODUCTS PER MANUFACTURER'S INSTRUCTIONS, PROTECTED FROM DAMAGE OR ABUSE, AND WITH VENTILATION TO AVOID CONDENSATION.
24 APPLICATION OF A MATERIAL OR EQUIPMENT ITEM TO WORK INSTALLED BY OTHERS CONSTITUTES ACCEPTANCE OF THAT WORK AND ASSUMPTION OF RESPONSIBILITY FOR
SATISFACTORY INSTALLATION AND PERFORMANCE.
25 INSPECT EACH ITEM OF MATERIAL OR EQUIPMENT IMMEDIATELY PRIOR TO INSTALLATION. REJECT DAMAGED AND DEFECTIVE ITEMS.
COORDINATION WITH FIXTURES, FURNISHINGS & EQUIPMENT (FF&E):
26 REVIEW THE OWNER'S SEPARATE CASEWORK/FIXTURES, FURNISHINGS, & EQUIPMENT,DRAWINGS FOR UNIT SIZES, WEIGHTS, SERVICE-CONNECTIONS AND CLEARANCES REQUIRED -
WHETHER FURNISHED OR INSTALLED BY THE CONTRACTOR OR OTHERS. VERIFY THAT REQUIRED ROUGH-INS, CONNECTIONS AND CLEARANCES WILL BE PROVIDED. PROVIDE OPENINGS AND
DELIVERY ACCESS FOR FF&E ITEMS, AND PROVIDE STAGING SPACE FOR THEIR INSTALLATION. REPORT DISCREPANCIES OR OMISSIONS OF EQUIPMENT REQUIREMENTS PRIOR TO INSTALLATION.
27 PROVIDE ALL HVAC, PLUMBING, GAS OR ELECTRIC SERVICE CONNECTIONS TO CASEWORK / FIXTURES, OR EQUIPMENT INDICATED (WHETHER UNITS ARE INSTALLED BY CONTRACTOR
OR BY OTHERS)
GENERAL EXECUTION OF THE WORK:
28 ESTABLISH AND MAINTAIN DURABLE MARKERS TO LOCATE ALL ELEMENTS OF THE WORK, INCLUDING BUT NOT LIMITED TO PARTITIONS, CASEWORK, FIXTURES, EQUIPMENT AND
LIGHT-FIXTURES, AND THEIR RELATED MECHANICAL, ELECTRICAL AND PLUMBING CONNECTIONS.
29 AT PROJECTIONS OF FINISHED SURFACES, INCLUDING PILASTERS OR THICKENED WALLS, RETURN ALL EXPOSED SURFACE FINISHES BACK TO THE PRIMARY SURFACE EVEN IF NOT
SPECIFICALLY NOTED.
30 PERFORM ALL CUTTING, PATCHING AND FITTING TO ACCOMMODATE CONSTRUCTION WORK AND TO ACHIEVE THE INTENT OF THE CONSTRUCTION DOCUMENTS. CUT & PATCH
PARTITIONS FOR INSTALLATION OF PLUMBING OR ELECTRICAL SERVICES AND FOR INSTALLATION OF WALL BLOCKING, IF NECESSARY. PROVIDE ESCUTCHEONS, GROMMETS AND SIMILAR
SURFACE CLOSURE OR FINISHED TRIMS AT EXPOSED PENETRATIONS OF FINISHED SURFACES.
COORDINATION WITH ADJACENT CONSTRUCTION:
31 LIMIT WORK TO OCCUR WITHIN THE PROJECT SITE, OR WITHIN OTHER AREAS DESIGNATED OR APPROVED FOR USE BY THE OWNER / LANDLORD / OR DEVELOPER. CONNECT TO
EXISTING UTILITY SERVICES BEYOND THE PROJECT-SITE IN THE MOST EXPEDITIOUS MANNER POSSIBLE WITH MINIMAL DISTURBANCE OF EXISTING ELEMENTS OR FINISHES.
FINAL CLEANING:
32 JUST BEFORE OWNER OCCUPANCY, CLEAN ALL SURFACES INCLUDING FIXTURES AND EQUIPMENT FOR THE OWNER'S USE AND OPERATION. POLISH GLASS AND PLUMBING FIXTURES
TO BE WITHOUT NOTICEABLE STREAKS. VACUUM CLEAN FLOORS AND DAMP WIPE WALLS, FIXTURES AND EQUIPMENT TO BE DUST-FREE WITHOUT STAINS, FILMS AND OTHER DISTRACTING
SUBSTANCES.
33 CLEAN THE PROJECT SITE OF RUBBISH, LITTER AND OTHER FOREIGN SUBSTANCES. BROOM CLEAN PAVED AREAS AND REMOVE STAINS, SPILLS AND OTHER FOREIGN DEPOSITS. RAKE
GROUNDS THAT ARE NEITHER PAVED NOR PLANTED, TO A SMOOTH EVEN-TEXTURED SURFACE.
TURN-OVER / CLOSE-OUT REQUIREMENTS:
34 SET ALL TIME CLOCKS, THERMOSTATS AND SIMILAR DEVICES TO THE CURRENT LOCAL TIME. PROVIDE A PRINTED LIST OF NAMES, ADDRESSES AND PHONE NUMBERS OF ALL
SUB-CONTRACTORS AND MATERIAL SUPPLIERS USED. ARRANGE FOR ALL INSPECTIONS AND FURNISH OWNER WITH CERTIFICATE OF OCCUPANCY.
35 SUBMIT OPERATION AND MAINTENANCE DATA TO INCLUDE EMERGENCY INSTRUCTIONS, SPARE PARTS LISTS, PRODUCT WARRANTIES, WIRING DIAGRAMS, INSPECTION PROCEDURES,
AND APPLICABLE SHOP DRAWINGS AND PRODUCT DATA.
GENERAL CONSTRUCTION NOTES
REV0 PERMIT SET
AREA
OF
WORK
COLLABORATIVE DESIGN ARCHITECTS
2280 GRANT ROAD - SUITE C, BILLINGS, MT 59102
T. 406.248.3443
SHEET INDEX
GENERAL SHEETS
BUILDING PLANS
DETAILS
SCHEDULES
INTERIOR ELEVATIONS
MECHANICAL SHEETS
PLUMBING SHEETS
ELECTRICAL SHEETS
FIRE PROTECTION SHEETS
G001
G002
G011
A101
A102
A103
A104
FS-1
A511
A601
A701
A702
A703
A704
A705
A706
A707
M001
M002
M101
M501
P001
P002
P101
P501
E001
E002
E003
E004
E005
E101
E201
F001
F002
F101
COVER SHEET
ACCESSIBILITY REQUIREMENTS
FIRE & LIFE SAFETY PLAN
EXISTING FLOOR PLAN
FLOOR PLAN
REFLECTED CEILING PLAN
FINISH FLOOR PLAN
EQUIPMENT PLAN
DETAILS
DOOR & HARDWARE SCHEDULES
INTERIOR ELEVATIONS
INTERIOR ELEVATIONS
INTERIOR ELEVATIONS
INTERIOR ELEVATIONS
INTERIOR ELEVATIONS
INTERIOR ELEVATIONS
INTERIOR ELEVATIONS
MECHANICAL COVER SHEET
MECHANICAL SPECIFICATIONS
MECHANICAL FLOOR PLAN
MECHANICAL DETAILS & SCHEDULES
PLUMBING COVER SHEET
PLUMBING SPECIFICATIONS
PLUMBING FLOOR PLAN
PLUMBING DETAILS & SCHEDULES
ELECTRICAL SYMBOLS AND ABBREVIATIONS
ELECTRICAL SPECIFICATIONS
ELECTRICAL SPECIFICATIONS
ELECTRICAL DETAILS
ELECTRICAL SCHEDULES
ELECTRICAL POWER AND SIGNAL PLAN
ELECTRICAL LIGHTING PLAN
FIRE PROTECTION COVER SHEET
FIRE PROTECTION DETAILS
FIRE PROTECTION REMODEL PLAN
2
G001
KEY PLAN
1
G001
CONCEPTUAL PERSPECTIVE RENDERING
3
G001
VICINITY MAP
PROJECT
LOCATION
CITY VINEYARD of BOZEMAN
2825 W. MAIN ST. BOZEMAN MT 59718
MORRISON MAIERLE
315 NORTH 25TH STREET, SUITE 102
T. 406.237.1262
T. 406.698.1143