Loading...
HomeMy WebLinkAbout030_A2.2BuildingElevations2FLOOR 10" FLOOR 216'-0" FLOOR 326'-8" FLOOR 437'-4" Roof Bearing48'-0" Parapet Top B55'-0" Parapet Top A52'-0" Parapet Top C59'-11 5/8" FLOOR 1D-1'-4"FLOOR 1E-1'-9" FLOOR 1C-8"60'-6"FLOOR 10" FLOOR 216'-0" FLOOR 326'-8" FLOOR 437'-4" Roof Bearing48'-0" Parapet Top B55'-0" Parapet Top A52'-0"55'-5"FLOOR 10" FLOOR 216'-0" FLOOR 326'-8" FLOOR 437'-4" Roof Bearing48'-0" Parapet Top B55'-0" Parapet Top A52'-0" FLOOR 1D-1'-4" FLOOR 1E-1'-9" FLOOR 1C-8" FLOOR 1B-4"57'-1 7/8"ARCHITECTURE 124 Floyd Smith DrSuite 375Charlotte, NC 28262 Tel: 704-688-7500 513A Savannah Hwy. Charleston, SC 29407Tel: 843-531-6848 www.R4architecture.com Revision Date Drawn By Checked By Issue Date Project No Sheet Title Sheet Number Project Owner ALL DESIGNS, DRAWINGS AND SPECIFICATIONS DEPICTED ON THIS SHEET ARE THE PROPERTY OF R IV ARCHITECTURE, P.A.. ANY UNAUTHORIZED USE OR REPRODUCTION IS SUBJECT TO LEGAL PROSECUTION. POSSESSION IN ANY FORM CONSTITUTES ACCEPTANCE OF THESE CONDITIONS. COPYRIGHT 2020A2.2 PROPOSED NORTH AND COURTYARD ELEVATIONS Hampton Inn & Suites Main StreetBozeman, MT Bennett Hospitality17 Lockwood DriveCharleston, SC 29401 CRF MJR 10/31/2023 220668 11/02/20 2 3 3/32" 1'-0"1NORTH ELEVATION - COURTYARD - 1/8" 3/32" 1'-0"2EAST COURTYARD ELEVATION - 1/8 3/32" 1'-0"3 WEST COURTYARD ELEVATION - 1/8"