Loading...
HomeMy WebLinkAbout023_SignedUtilityLettersYellowstoneFiber September 15,2023 Mr. Cody Flammond City of Bozeman—Engineering Division PO Box 1230 Bozeman,MT 59711 Reference: BOZ07022.01 Main Street Hotel Dear Mr. Flammond: This is a letter of written confirmation that Yellowstone Fiber does not need a utility easement located along the frontage of the property with a legal description of Tracy's 1'Add, Section 12, Township 02 East,Range 05 East,Block E,Lot 1-9,plus E2 Lot 10 and all lots 40-46 and Vacated Alley Adjacent to Lots 3-9 &Lots 40-46. The easements shown on the proposed site plans for Main Street Hotel designed by Sanderson Stewart will be sufficient for our services. Sincerely, P Illy- Greg Metzger Yellowstone Fiber Sid Boswell Yellowstone Fiber