HomeMy WebLinkAbout020_SignedUtilityLettersLumen September 18,2023
Mr.Cody Flammond
City of Bozeman—Engineering Division
PO Box 1230
Bozeman,MT 59711
Reference: BOZ07022.01 Main Street Hotel
Dear Mr. Flammond:
This is a letter of written confirmation that Lumen does not need a utility easement located along
the frontage of the property with a legal description of Tracy's 1"Add,Section 12,Township 02
South,Range 05 East,Block E,Lot 1-9,plus E2 Lot 10 and all lots 40-46 and Vacated Alley
Adjacent to Lots 3-9&Lots 40-46.The easements shown on the proposed site plans for Main I
Street Hotel designed by Sanderson Stewart will be sufficient for our services.
f
Sincerely,
Rob Hofstad
Network Implementation Engineer I1
Lumen