Loading...
HomeMy WebLinkAbout020_SignedUtilityLettersLumen September 18,2023 Mr.Cody Flammond City of Bozeman—Engineering Division PO Box 1230 Bozeman,MT 59711 Reference: BOZ07022.01 Main Street Hotel Dear Mr. Flammond: This is a letter of written confirmation that Lumen does not need a utility easement located along the frontage of the property with a legal description of Tracy's 1"Add,Section 12,Township 02 South,Range 05 East,Block E,Lot 1-9,plus E2 Lot 10 and all lots 40-46 and Vacated Alley Adjacent to Lots 3-9&Lots 40-46.The easements shown on the proposed site plans for Main I Street Hotel designed by Sanderson Stewart will be sufficient for our services. f Sincerely, Rob Hofstad Network Implementation Engineer I1 Lumen