HomeMy WebLinkAbout019_SignedUtilityLettersCharter September 15, 2023
Mr. Cody Hammond
City of Bozeman—Engineering Division
PO Box 1230
Bozeman, MT 59711
Reference: BOZ07022.01 Main Street Hotel
Dear Mr. Flammond:
This is a letter of written confirmation that Charter/Spectrum-does not need a utility easement
located along the frontage of the property with a legal description of Tracy's 1"Add, Section 12,
Township 02 East, Range 05 East,Block E,Lot 1-9,plus E2 Lot 10 and all lots 40-46 and Vacated
Alley Adjacent to Lots 3-9 &Lots 40-46. The easements shown on the proposed site plans for Main
Street Hotel designed by Sanderson Stewart will be sufficient for our services.
Sincerely,
Ed Luke
Charter/Spectrum