Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
12_W Babcock Apts_Traffic Memo_02072022
2304 N. 7TH AVENUE | SUITE L | BOZEMAN, MT 59715 | (406) 587-2781 Professional Consulting Engineers and Land Surveyors Equal Opportunity Employer | www.hyaliteeng.com February 7, 2022 City of Bozeman Engineering Alfred M. Stiff Professional Building PO Box 1230 Attn: Mikaela Schultz RE: West Babcock Apartments Major Subdivision Traffic Memorandum Bozeman, Gallatin County, Montana Dear Mikaela: Hyalite Engineers performed traffic counts for the intersection of 9th Avenue and W Babcock Street to assess the current conditions of a 2-way stop-controlled intersection compared to a proposed 4-way stop- controlled intersection. The purpose of this memorandum is to present the results of this comparison and to recommend improvements, if any are necessary. The traffic counts for the 9th Avenue and W Babcock Street intersection were developed through turning movement counts conducted during the weekday, AM (one hour between 7:00 and 9:00 a.m.), and PM (one hour between 4:00 and 6:00 p.m.) peak periods on Tuesday, February 1, 2022 and Wednesday, February 2, 2022. The counts were averaged for the two days observed. They are provided with this memorandum and are enclosed as Appendix A. A trip generation comparison was performed for this development and is enclosed as Appendix B. In this comparison, existing conditions were compared to what the proposed development would generate. There is a small increase in traffic due to this development and as a result the affects that this development will have on the intersection of 9th Avenue and W Babcock Street will be negligible. The larger affect to the intersection will be the increase of traffic over time. A growth rate of 2.0% was applied to the existing traffic over a three-year period. This growth rate was determined through traffic data from the Montana Department of Transportation. It is anticipated that the West Babcock Apartments will be under construction in 2022 and will be fully completed in three years. This gives the project a development horizon of 2025, which is the year that the analyses were performed for this intersection. Enclosed with this memorandum in Appendix C is a set of figures to display the traffic data and results of the analyses performed at the intersection of 9th Avenue and W Babcock Street. Below is a list of the figures enclosed: Figure 1: Site Location Figure 2: Subdivision Layout Figure 3: Existing Transportation System Figure 4: Current Daily Traffic Figure 5: Trip Distribution Figure 6: Traffic Assignment Figure 7: Estimated 2025 Background Traffic Figure 8: Estimated 2025 Total Traffic Figure 9: Traffic Operations Summary for 2022 Existing Conditions (2-Way Stop Control) Figure 10: Traffic Operations Summary for 2022 Existing Conditions (4-Way Stop Control) Figure 11: Traffic Operations Summary for 2025 Background Traffic (2-Way Stop Control) Figure 12: Traffic Operations Summary for 2025 Background Traffic (4-Way Stop Control) Figure 13: Traffic Operations Summary for 2025 Total Traffic (2-Way Stop Control) Figure 14: Traffic Operations Summary for 2025 Total Traffic (4-Way Stop Control) The capacity and level of service analyses for the West Babcock Apartments Major Subdivision are provided in Appendix D. The level of service for the intersection was analyzed at the existing traffic volumes as well as the volumes anticipated at the development horizon of 2025, for both a 2-way stop control and a 4-way stop control intersection. Below is a table displaying the results of the performed analyses: Stop Control Year Time Analyzed Time Period Movement LOS Total Intersection Delay 2-Way 2022 Existing AM NB/SB/WB/EB B/A/A/A 2.1 2-Way 2022 Existing PM NB/SB/WB/EB A/B/A/A 3.8 4-Way 2022 Existing AM NB/SB/WB/EB A/A/A/A 7.8 4-Way 2022 Existing PM NB/SB/WB/EB A/A/A/A 7.6 2-Way 2025 Background AM NB/SB/WB/EB B/B/A/A 2.2 2-Way 2025 Background PM NB/SB/WB/EB A/B/A/A 3.9 4-Way 2025 Background AM NB/SB/WB/EB A/A/A/A 7.8 4-Way 2025 Background PM NB/SB/WB/EB A/A/A/A 7.7 2-Way 2025 Total AM NB/SB/WB/EB B/B/A/A 2.3 2-Way 2025 Total PM NB/SB/WB/EB A/B/A/A 4 4-Way 2025 Total AM NB/SB/WB/EB A/A/A/A 7.9 4-Way 2025 Total PM NB/SB/WB/EB A/A/A/A 7.7 Traffic Operations Summary for the Intersection of 9th Avenue & W Babcock Street The intersection of 9th Avenue and W Babcock Street should remain a 2-way stop controlled intersection. The total intersection delay at all the scenarios analyzed showed a lower delay at the intersection for a 2- way stop control, when compared to the intersection delay for the 4-way stop control. Some individual directional movements do improve when 4-way stop control is implemented; however, the intersection as a whole would operate at a worse condition. The level of service (LOS) for all movements operated at an A or B, which means that the intersection is operating well within acceptable limits and is moving traffic with minimal delays. Let me know if you have any questions regarding this traffic memorandum, or if anything else needs to be provided or clarified. Please give me a call or send an email to bmegaard@hyaliteeng.com with any questions. Sincerely, Brett Megaard, P.E. Project Manager Enclosed: Appendix A: TRAFFIC COUNT DATA Appendix B: TRIP GENERATION COMPARISON Appendix C: TRAFFIC FIGURES Appendix D: CAPACITY & LEVEL OF SERVICE ANALYSES W E S T B A B C O C K A P A R T M E N T S M A J O R S U B D I V I S I O N F E B R U A R Y 2 0 2 2 A P P E N D I X APPENDIX A TRAFFIC COUNT DATA Hyalite Engineers, PLLC Count Location: 2304 N 7th Ave. Suite L Count Date: Bozeman, Montana 59715 Count Time Period: P: 4065872781 Peak Hour Factor:0.80 Factor 1.000 1.000 1.000 1.000 1.000 Approach 1.000 1.000 1.000 1.000 1.000 Approach 1.000 1.000 1.000 1.000 1.000 Approach 1.000 1.000 1.000 1.000 1.000 Approach Intersection Start Time U-Turn Left Thru Right Ped/Bike Total U-Turn Left Thru Right Ped/Bike Total U-Turn Left Thru Right Ped/Bike Total U-Turn Left Thru Right Ped/Bike Total Total 7:45 AM 0 1 42 0 1 44 0 2 3 2 2 9 0 2 2 1 2 7 0 1 3 1 0 5 65 8:00 AM 0 0 32 1 0 33 0 1 3 1 2 7 0 1 2 1 4 8 0 2 1 1 1 5 53 8:15 AM 0 2 24 1 1 28 0 0 2 1 1 4 0 1 2 0 2 5 0 2 1 1 1 5 42 8:30 AM 0 0 30 1 1 32 0 0 2 2 0 4 0 1 1 0 2 4 0 5 2 1 1 9 49 Total 0 3 128 3 3 137 0 3 10 6 5 24 0 5 7 2 10 24 0 10 7 4 3 24 209 Apprch % 0.0% 2.2% 93.4% 2.2% 2.2% 0.0% 12.5% 41.7% 25.0% 20.8% 0.0% 20.8% 29.2% 8.3% 41.7% 0.0% 41.7% 29.2% 16.7% 12.5% Total % 0.0% 1.4% 61.2% 1.4% 1.4% 65.6% 0.0% 1.4% 4.8% 2.9% 2.4% 11.5% 0.0% 2.4% 3.3% 1.0% 4.8% 11.5% 0.0% 4.8% 3.3% 1.9% 1.4% 11.5% Heavy % 0.0% 0.0% 1.4% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0%0.0% 0.0% 0.0% 0.0% 0.0% 1.1% Out 16 Right Thru Left U-Turn 4 7 10 0 U-Turn 0 6 Right Left 3 10 Thru Thru 128 3 Left Right 3 0 U-Turn 0 5 7 2 U-Turn Left Thru Right 13 Out Count Location: Count Date: Count Time Period: Peak Hour Factor:0.98 Factor 1.000 1.000 1.000 1.000 1.000 Approach 1.000 1.000 1.000 1.000 1.000 Approach 1.000 1.000 1.000 1.000 1.000 Approach 1.000 1.000 1.000 1.000 1.000 Approach Intersection Start Time U-Turn Left Thru Right Ped/Bike Total U-Turn Left Thru Right Ped/Bike Total U-Turn Left Thru Right Ped/Bike Total U-Turn Left Thru Right Ped/Bike Total Total 5:00 PM 0 1 26 0 4 31 0 0 3 4 2 9 0 1 2 3 2 8 0 10 3 3 5 21 69 5:15 PM 0 5 27 1 0 33 0 0 2 7 3 12 0 2 2 2 2 8 0 10 3 2 1 16 69 5:30 PM 0 1 26 0 1 28 0 0 6 6 1 13 0 1 1 2 2 6 0 9 3 5 5 22 69 5:45 PM 0 2 30 1 1 34 0 2 3 3 1 9 0 0 4 1 1 6 0 8 3 3 1 15 64 Total 0 9 109 2 6 126 0 2 14 20 7 43 0 4 9 8 7 28 0 37 12 13 12 74 271 Apprch % 0.0% 7.1% 86.5% 1.6% 4.8% 0.0% 4.7% 32.6% 46.5% 16.3% 0.0% 14.3% 32.1% 28.6% 25.0% 0.0% 50.0% 16.2% 17.6% 16.2% Total % 0.0% 3.3% 40.2% 0.7% 2.2% 46.5% 0.0% 0.7% 5.2% 7.4% 2.6% 15.9% 0.0% 1.5% 3.3% 3.0% 2.6% 10.3% 0.0% 13.7% 4.4% 4.8% 4.4% 27.3% Heavy % 0.0% 0.0% 0.7% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0%0.0% 0.0% 0.0% 0.0% 1.7% 0.7% Out 38 Right Thru Left U-Turn 13 12 37 0 U-Turn 0 20 Right Left 9 14 Thru Thru 109 2 Left Right 2 0 U-Turn 0 4 9 8 U-Turn Left Thru Right 16 Out 9th Avenue & W Babcock Street Tuesday, February 1 & Wednesday, February 2 Weekday, AM Peak Period Groups Printed - Cars, Trucks, Bank3, & Bank4 W Babcock Street W Babcock Street 9th Avenue 9th Avenue Eastbound Westbound Northbound Southbound 21 In W Babcock StreetW Babcock Street9th Avenue 134In Out 19 19 In 140 14 In Eastbound Westbound Out TOTAL ENTERING VEHICLES 188 9th Avenue & W Babcock Street Tuesday, February 1 & Wednesday, February 2 Northbound Southbound 9th Avenue Groups Printed - Cars, Trucks, Bank3, & Bank4 W Babcock Street W Babcock Street 9th Avenue 9th Avenue Weekday, PM Peak Period 9th Avenue W Babcock StreetIn W Babcock Street62 Out 31 154 Out TOTAL ENTERING VEHICLES In 9th Avenue In 120 36 In239 21 W E S T B A B C O C K A P A R T M E N T S M A J O R S U B D I V I S I O N F E B R U A R Y 2 0 2 2 A P P E N D I X APPENDIX B TRIP GENERATION COMPARISON ITE Quantity In Out Total In Out Total In Out LUC Land Use 28%72%70%30%50%50% 231 Mid-Rise Resdiential w/ Commercial 46 4 10 14 12 5 17 80 80 160 Rate:Rate:Rate: TOTALS:46 4 10 14 12 5 17 80 80 160 ITE Quantity In Out Total In Out Total In Out LUC Land Use 78%22%28%72%50%50% 720 Medical-Dental Office Building 3 3 6 9 8 3 11 53 53 106 Rate: Rate: Rate: TOTALS:3 3 6 9 8 3 11 53 53 106 ITE Quantity In Out Total In Out Total In Out LUC Land Use 25%75%63%37%50%50% 210 Single-Family Detached Housing 2 1 1 2 1 1 2 10 10 20 Rate: Rate: Rate: TOTALS:2 1 1 2 1 1 2 10 10 20 Proposed Trips Generated:4 10 14 12 5 17 80 80 160 Existing Trips Generated:4 7 11 9 4 13 63 63 126 Increase in Trips Generated:0 3 3 3 1 4 17 17 34 Existing Trip Generation Estimate - Signle-Family Detached Housing Weekday Morning Peak Hour Weekday Evening Peak Hour Daily Trips 0.74 / UNIT 0.99 / UNIT 9.44 / UNIT 0.30 / UNIT 0.36 / UNIT 3.44 / UNIT West Babcock Apartments Major Subdivision Trip Generatin Comparison Proposed Trip Generation Estimate - Mid-Rise Residential with 1st-Floor Commercial Weekday Morning Peak Hour Weekday Evening Peak Hour Daily Trips Existing Trip Generation Estimate - Medical-Dental Office Building Weekday Morning Peak Hour Weekday Evening Peak Hour Daily Trips 2.78 / 1K SF GFA 3.46 / 1K SF GFA 34.80 / 1K SF GFA W E S T B A B C O C K A P A R T M E N T S M A J O R S U B D I V I S I O N F E B R U A R Y 2 0 2 2 A P P E N D I X APPENDIX C TRAFFIC FIGURES M:\213611\Traffic Impact Study\TIS Figures.dwgSITE LOCATION FIGURE 1 JOB NUMBER : SHEET : SCALE :1" = 400' 1 OF 10400'800' DATE : W E B : w w w . h y a l i t e e n g . c o m 2304 NORTH 7TH AVENUE STE. L B O Z E M A N , M T 5 9 7 1 8 P H O N E : ( 4 0 6) 5 8 7 - 2 7 8 1 F A X : ( 4 0 6 ) 5 2 2 - 9 2 2 5 PROJECT LOCATION FEB 2022 213611 WEST BABCOCK APARTMENTS MAJOR SUBDIVISION W BABCOCK ST MAIN ST 9TH AVEW OLIVE ST 8TH AVE10TH AVE M:\213611\Traffic Impact Study\TIS Figures.dwgSUBDIVISION LAYOUT FIGURE 2 JOB NUMBER : SHEET : SCALE :NTS 1 OF 1 DATE : W E B : w w w . h y a l i t e e n g . c o m 2304 NORTH 7TH AVENUE STE. L B O Z E M A N , M T 5 9 7 1 8 P H O N E : ( 4 0 6) 5 8 7 - 2 7 8 1 F A X : ( 4 0 6 ) 5 2 2 - 9 2 2 5 FEB 2022 213611 WEST BABCOCK APARTMENTS MAJOR SUBDIVISION M:\213611\Traffic Impact Study\TIS Figures.dwgEXISTING TRANSPORTATION SYSTEM FIGURE 3 JOB NUMBER : SHEET : SCALE :1" = 200' 1 OF 10200'400' DATE : W E B : w w w . h y a l i t e e n g . c o m 2304 NORTH 7TH AVENUE STE. L B O Z E M A N , M T 5 9 7 1 8 P H O N E : ( 4 0 6) 5 8 7 - 2 7 8 1 F A X : ( 4 0 6 ) 5 2 2 - 9 2 2 5 LEGEND STOP SIGN TRAFFIC LANE CONFIGURATION TRAFFIC SIGNAL CONTROLLED INTERSECTION PROJECT LOCATION W BABCOCK ST MAIN ST 9TH AVEW OLIVE ST 8TH AVE10TH AVEFEB 2022 213611 WEST BABCOCK APARTMENTS MAJOR SUBDIVISION M:\213611\Traffic Impact Study\TIS Figures.dwgCURRENT DAILY TRAFFIC FIGURE 4 JOB NUMBER : SHEET : SCALE : 1 OF 10 DATE : W E B : w w w . h y a l i t e e n g . c o m 2304 NORTH 7TH AVENUE STE. L B O Z E M A N , M T 5 9 7 1 8 P H O N E : ( 4 0 6) 5 8 7 - 2 7 8 1 F A X : ( 4 0 6 ) 5 2 2 - 9 2 2 5 LEGEND WEEKDAY AM PEAK HOUR WEEKDAY PM PEAK HOUR(XX) XX XXX TURNING MOVEMENTS ESTIMATED AVG WEEKDAY TRAFFIC 1" = 200' FEB 2022 213611 WEST BABCOCK APARTMENTS MAJOR SUBDIVISION PROJECT LOCATION W BABCOCK ST MAIN ST 9TH AVEW OLIVE ST8TH AVE10TH AVE5 (4) 7 (9) 2 (8) 6 (20) 10 (14) 3 (2) 3(9) 128(109) 3(2) (13)(12)(37) 4 7 10 1,0004001,500 1,900 200'400' M:\213611\Traffic Impact Study\TIS Figures.dwgTRIP DISTRIBUTION FIGURE 5 JOB NUMBER : SHEET : SCALE : 1 OF 10 DATE : W E B : w w w . h y a l i t e e n g . c o m 2304 NORTH 7TH AVENUE STE. L B O Z E M A N , M T 5 9 7 1 8 P H O N E : ( 4 0 6) 5 8 7 - 2 7 8 1 F A X : ( 4 0 6 ) 5 2 2 - 9 2 2 5 LEGEND TRIP DISTRIBUTION PERCENTAGEXX% 1" = 200' FEB 2022 213611 WEST BABCOCK APARTMENTS MAJOR SUBDIVISION PROJECT LOCATION W BABCOCK ST MAIN ST 9TH AVEW OLIVE ST8TH AVE10TH AVE50%25%15% 15% 50% 25%25%10%50%15% 200'400' M:\213611\Traffic Impact Study\TIS Figures.dwgTRAFFIC ASSIGNMENT FIGURE 6 JOB NUMBER : SHEET : SCALE : 1 OF 10 DATE : W E B : w w w . h y a l i t e e n g . c o m 2304 NORTH 7TH AVENUE STE. L B O Z E M A N , M T 5 9 7 1 8 P H O N E : ( 4 0 6) 5 8 7 - 2 7 8 1 F A X : ( 4 0 6 ) 5 2 2 - 9 2 2 5 1" = 200' FEB 2022 213611 WEST BABCOCK APARTMENTS MAJOR SUBDIVISION LEGEND WEEKDAY AM PEAK HOUR WEEKDAY PM PEAK HOUR(XX) XX XXX TURNING MOVEMENTS ESTIMATED AVG WEEKDAY TRAFFIC PROJECT LOCATION W BABCOCK ST MAIN ST 9TH AVEW OLIVE ST8TH AVE10TH AVE1 (1) 1 (0) 1 (0) 0 (1) 0(1) (1) 0 104010 10 200'400' M:\213611\Traffic Impact Study\TIS Figures.dwgESTIMATED 2025 BACKGROUND TRAFFIC FIGURE 7 JOB NUMBER : SHEET : SCALE : 1 OF 10 DATE : W E B : w w w . h y a l i t e e n g . c o m 2304 NORTH 7TH AVENUE STE. L B O Z E M A N , M T 5 9 7 1 8 P H O N E : ( 4 0 6) 5 8 7 - 2 7 8 1 F A X : ( 4 0 6 ) 5 2 2 - 9 2 2 5 1" = 200' FEB 2022 213611 WEST BABCOCK APARTMENTS MAJOR SUBDIVISION 200'400' LEGEND WEEKDAY AM PEAK HOUR WEEKDAY PM PEAK HOUR(XX) XX XXX TURNING MOVEMENTS ESTIMATED AVG WEEKDAY TRAFFIC PROJECT LOCATION W BABCOCK ST MAIN ST 9TH AVEW OLIVE ST8TH AVE10TH AVE5 (4) 8 (10) 2 (9) 7 (21) 11 (15) 3 (2) 3(10) 136(116) 3(2) (14)(13)(39) 4 8 11 1,1004001,600 2,000 M:\213611\Traffic Impact Study\TIS Figures.dwgESTIMATED 2025 TOTAL TRAFFIC FIGURE 8 JOB NUMBER : SHEET : SCALE : 1 OF 10 DATE : W E B : w w w . h y a l i t e e n g . c o m 2304 NORTH 7TH AVENUE STE. L B O Z E M A N , M T 5 9 7 1 8 P H O N E : ( 4 0 6) 5 8 7 - 2 7 8 1 F A X : ( 4 0 6 ) 5 2 2 - 9 2 2 5 200'400' LEGEND WEEKDAY AM PEAK HOUR WEEKDAY PM PEAK HOUR(XX) XX XXX TURNING MOVEMENTS ESTIMATED AVG WEEKDAY TRAFFIC PROJECT LOCATION W BABCOCK ST MAIN ST 9TH AVEW OLIVE ST8TH AVE10TH AVE6 (5) 9 (10) 3 (9) 7 (21) 11 (15) 3 (3) 3(10) 136(116) 3(3) (14)(14)(39) 4 8 11 1,1104401,610 2,010 1" = 200' FEB 2022 213611 WEST BABCOCK APARTMENTS MAJOR SUBDIVISION M:\213611\Traffic Impact Study\TIS Figures.dwgTRAFFIC OPERATIONS SUMMARY FOR 2022 EXISTING CONDITIONS (2-WAY STOP CONTROL) FIGURE 9 JOB NUMBER : SHEET : SCALE : 1 OF 10 DATE : W E B : w w w . h y a l i t e e n g . c o m 2304 NORTH 7TH AVENUE STE. L B O Z E M A N , M T 5 9 7 1 8 P H O N E : ( 4 0 6) 5 8 7 - 2 7 8 1 F A X : ( 4 0 6 ) 5 2 2 - 9 2 2 5 LEGEND WEEKDAY AM PEAK HOUR APPROACH LOS WEEKDAY PM PEAK HOUR APPROACH LOS A A 200'400' 1" = 200' FEB 2022 213611 WEST BABCOCK APARTMENTS MAJOR SUBDIVISION PROJECT LOCATION W BABCOCK ST MAIN ST 9TH AVEW OLIVE ST8TH AVE10TH AVEA AAA B A A B M:\213611\Traffic Impact Study\TIS Figures.dwgTRAFFIC OPERATIONS SUMMARY FOR 2022 EXISTING CONDITIONS (4-WAY STOP CONTROL) FIGURE 10 JOB NUMBER : SHEET : SCALE : 1 OF 10 DATE : W E B : w w w . h y a l i t e e n g . c o m 2304 NORTH 7TH AVENUE STE. L B O Z E M A N , M T 5 9 7 1 8 P H O N E : ( 4 0 6) 5 8 7 - 2 7 8 1 F A X : ( 4 0 6 ) 5 2 2 - 9 2 2 5 LEGEND WEEKDAY AM PEAK HOUR APPROACH LOS WEEKDAY PM PEAK HOUR APPROACH LOS A A 200'400' 1" = 200' FEB 2022 213611 WEST BABCOCK APARTMENTS MAJOR SUBDIVISION PROJECT LOCATION W BABCOCK ST MAIN ST 9TH AVEW OLIVE ST8TH AVE10TH AVEA AAA A A A A M:\213611\Traffic Impact Study\TIS Figures.dwgTRAFFIC OPERATIONS SUMMARY FOR 2025 BACKGROUND TRAFFIC (2-WAY STOP CONTROL) FIGURE 11 JOB NUMBER : SHEET : SCALE : 1 OF 10 DATE : W E B : w w w . h y a l i t e e n g . c o m 2304 NORTH 7TH AVENUE STE. L B O Z E M A N , M T 5 9 7 1 8 P H O N E : ( 4 0 6) 5 8 7 - 2 7 8 1 F A X : ( 4 0 6 ) 5 2 2 - 9 2 2 5 200'400' 1" = 200' FEB 2022 213611 WEST BABCOCK APARTMENTS MAJOR SUBDIVISION LEGEND WEEKDAY AM PEAK HOUR APPROACH LOS WEEKDAY PM PEAK HOUR APPROACH LOS A A PROJECT LOCATION W BABCOCK ST MAIN ST 9TH AVEW OLIVE ST8TH AVE10TH AVEA AAA B A B B M:\213611\Traffic Impact Study\TIS Figures.dwgTRAFFIC OPERATIONS SUMMARY FOR 2025 BACKGROUND TRAFFIC (4-WAY STOP CONTROL) FIGURE 12 JOB NUMBER : SHEET : SCALE : 1 OF 10 DATE : W E B : w w w . h y a l i t e e n g . c o m 2304 NORTH 7TH AVENUE STE. L B O Z E M A N , M T 5 9 7 1 8 P H O N E : ( 4 0 6) 5 8 7 - 2 7 8 1 F A X : ( 4 0 6 ) 5 2 2 - 9 2 2 5 200'400' 1" = 200' FEB 2022 213611 WEST BABCOCK APARTMENTS MAJOR SUBDIVISION LEGEND WEEKDAY AM PEAK HOUR APPROACH LOS WEEKDAY PM PEAK HOUR APPROACH LOS A A PROJECT LOCATION W BABCOCK ST MAIN ST 9TH AVEW OLIVE ST8TH AVE10TH AVEA AAA A A A A M:\213611\Traffic Impact Study\TIS Figures.dwgTRAFFIC OPERATIONS SUMMARY FOR 2025 TOTAL TRAFFIC (2-WAY STOP CONTROL) FIGURE 13 JOB NUMBER : SHEET : SCALE : 1 OF 10 DATE : W E B : w w w . h y a l i t e e n g . c o m 2304 NORTH 7TH AVENUE STE. L B O Z E M A N , M T 5 9 7 1 8 P H O N E : ( 4 0 6) 5 8 7 - 2 7 8 1 F A X : ( 4 0 6 ) 5 2 2 - 9 2 2 5 200'400' 1" = 200' FEB 2022 213611 WEST BABCOCK APARTMENTS MAJOR SUBDIVISION LEGEND WEEKDAY AM PEAK HOUR APPROACH LOS WEEKDAY PM PEAK HOUR APPROACH LOS A A PROJECT LOCATION W BABCOCK ST MAIN ST 9TH AVEW OLIVE ST8TH AVE10TH AVEA AAA B A B B M:\213611\Traffic Impact Study\TIS Figures.dwgTRAFFIC OPERATIONS SUMMARY FOR 2025 TOTAL TRAFFIC (4-WAY STOP CONTROL) FIGURE 14 JOB NUMBER : SHEET : SCALE : 1 OF 10 DATE : W E B : w w w . h y a l i t e e n g . c o m 2304 NORTH 7TH AVENUE STE. L B O Z E M A N , M T 5 9 7 1 8 P H O N E : ( 4 0 6) 5 8 7 - 2 7 8 1 F A X : ( 4 0 6 ) 5 2 2 - 9 2 2 5 200'400' 1" = 200' FEB 2022 213611 WEST BABCOCK APARTMENTS MAJOR SUBDIVISION LEGEND WEEKDAY AM PEAK HOUR APPROACH LOS WEEKDAY PM PEAK HOUR APPROACH LOS A A PROJECT LOCATION W BABCOCK ST MAIN ST 9TH AVEW OLIVE ST8TH AVE10TH AVEA AAA A A A A W E S T B A B C O C K A P A R T M E N T S M A J O R S U B D I V I S I O N F E B R U A R Y 2 0 2 2 A P P E N D I X APPENDIX D CACACITY & LEVEL OF SERVICE ANALYSES HCS7 Two-Way Stop-Control Report General Information Site Information Analyst Cody Kerkaert Intersection 9th Ave & W Babcock St Agency/Co.Jurisdiction Date Performed 1/28/2022 East/West Street Babcock Street Analysis Year 2022 North/South Street 9th Avenue Time Analyzed Existing AM Peak Hour Factor 0.80 Intersection Orientation East-West Analysis Time Period (hrs)0.25 Project Description West Babcock Apartments Major Subdivision Lanes Major Street: East-West Vehicle Volumes and Adjustments Approach Eastbound Westbound Northbound Southbound Movement U L T R U L T R U L T R U L T R Priority 1U 1 2 3 4U 4 5 6 7 8 9 10 11 12 Number of Lanes 0 0 1 0 0 0 1 0 0 1 0 0 1 0 Configuration LTR LTR LTR LTR Volume (veh/h)3 128 3 3 10 6 5 7 2 10 7 4 Percent Heavy Vehicles (%)1 1 1 1 1 1 1 1 Proportion Time Blocked Percent Grade (%)0 0 Right Turn Channelized Median Type | Storage Undivided Critical and Follow-up Headways Base Critical Headway (sec)4.1 4.1 7.1 6.5 6.2 7.1 6.5 6.2 Critical Headway (sec)4.11 4.11 7.11 6.51 6.21 7.11 6.51 6.21 Base Follow-Up Headway (sec)2.2 2.2 3.5 4.0 3.3 3.5 4.0 3.3 Follow-Up Headway (sec)2.21 2.21 3.51 4.01 3.31 3.51 4.01 3.31 Delay, Queue Length, and Level of Service Flow Rate, v (veh/h)4 4 18 26 Capacity, c (veh/h)1594 1396 715 757 v/c Ratio 0.00 0.00 0.02 0.03 95% Queue Length, Q₉₅ (veh)0.0 0.0 0.1 0.1 Control Delay (s/veh)7.3 7.6 10.2 9.9 Level of Service (LOS)A A B A Approach Delay (s/veh)0.2 1.2 10.2 9.9 Approach LOS B A Copyright © 2022 University of Florida. All Rights Reserved. HCS™TWSC Version 7.9 Generated: 2/4/2022 1:13:23 PM Int Ex AM 2-way.xtw HCS7 Two-Way Stop-Control Report General Information Site Information Analyst Cody Kerkaert Intersection 9th Ave & W Babcock St Agency/Co.Jurisdiction Date Performed 1/28/2022 East/West Street Babcock Street Analysis Year 2022 North/South Street 9th Avenue Time Analyzed Existing PM Peak Hour Factor 0.98 Intersection Orientation East-West Analysis Time Period (hrs)0.25 Project Description West Babcock Apartments Major Subdivision Lanes Major Street: East-West Vehicle Volumes and Adjustments Approach Eastbound Westbound Northbound Southbound Movement U L T R U L T R U L T R U L T R Priority 1U 1 2 3 4U 4 5 6 7 8 9 10 11 12 Number of Lanes 0 0 1 0 0 0 1 0 0 1 0 0 1 0 Configuration LTR LTR LTR LTR Volume (veh/h)9 109 2 2 14 20 4 9 8 37 12 13 Percent Heavy Vehicles (%)1 1 1 1 1 1 1 1 Proportion Time Blocked Percent Grade (%)0 0 Right Turn Channelized Median Type | Storage Undivided Critical and Follow-up Headways Base Critical Headway (sec)4.1 4.1 7.1 6.5 6.2 7.1 6.5 6.2 Critical Headway (sec)4.11 4.11 7.11 6.51 6.21 7.11 6.51 6.21 Base Follow-Up Headway (sec)2.2 2.2 3.5 4.0 3.3 3.5 4.0 3.3 Follow-Up Headway (sec)2.21 2.21 3.51 4.01 3.31 3.51 4.01 3.31 Delay, Queue Length, and Level of Service Flow Rate, v (veh/h)9 2 21 63 Capacity, c (veh/h)1549 1464 773 777 v/c Ratio 0.01 0.00 0.03 0.08 95% Queue Length, Q₉₅ (veh)0.0 0.0 0.1 0.3 Control Delay (s/veh)7.3 7.5 9.8 10.0 Level of Service (LOS)A A A B Approach Delay (s/veh)0.6 0.4 9.8 10.0 Approach LOS A B Copyright © 2022 University of Florida. All Rights Reserved. HCS™TWSC Version 7.9 Generated: 2/4/2022 1:13:55 PM Int Ex PM 2-way.xtw HCS7 All-Way Stop Control Report General Information Site Information Analyst Cody Kerkaert Intersection 9th Ave & W Babcock St Agency/Co.Jurisdiction Date Performed 1/28/2022 East/West Street W Babcock Street Analysis Year 2022 North/South Street 9th AVenue Analysis Time Period (hrs)0.25 Peak Hour Factor 0.80 Time Analyzed Existing AM Project Description West Babcock Apartments Major Subdivision Lanes Vehicle Volume and Adjustments Approach Eastbound Westbound Northbound Southbound Movement L T R L T R L T R L T R Volume 3 128 3 3 10 6 5 7 2 10 7 4 % Thrus in Shared Lane Lane L1 L2 L3 L1 L2 L3 L1 L2 L3 L1 L2 L3 Configuration LTR LTR LTR LTR Flow Rate, v (veh/h)168 24 18 26 Percent Heavy Vehicles 1 1 1 1 Departure Headway and Service Time Initial Departure Headway, hd (s)3.20 3.20 3.20 3.20 Initial Degree of Utilization, x 0.149 0.021 0.016 0.023 Final Departure Headway, hd (s)4.03 4.02 4.34 4.32 Final Degree of Utilization, x 0.187 0.026 0.021 0.032 Move-Up Time, m (s)2.0 2.0 2.0 2.0 Service Time, ts (s)2.03 2.02 2.34 2.32 Capacity, Delay and Level of Service Flow Rate, v (veh/h)168 24 18 26 Capacity 893 896 830 832 95% Queue Length, Q₉₅ (veh)0.7 0.1 0.1 0.1 Control Delay (s/veh)8.0 7.1 7.4 7.5 Level of Service, LOS A A A A Approach Delay (s/veh)8.0 7.1 7.4 7.5 Approach LOS A A A A Intersection Delay, s/veh | LOS 7.8 A Copyright © 2022 University of Florida. All Rights Reserved.HCS™AWSC Version 7.9 Generated: 2/4/2022 1:16:19 PMInt Ex AM 4-way.xaw HCS7 All-Way Stop Control Report General Information Site Information Analyst Cody Kerkaert Intersection 9th Ave & W Babcock St Agency/Co.Jurisdiction Date Performed 1/28/2022 East/West Street W Babcock Street Analysis Year 2022 North/South Street 9th AVenue Analysis Time Period (hrs)0.25 Peak Hour Factor 0.98 Time Analyzed Existing PM Project Description West Babcock Apartments Major Subdivision Lanes Vehicle Volume and Adjustments Approach Eastbound Westbound Northbound Southbound Movement L T R L T R L T R L T R Volume 9 109 2 2 14 20 4 9 8 37 12 13 % Thrus in Shared Lane Lane L1 L2 L3 L1 L2 L3 L1 L2 L3 L1 L2 L3 Configuration LTR LTR LTR LTR Flow Rate, v (veh/h)122 37 21 63 Percent Heavy Vehicles 1 1 1 1 Departure Headway and Service Time Initial Departure Headway, hd (s)3.20 3.20 3.20 3.20 Initial Degree of Utilization, x 0.109 0.033 0.019 0.056 Final Departure Headway, hd (s)4.14 3.90 4.13 4.27 Final Degree of Utilization, x 0.141 0.040 0.025 0.075 Move-Up Time, m (s)2.0 2.0 2.0 2.0 Service Time, ts (s)2.14 1.90 2.13 2.27 Capacity, Delay and Level of Service Flow Rate, v (veh/h)122 37 21 63 Capacity 869 922 871 842 95% Queue Length, Q₉₅ (veh)0.5 0.1 0.1 0.2 Control Delay (s/veh)7.8 7.1 7.2 7.6 Level of Service, LOS A A A A Approach Delay (s/veh)7.8 7.1 7.2 7.6 Approach LOS A A A A Intersection Delay, s/veh | LOS 7.6 A Copyright © 2022 University of Florida. All Rights Reserved.HCS™AWSC Version 7.9 Generated: 2/4/2022 1:16:51 PMInt Ex PM 4-way.xaw HCS7 Two-Way Stop-Control Report General Information Site Information Analyst Cody Kerkaert Intersection 9th Ave & W Babcock St Agency/Co.Jurisdiction Date Performed 1/28/2022 East/West Street Babcock Street Analysis Year 2025 North/South Street 9th Avenue Time Analyzed Background AM Peak Hour Factor 0.80 Intersection Orientation East-West Analysis Time Period (hrs)0.25 Project Description West Babcock Apartments Major Subdivision Lanes Major Street: East-West Vehicle Volumes and Adjustments Approach Eastbound Westbound Northbound Southbound Movement U L T R U L T R U L T R U L T R Priority 1U 1 2 3 4U 4 5 6 7 8 9 10 11 12 Number of Lanes 0 0 1 0 0 0 1 0 0 1 0 0 1 0 Configuration LTR LTR LTR LTR Volume (veh/h)3 136 3 3 11 7 5 8 2 11 8 4 Percent Heavy Vehicles (%)1 1 1 1 1 1 1 1 Proportion Time Blocked Percent Grade (%)0 0 Right Turn Channelized Median Type | Storage Undivided Critical and Follow-up Headways Base Critical Headway (sec)4.1 4.1 7.1 6.5 6.2 7.1 6.5 6.2 Critical Headway (sec)4.11 4.11 7.11 6.51 6.21 7.11 6.51 6.21 Base Follow-Up Headway (sec)2.2 2.2 3.5 4.0 3.3 3.5 4.0 3.3 Follow-Up Headway (sec)2.21 2.21 3.51 4.01 3.31 3.51 4.01 3.31 Delay, Queue Length, and Level of Service Flow Rate, v (veh/h)4 4 19 29 Capacity, c (veh/h)1591 1384 700 740 v/c Ratio 0.00 0.00 0.03 0.04 95% Queue Length, Q₉₅ (veh)0.0 0.0 0.1 0.1 Control Delay (s/veh)7.3 7.6 10.3 10.1 Level of Service (LOS)A A B B Approach Delay (s/veh)0.2 1.1 10.3 10.1 Approach LOS B B Copyright © 2022 University of Florida. All Rights Reserved. HCS™TWSC Version 7.9 Generated: 2/4/2022 1:12:00 PM Int Bk AM 2-way.xtw HCS7 Two-Way Stop-Control Report General Information Site Information Analyst Cody Kerkaert Intersection 9th Ave & W Babcock St Agency/Co.Jurisdiction Date Performed 1/28/2022 East/West Street Babcock Street Analysis Year 2025 North/South Street 9th Avenue Time Analyzed Background PM Peak Hour Factor 0.98 Intersection Orientation East-West Analysis Time Period (hrs)0.25 Project Description West Babcock Apartments Major Subdivision Lanes Major Street: East-West Vehicle Volumes and Adjustments Approach Eastbound Westbound Northbound Southbound Movement U L T R U L T R U L T R U L T R Priority 1U 1 2 3 4U 4 5 6 7 8 9 10 11 12 Number of Lanes 0 0 1 0 0 0 1 0 0 1 0 0 1 0 Configuration LTR LTR LTR LTR Volume (veh/h)10 116 2 2 15 21 4 10 9 39 13 14 Percent Heavy Vehicles (%)1 1 1 1 1 1 1 1 Proportion Time Blocked Percent Grade (%)0 0 Right Turn Channelized Median Type | Storage Undivided Critical and Follow-up Headways Base Critical Headway (sec)4.1 4.1 7.1 6.5 6.2 7.1 6.5 6.2 Critical Headway (sec)4.11 4.11 7.11 6.51 6.21 7.11 6.51 6.21 Base Follow-Up Headway (sec)2.2 2.2 3.5 4.0 3.3 3.5 4.0 3.3 Follow-Up Headway (sec)2.21 2.21 3.51 4.01 3.31 3.51 4.01 3.31 Delay, Queue Length, and Level of Service Flow Rate, v (veh/h)10 2 23 67 Capacity, c (veh/h)1547 1455 763 765 v/c Ratio 0.01 0.00 0.03 0.09 95% Queue Length, Q₉₅ (veh)0.0 0.0 0.1 0.3 Control Delay (s/veh)7.3 7.5 9.9 10.2 Level of Service (LOS)A A A B Approach Delay (s/veh)0.6 0.4 9.9 10.2 Approach LOS A B Copyright © 2022 University of Florida. All Rights Reserved. HCS™TWSC Version 7.9 Generated: 2/4/2022 1:12:55 PM Int Bk PM 2-way.xtw HCS7 All-Way Stop Control Report General Information Site Information Analyst Cody Kerkaert Intersection 9th Ave & W Babcock St Agency/Co.Jurisdiction Date Performed 1/28/2022 East/West Street W Babcock Street Analysis Year 2025 North/South Street 9th AVenue Analysis Time Period (hrs)0.25 Peak Hour Factor 0.80 Time Analyzed Background AM Project Description West Babcock Apartments Major Subdivision Lanes Vehicle Volume and Adjustments Approach Eastbound Westbound Northbound Southbound Movement L T R L T R L T R L T R Volume 3 136 3 3 11 7 5 8 2 11 8 4 % Thrus in Shared Lane Lane L1 L2 L3 L1 L2 L3 L1 L2 L3 L1 L2 L3 Configuration LTR LTR LTR LTR Flow Rate, v (veh/h)178 26 19 29 Percent Heavy Vehicles 1 1 1 1 Departure Headway and Service Time Initial Departure Headway, hd (s)3.20 3.20 3.20 3.20 Initial Degree of Utilization, x 0.158 0.023 0.017 0.026 Final Departure Headway, hd (s)4.04 4.02 4.37 4.36 Final Degree of Utilization, x 0.199 0.029 0.023 0.035 Move-Up Time, m (s)2.0 2.0 2.0 2.0 Service Time, ts (s)2.04 2.02 2.37 2.36 Capacity, Delay and Level of Service Flow Rate, v (veh/h)178 26 19 29 Capacity 891 895 824 825 95% Queue Length, Q₉₅ (veh)0.7 0.1 0.1 0.1 Control Delay (s/veh)8.0 7.1 7.5 7.5 Level of Service, LOS A A A A Approach Delay (s/veh)8.0 7.1 7.5 7.5 Approach LOS A A A A Intersection Delay, s/veh | LOS 7.8 A Copyright © 2022 University of Florida. All Rights Reserved.HCS™AWSC Version 7.9 Generated: 2/4/2022 1:15:18 PMInt Bk AM 4-way.xaw HCS7 All-Way Stop Control Report General Information Site Information Analyst Cody Kerkaert Intersection 9th Ave & W Babcock St Agency/Co.Jurisdiction Date Performed 1/28/2022 East/West Street W Babcock Street Analysis Year 2025 North/South Street 9th AVenue Analysis Time Period (hrs)0.25 Peak Hour Factor 0.98 Time Analyzed Background PM Project Description West Babcock Apartments Major Subdivision Lanes Vehicle Volume and Adjustments Approach Eastbound Westbound Northbound Southbound Movement L T R L T R L T R L T R Volume 10 116 2 2 15 21 4 10 9 39 13 14 % Thrus in Shared Lane Lane L1 L2 L3 L1 L2 L3 L1 L2 L3 L1 L2 L3 Configuration LTR LTR LTR LTR Flow Rate, v (veh/h)131 39 23 67 Percent Heavy Vehicles 1 1 1 1 Departure Headway and Service Time Initial Departure Headway, hd (s)3.20 3.20 3.20 3.20 Initial Degree of Utilization, x 0.116 0.034 0.021 0.060 Final Departure Headway, hd (s)4.16 3.93 4.15 4.30 Final Degree of Utilization, x 0.151 0.042 0.027 0.080 Move-Up Time, m (s)2.0 2.0 2.0 2.0 Service Time, ts (s)2.16 1.93 2.15 2.30 Capacity, Delay and Level of Service Flow Rate, v (veh/h)131 39 23 67 Capacity 865 917 867 838 95% Queue Length, Q₉₅ (veh)0.5 0.1 0.1 0.3 Control Delay (s/veh)7.9 7.1 7.3 7.7 Level of Service, LOS A A A A Approach Delay (s/veh)7.9 7.1 7.3 7.7 Approach LOS A A A A Intersection Delay, s/veh | LOS 7.7 A Copyright © 2022 University of Florida. All Rights Reserved.HCS™AWSC Version 7.9 Generated: 2/4/2022 1:15:48 PMInt Bk PM 4-way.xaw HCS7 Two-Way Stop-Control Report General Information Site Information Analyst Cody Kerkaert Intersection 9th Ave & W Babcock St Agency/Co.Jurisdiction Date Performed 1/28/2022 East/West Street Babcock Street Analysis Year 2025 North/South Street 9th Avenue Time Analyzed Total AM Peak Hour Factor 0.80 Intersection Orientation East-West Analysis Time Period (hrs)0.25 Project Description West Babcock Apartments Major Subdivision Lanes Major Street: East-West Vehicle Volumes and Adjustments Approach Eastbound Westbound Northbound Southbound Movement U L T R U L T R U L T R U L T R Priority 1U 1 2 3 4U 4 5 6 7 8 9 10 11 12 Number of Lanes 0 0 1 0 0 0 1 0 0 1 0 0 1 0 Configuration LTR LTR LTR LTR Volume (veh/h)3 136 3 3 11 7 6 9 3 11 8 4 Percent Heavy Vehicles (%)1 1 1 1 1 1 1 1 Proportion Time Blocked Percent Grade (%)0 0 Right Turn Channelized Median Type | Storage Undivided Critical and Follow-up Headways Base Critical Headway (sec)4.1 4.1 7.1 6.5 6.2 7.1 6.5 6.2 Critical Headway (sec)4.11 4.11 7.11 6.51 6.21 7.11 6.51 6.21 Base Follow-Up Headway (sec)2.2 2.2 3.5 4.0 3.3 3.5 4.0 3.3 Follow-Up Headway (sec)2.21 2.21 3.51 4.01 3.31 3.51 4.01 3.31 Delay, Queue Length, and Level of Service Flow Rate, v (veh/h)4 4 23 29 Capacity, c (veh/h)1591 1384 705 739 v/c Ratio 0.00 0.00 0.03 0.04 95% Queue Length, Q₉₅ (veh)0.0 0.0 0.1 0.1 Control Delay (s/veh)7.3 7.6 10.3 10.1 Level of Service (LOS)A A B B Approach Delay (s/veh)0.2 1.1 10.3 10.1 Approach LOS B B Copyright © 2022 University of Florida. All Rights Reserved. HCS™TWSC Version 7.9 Generated: 2/4/2022 1:14:19 PM Int Tot AM 2-way.xtw HCS7 Two-Way Stop-Control Report General Information Site Information Analyst Cody Kerkaert Intersection 9th Ave & W Babcock St Agency/Co.Jurisdiction Date Performed 1/28/2022 East/West Street Babcock Street Analysis Year 2025 North/South Street 9th Avenue Time Analyzed Total PM Peak Hour Factor 0.98 Intersection Orientation East-West Analysis Time Period (hrs)0.25 Project Description West Babcock Apartments Major Subdivision Lanes Major Street: East-West Vehicle Volumes and Adjustments Approach Eastbound Westbound Northbound Southbound Movement U L T R U L T R U L T R U L T R Priority 1U 1 2 3 4U 4 5 6 7 8 9 10 11 12 Number of Lanes 0 0 1 0 0 0 1 0 0 1 0 0 1 0 Configuration LTR LTR LTR LTR Volume (veh/h)10 116 3 3 15 21 5 10 9 39 14 14 Percent Heavy Vehicles (%)1 1 1 1 1 1 1 1 Proportion Time Blocked Percent Grade (%)0 0 Right Turn Channelized Median Type | Storage Undivided Critical and Follow-up Headways Base Critical Headway (sec)4.1 4.1 7.1 6.5 6.2 7.1 6.5 6.2 Critical Headway (sec)4.11 4.11 7.11 6.51 6.21 7.11 6.51 6.21 Base Follow-Up Headway (sec)2.2 2.2 3.5 4.0 3.3 3.5 4.0 3.3 Follow-Up Headway (sec)2.21 2.21 3.51 4.01 3.31 3.51 4.01 3.31 Delay, Queue Length, and Level of Service Flow Rate, v (veh/h)10 3 24 68 Capacity, c (veh/h)1547 1454 759 760 v/c Ratio 0.01 0.00 0.03 0.09 95% Queue Length, Q₉₅ (veh)0.0 0.0 0.1 0.3 Control Delay (s/veh)7.3 7.5 9.9 10.2 Level of Service (LOS)A A A B Approach Delay (s/veh)0.6 0.6 9.9 10.2 Approach LOS A B Copyright © 2022 University of Florida. All Rights Reserved. HCS™TWSC Version 7.9 Generated: 2/4/2022 1:14:46 PM Int Tot PM 2-way.xtw HCS7 All-Way Stop Control Report General Information Site Information Analyst Cody Kerkaert Intersection 9th Ave & W Babcock St Agency/Co.Jurisdiction Date Performed 1/28/2022 East/West Street W Babcock Street Analysis Year 2025 North/South Street 9th AVenue Analysis Time Period (hrs)0.25 Peak Hour Factor 0.80 Time Analyzed Total AM Project Description West Babcock Apartments Major Subdivision Lanes Vehicle Volume and Adjustments Approach Eastbound Westbound Northbound Southbound Movement L T R L T R L T R L T R Volume 3 136 3 3 11 7 6 9 3 11 8 4 % Thrus in Shared Lane Lane L1 L2 L3 L1 L2 L3 L1 L2 L3 L1 L2 L3 Configuration LTR LTR LTR LTR Flow Rate, v (veh/h)178 26 23 29 Percent Heavy Vehicles 1 1 1 1 Departure Headway and Service Time Initial Departure Headway, hd (s)3.20 3.20 3.20 3.20 Initial Degree of Utilization, x 0.158 0.023 0.020 0.026 Final Departure Headway, hd (s)4.05 4.03 4.35 4.37 Final Degree of Utilization, x 0.200 0.029 0.027 0.035 Move-Up Time, m (s)2.0 2.0 2.0 2.0 Service Time, ts (s)2.05 2.03 2.35 2.37 Capacity, Delay and Level of Service Flow Rate, v (veh/h)178 26 23 29 Capacity 889 893 827 824 95% Queue Length, Q₉₅ (veh)0.7 0.1 0.1 0.1 Control Delay (s/veh)8.1 7.2 7.5 7.5 Level of Service, LOS A A A A Approach Delay (s/veh)8.1 7.2 7.5 7.5 Approach LOS A A A A Intersection Delay, s/veh | LOS 7.9 A Copyright © 2022 University of Florida. All Rights Reserved.HCS™AWSC Version 7.9 Generated: 2/4/2022 1:17:22 PMInt Tot AM 4-way.xaw HCS7 All-Way Stop Control Report General Information Site Information Analyst Cody Kerkaert Intersection 9th Ave & W Babcock St Agency/Co.Jurisdiction Date Performed 1/28/2022 East/West Street W Babcock Street Analysis Year 2025 North/South Street 9th AVenue Analysis Time Period (hrs)0.25 Peak Hour Factor 0.98 Time Analyzed Total PM Project Description West Babcock Apartments Major Subdivision Lanes Vehicle Volume and Adjustments Approach Eastbound Westbound Northbound Southbound Movement L T R L T R L T R L T R Volume 10 116 3 3 15 21 5 10 9 39 14 14 % Thrus in Shared Lane Lane L1 L2 L3 L1 L2 L3 L1 L2 L3 L1 L2 L3 Configuration LTR LTR LTR LTR Flow Rate, v (veh/h)132 40 24 68 Percent Heavy Vehicles 1 1 1 1 Departure Headway and Service Time Initial Departure Headway, hd (s)3.20 3.20 3.20 3.20 Initial Degree of Utilization, x 0.117 0.035 0.022 0.061 Final Departure Headway, hd (s)4.16 3.95 4.18 4.30 Final Degree of Utilization, x 0.152 0.044 0.028 0.082 Move-Up Time, m (s)2.0 2.0 2.0 2.0 Service Time, ts (s)2.16 1.95 2.18 2.30 Capacity, Delay and Level of Service Flow Rate, v (veh/h)132 40 24 68 Capacity 865 912 862 837 95% Queue Length, Q₉₅ (veh)0.5 0.1 0.1 0.3 Control Delay (s/veh)7.9 7.1 7.3 7.7 Level of Service, LOS A A A A Approach Delay (s/veh)7.9 7.1 7.3 7.7 Approach LOS A A A A Intersection Delay, s/veh | LOS 7.7 A Copyright © 2022 University of Florida. All Rights Reserved.HCS™AWSC Version 7.9 Generated: 2/4/2022 1:17:53 PMInt Tot PM 4-way.xaw