Loading...
HomeMy WebLinkAboutQuestions Document 0201241 City of Bozeman Bicycle and Pedestrian Gap Analysis RFP Ques�ons for Week of February 1, 2024 1. Ques�on: Has the project �meline been established? Answer: Upon successful negotiation and signature by both the City and the selected consultant, the project timeline would allow a year for completion of the project. 2. Ques�on: Are you requiring consultants to include a detailed schedule or budget with proposal submissions? Answer: No. 3. Ques�on: Is there the desire for local presence as part of this work? Answer: A local presence is not required but may be beneficial. 4. Ques�on: Is there a page limit for proposals? Answer: No, however the submitted proposal must be a searchable pdf document file that is 25mb or less in size. Submittal information is provided in the RFP document. 5. Ques�on: Is there any City GIS data/inventory of exis�ng sidewalks? Answer: Yes, but this data is lacking in completeness. In “III. Information Provided by the City of Bozeman,” are listed the types of feature classes that can/will be provided by the City. It includes line and polygon sidewalk data. The line data demonstrates an incomplete “snapshot” of the sidewalks existing. The polygon data was flown last year and is a more complete set of data. 6. Ques�on: Does the City have any documenta�on or record of completed bike/ped projects that have not been mapped for the City GIS? Answer: Yes and no. See #5 above. Sidewalks have different data feature class availability than other facilities, as detailed. The goal is to fill the “gaps” in the data so we can make better decisions about prioritizing filling the physical gaps on the ground.