HomeMy WebLinkAbout002 - A2-1 Site Plan & Phasing info267' - 10 5/16"234' - 5 3/4"UTILITY12' - 0"68' - 0"131' - 0"
PHASE 2 OFFICE
BUILDING
PHASE 1
OFFICE
BUILDING
PHASE 1 STORAGE
BUILDING
BUS & TRAILER STORAGE AREA
AND PHASE 1 CONSTRUCTION
MATERIALS STAGING AREA
BUS & TRAILER
LOADING AREA
FALLON STREET
LARAMIE DRIVE
BOZEMAN HIGH SCHOOL
STUDENT PAINTED BUS
ON THE ROOF.103' - 10 1/2"46' - 0"84' - 7 1/4"36' - 0"16' - 0"80' - 0"21' - 0"50' - 0"15' - 0"40' - 0"BLK FR.12' - 0"PLAZA PLAZA
BIKE RACK
GREEN SPACE
GREEN
SPACE
GREEN
SPACE
GREEN
SPACE
GREEN
SPACE
10' - 0"
16' - 10 5/16"15' - 0"PEDESTRIAN
ACCESS TO
FUTURE
MAIN ENTRY.
SECONDARY
PEDESTRIAN
ACCESS.
PEDESTRIAN
ACCESS TO MAIN
ENTRY.
16' - 9 1/16"41' - 0"10 ' - 6"ORNAMENTAL LANDSCAPING
& BOLLARD LIGHTING TO
ACCENT PED. ACCESS.
STORMWATER DETENTION AND
SNOW STORAGE AREA TYP.
SNOW STORAGE
AREA TYP.
SLOPE ALL CONCRETE AND ASPHALT
SURFACES AT 2% GRADE AWAY
FROM ALL BUILDINGS TOWARDS
STORMWATER DETENTION AREA
TYP.
SLOPE ALL CONCRETE AND
ASPHALT SURFACES AT 2%
GRADE AWAY FROM ALL
BUILDINGS TOWARDS
STORMWATER DETENTION
AREA TYP.PHASE 1
PHASE 2
PHASE 1
STORM DRAIN
SANITARY SEWER
WATER
STORM DRAIN
SANITARY SEWER
WATER
EXISTING STREET
TREES IN GRAY TYP.
EXISTING STREET
TREES IN GRAY TYP.
ELECTRICAL
TRANSFORMERELECTRICAL6' - 0"36' - 0"9' - 0"90' - 0"4' - 0"5' - 0"
TRASH
ENCLOSURE
PHASE 2
PHASE 1
50' x 50'
STREET
VISION
TRIANGLE
10' x 15' STREET
VISION TRIANGLES
10' x 15' STREET
VISION TRIANGLES
10' x 15' STREET
VISION TRIANGLES
GREEN
SPACE
2 STREET PARKING
6 STREET PARKING3 STREET PARKING2 STREET
PARKING
4 STREET
PARKING
64' - 0"24' - 0"20' - 0"5' - 0"20' - 0"8' - 0"5' - 6"12' - 0"
PEDESTAL
MAILBOXES
SNOW STORAGEAREA TYP.ELECTRICAL
TRANSFORMER
PROPOSED
E.V. CHARGING
STATION
50' - 0"12' - 0"12' - 0"55.00°2' - 0"
WHEEL STOPS AS
REQ'D. TO PROTECT
5' CLR. SIDEWALK.
52' - 11 17/32"2' - 0"PROPOSED
BUILDINGS
PROPOSED
FUTURE
BUILDING2' - 6"7' - 6"10' - 0"28' - 2 1/2"
BLOCK FRONTAGE FACADE GLAZING:
TOTAL AREA BETWEEN 30" AND 10' A.F.F.: 28.2' X 7.5' = 211.5 S.F.
GLAZING AREAS: (3.0'X6.66')+(3.0'X6.66')+(12.0X 6.66') = 128.67 S.F.
137.54 / 211.50 = 60.8% GLAZING IN REQUIRED AREA.6' - 8"12' - 0"3' - 8"3' - 8"
BLOCK FRONTAGE FACADE GLAZING:
TOTAL AREA BETWEEN 30" AND 10' A.F.F.: 38.2' X 7.5' = 286.5 S.F.
GLAZING AREAS: (5.66'X6.66')+(5.66'X6.66')+(9.33X 6.66')+(5.66'X6.66') = 175.24 S.F.
175.24 / 286.50 = 61% GLAZING IN REQUIRED AREA.2' - 6"7' - 6"10' - 0"38' - 2 1/2"
5' - 8"6' - 8"5' - 8"6' - 8"9' - 4"6' - 8"5' - 8"6' - 8"HIP AND HUMBLE ARCHITECTURE, LLC COPYRIGHT 2019418 South 5th Avenue
Bozeman, MT 59715
406.581.3832
Bob@hahaarchitect.com
PROJECT #:REVDESCDATEPHASEPRESDDDCDDATE1234HIP AND HUMBLE
ARCHITECTURE, LLC
A2-1
06.08.23SITE PLAN & PHASEINFORMATIONCURRENT LANDING, LLCOUTDOOR REC. FACILITYLOT 2 - PARKWAY PLAZAMASTER SITE PLAN2021------------ 1" = 20'-0"A2-1
2 SITE PLAN / PHASING PLAN
1" = 80'-0"A2-1
1 VICINITY MAP
PARKING INFORMATION:
- PHASE 2 BUILDING MAIN FLOOR AREA = 3010 SF
- PHASE 2 BUILDING SECOND FLOOR AREA = 1817 SF
- PHASE 1 STORAGE BUILDING = 2000 SF
- PHASE 1 BUILDING MAIN FLOOR AREA = 2300 SF
- PHASE 1 BUILDING SECOND FLOOR AREA = 2300 SF
OFFICE SPACE REQUIRES 1 SPACE PER 250 SF
STORAGE REQUIRES 1 SPACE PER 1000 SF
- TOTAL PROPOSED OFFICE AREA = 4827 SF PH. 2 BUILDING, 4600
SF PH. 1 BUILDING (4827 + 4600 = 9427 / 250) = 38 SPACES
- TOTAL PH. 1 STORAGE AREA = 2000 / 1000 = 2 SPACES
TOTAL PARKING REQUIRED = 40 SPACES (43 PROPOSED ON SITE)
*PLUS THERE ARE 17 STREET PARKING SPACES AROUND THE
PERIMETER OF THE PROPERTY.
1/4" = 1'-0"A2-1
3
NORTH ELEVATION - PHASE 1
OFFICE GLAZING
1/4" = 1'-0"A2-1
4
WEST ELEVATION - PHASE 2
OFFICE GLAZING
PARKING IN MULTI-BUILDING DEVELOPMENTS
TO BE 50% OF STREET FRONTAGE MAX.
-TOTAL STREET FRONTAGE = 718'-1"
-TOTAL PARKING FRONTAGE = 253'-0"
-PARKING IS 35% OF STREET FRONTAGE