Loading...
HomeMy WebLinkAbout028 WaterWastewater ENGINEERING    CONSULTING      PLANNING    DESIGN  204 N. 11th Ave.  BOZEMAN, MT  59715  406‐581‐3319  www.g‐e‐i.net 204 N. 11th Ave., Bozeman, MT 59715 Cell: (406) 581-3319 www.g-e-i.net Page 1 of 6         Water and Wastewater Design Report    Current Landing, LLC Offices  Corner of Fallon and Laramie St.  Lot 2, Block 1 of  Parkway Plaza Subdivision  Bozeman, Montana                                  December 2022      Prepared By:  Genesis Engineering, Inc.  GEI Project #:  1097.003      Prepared For:  Current Landing, LLC  Bozeman, Montana              204 N. 11th Ave., Bozeman, MT 59715 Cell: (406) 581-3319 www.g-e-i.net Page 2 of 6 H:\1154\004\DOCS\DESIGN\WTR‐SWR\WP\WaterWastewaterDR.doc    Water and Wastewater Design Report  Table of Contents        I. Project Background………………………………………………………………………………………………. 3    1.  Introduction……………………………………………………………………………………………………………… 3   2.  Soil and Groundwater………………………………………………………………………………………………. 3   3.  Land Use…………………………………………………………………………………………………………………… 3   4.  Design Standards……………………………………………………………………………………………………… 3  II.  Sanitary Sewer System……………………………………………………………………………………. 4   1.  Projected Flows…………………………………………………………………………………………………….….. 4   2.  Collection System……………………………………………………………………………………………….……. 4   3.  Service Connections………………………………………………………………………………………….……... 4  III.  Water System……………………………………………………………………………………………….….… 5   1.  Projected Usage………………………………………………………………………………………………….……. 5   2.  Hydraulic Analysis …….……………………………………………………………………………………….……. NA   3.  Water Distribution System ….……………………………………………………………………………….…. NA   4.  Service Connections……………………………………………………………………………………………..….. 6  IV.  Conclusion……………………………………………………………………………………………………..….. 6      Appendix A‐   As‐built Drawings & Calculations                        List of References     City of Bozeman Design Standards and Specifications Policy, March 2004, and all addenda.    Montana Public Works Standard Specifications (MPWSS), 6th Edition   City of Bozeman Modifications to the MPWSS, March 2011, and all Addenda   Montana Department of Environmental Quality (MDEQ) Design Circulars DEQ‐1 and DEQ‐2           204 N. 11th Ave., Bozeman, MT 59715 Cell: (406) 581-3319 www.g-e-i.net Page 3 of 6 H:\1154\004\DOCS\DESIGN\WTR‐SWR\WP\WaterWastewaterDR.doc  I.  Project Background    I‐1.   Introduction  The Current Landing Project consists of 3 proposed office/storage buildings on an existing lot (2) within the  existing Parkway Plaza Subdivision and PUD.  This existing lot is shaded in green in Figure 1 below and consists  of approximately 1.37 acres, more specifically located at the corner of Fallon Street and Laramie Street in  Bozeman, Gallatin County, Montana.        I‐2.   Soils   The NRCS Soil Survey identifies one major soil type on the proposed project site: Turner Loam (457A).  This soil  belongs to hydrologic soil group B as it is comprised primarily of loams with moderately high saturated  hydraulic conductivity.        I‐3.   Land Use  The existing land use is for business park offices as is currently proposed.  The proposed storm water  structures and building elevations will conform to City land use requirements and zoning as it proceeds  through the COB site plan review process.      I‐4.   Design Standards   All sanitary sewer mains, water mains, service connections, and appurtenances will be designed and  constructed in accordance with the Montana Public Works Standard Specifications (MPWSS), 6th Edition; City  of Bozeman Design Standards and Specifications Policy (including Addenda 1‐4), March 2004; City of Bozeman  Modifications to the MPWSS, March 2011 (including Addenda); the Montana Department of Environmental  Quality (MDEQ) Design Circulars DEQ‐1 and DEQ‐2, and any additional addenda thereof.  The City of Bozeman  will assume operation and maintenance of the wastewater and water systems and appurtenances upon  construction and acceptance of the installation.      II.  Sanitary Sewer System    II‐1. Proposed Design Flow      The proposed Current Landing, LLC Office site includes 3 new office buildings on approximately 1.37 acres.   Average day flows were calculated using the DEQ4 standard of 16 gpd per person.  The estimated average  Daily Flow from the proposed project is as follows:    Average Daily Flowrate = (50 Employees + 300 Visitors/Rafters) x 13 gpd/person = 4,550 gpd     Using a 350 person population, a peaking factor was calculated by the following formula, where P = population  (thousands):           PF = 18 + P0.5                4 + P0.5    Using peak hour factor of 4.05 and adding the City’s infiltration allowance of 150 gallons per acre per day  resulted in a combined peak hourly flowrate as follows:  204 N. 11th Ave., Bozeman, MT 59715 Cell: (406) 581-3319 www.g-e-i.net Page 4 of 6 H:\1154\004\DOCS\DESIGN\WTR‐SWR\WP\WaterWastewaterDR.doc     Peak Hourly Flowrate = ADF x PHF + 150 gpd/acre   Peak Hourly Flowrate = 4,550 gpd x 4.05 + 150 gpd x 1.37 = 18,633 gpd      Using Manning’s Equation and a minimum slope of 0.004 ft/ft for an 8‐inch diameter pipe, the full‐flow  capacity of the pipe is 0.76 cfs or 497,629 gallons per day.  The empirically‐based peak design flow occupies  3.77 % of the existing 8‐inch sewer main.  The full flow velocity of the 8‐inch diameter SDR‐35 main is 2.2  ft/sec, exceeding the minimum of 2.0 ft/sec required.    II‐2.   Collection System  The wastewater will be collected within the site with new 4‐inch sewer services for each building connecting to  the existing 8‐inch sewer mains within Laramie Dr. and Fallon St..  No new sanitary sewer manholes or 8”  sewer main is proposed with this project.     II‐3. Service Connections  Service connections (4‐inch) are proposed for each of the three buildings.   Connections to the sanitary sewer  mains will be designed in accordance with the City’s Design Standards and Specifications Policy.  Connections  to the sewer main will be made with in‐line gasketed wyes.      III.  Water System    III‐1.   Projected Usage  The proposed Current Landing, LLC Office site includes 3 new office buildings.  Using the sewage generation  flows from Part II‐1 above, Genesis estimated the total average daily demand (ADD) as seen below.  Using the  City’s max day flow factor of 2.3, results in the maximum daily demand as shown below.  Multiplying the  average daily flow by the City’s peak hour factor of 3, results in a peak hour demand as shown below.  Local  landscape watering is included in the empirical data and thus the peaking factors.  Watering of any green  space will likely be completed using an irrigation well onsite.    The average daily demands are exclusive of the suggested fire flow requirement of 2,000 gallons per minute.   When modeled, the system satisfies the fire flow occurring simultaneously with the maximum day demands  inclusive of the existing subdivision previous design reports.      Average Daily Flowrate = (50 Emp. + 300 Visitors/Rafters) x 13 gpd/person   = 4,550 gpd      4,550 gpd /1440 min per day       = 3.16 gpm    Maximum Daily Flowrate = ADF x 2.3 = 3.16 gpm x 2.3      = 7.27 gpm  Peak Hour Flowrate = ADF x 3 = 3.16 gpm x 3      = 9.48 gpm        III‐2. Hydraulic Analysis  The hydraulic modeling program WaterCAD is used to model domestic and fire protection demands for the  proposed site.  The model uses hydrant flow test results as provided by the City of Bozeman.  Since no new  mains are proposed and the Max Day flow is only an additional 7.27 gpm, the minimum flow of 2,000 gpm  required during the original subdivision approval is still adequate.  Should more recent hydrant test results  become available, we can quantify the exact amount for the neighborhood.  The results are as follows:      Available Fire Flow  is > 2,000 gpm at 20 psi.    Minimum System Pressure > 35 psi throughout the system.   204 N. 11th Ave., Bozeman, MT 59715 Cell: (406) 581-3319 www.g-e-i.net Page 5 of 6 H:\1154\004\DOCS\DESIGN\WTR‐SWR\WP\WaterWastewaterDR.doc  III‐3. Water Distribution System   No 8‐inch diameter ductile iron pipe (DIP) Class 51 water main will be installed for the proposed project.  If  new mains were proposed, all water mains would be designed to meet the 10‐foot horizontal and 18‐inch  vertical separation requirements from all proposed sanitary and storm sewer mains.      III‐4. Service Connections  Future service connections to the water mains will be designed in accordance with the City’s Design Standards  and Specifications Policy and sized based on the projected usage for each service line.  Service lines less than 4  inches in diameter will be type “K” copper pipe, while those equal to or larger than 4 inches will be ductile  iron.  Water services will meet all applicable design standards and flow requirements.      IV.  Conclusion   The analysis and calculations included in this report demonstrate that the proposed designs for water  provision, including fire flow, and wastewater disposal satisfy state and local design requirements.                                                                       204 N. 11th Ave., Bozeman, MT 59715 Cell: (406) 581-3319 www.g-e-i.net Page 6 of 6 H:\1154\004\DOCS\DESIGN\WTR‐SWR\WP\WaterWastewaterDR.doc  Appendix A                                      Currrent Landing Offices Sewer Demand Calcs 204 N. 11th Avenue, Bozeman, MT 59715 These calculations are used to determine the average sanitary sewer flow and required sewer pipe diameters for the project. Using Mannings Equation, the full flow capacity of the proposed PVC sewer line is: Qfull = (1.486/n)*A*R^(2/3)*S^(1/2) where: Diameter = 8 inches n = 0.0130 for PVC A = Pi*r^2 = 0.35 ft^2 P = 2*Pi*r = 2.09 ft R = A/P = 0.1667 ft S = 0.0040 ft/ft Qfull = 0.76 CFS Estimate Proposed Peak Sewage Flow Rate for Pipe Design only Parcel USE NUMBER OF EMPS Lot Area Empirical ADF SQFT ‐ USE Acres (ADD) gal/day g/d/person OFFICE 350 1.37 13 4,550 Total Area = 1.37 Total 4,550 Equivalent Population  Average Daily Flow /  89 gal/capita/day = 350 people Peaking Factor Qmax=  18 + P^(1/2)    = 4.05 4.05 Qave       4 + P^(1/2) Peak Hourly Flow Rate PHF  =  Average Daily Flow * Peaking Factor = 18,428 gal/day Infiltration    =           150 gallons/ day / acre = 206 gal/day          Total PHF = 18,633 gal/day                       or 0.029 cfs Using the above values, velocity at peak hourly flow is: V=(1.486/n)*R^(2/3)*S^.5 = 0.08 ft/sec  and              Qmax  = 3.77 % Qfull