Loading...
HomeMy WebLinkAbout024 Project Narrative TARA Consulting, LLC Timely Accurate Reliable Assist iice Date: March 28, 2023 ATTN: City of Bozeman, Community Development Department 20 East Olive Street, P.O. Box 1230 Bozeman, MT 59715/59771 RE: #23073 Final Master SP and First Phase SP for Laramie Corner/Current Landing project— 3501 Laramie Drive. This letter is provided to fulfill the Project Narrative requirement for a for a new project by Current Landing LLC in the Laramie Corner development in Bozeman MT. This project design is intended to provide a new home for the Madison River Tubing operation which is currently located across from Bozeman High School. The owners hope to keep a fun atmosphere, the ability to allow their vehicles (trucks, buses and trailers) to move efficiently around the new property as well as help service the customers who come to the shop to pick up and drop off rental equipment and participate in one of our various trips. Given this business is seasonal and only able to operate for 3 months per year, the owners want to add office space to help offset the very high costs of land and construction. Given the expense of this development, the owner proposes to develop this property in 2 stages. The owners and design team have developed a plan that is highly functional for the Madison River Tubing business and also blends with the character and design aesthetic of the surrounding neighborhoods and existing environment. Bozeman Planning/Zoning/Zoning Compliance TARA Consulting,LLC•Tara Hastie•806 N.17''Ave.•Bozeman•MT•59715•Phone: 406-922-1609•e-mail: thastie2@gmail.com TARA Consulting, LLC Timely Accurate Reliable Assistance The property to the East of this site is a full coverage parking lot with no buildings as approved per the Parkway Plaza PUD. The existing properties to the South of this site contain parking along Laramie Drive with office buildings set back from the street. There are some vacant lots to the West of this site - multi-family housing to the North. Again, the hope is to build in a style that complements the existing development and built in phases that would accommodate the owners and the city. The proposed phases for the project are as follows: Phase 1: Building the storage building, associated paving, utilities and other required landscaping and site improvements as well as construction of the North Office Building with site improvements and landscaping. (Years 1-3) Phase 2: Building the West Office Building, associated paving, utilities, site improvements and landscaping. (Years 4-5) Madison River Tubing is a local business which hopes to continue their legacy in creating an inviting and fun venue for Bozeman residents, college students, and tourists enjoy tubing and rafting trips as well as a full line of water sports equipment for rent and sale. Bozeman has very few recreational venues that reside within city limits. We hope that our new venue will encourage more tourists to reside within the city Bozeman Planning/Zoning/Zoning Compliance TARA Consulting,LLC•Tara Hastie•806 N.17`h Ave.•Bozeman•MT•59715•Phone: 406-922-1609•e-mail: thastie2@gmail.com 1 IM6,101 Th* Siust t i ri q �old* ►FV U O..r vw nmww" k OMAIW kv ft 33if{IE bot arse ia.aa� iS#tits+tiit�W tit nZWAWW"%kl-in4W*4"loWnOOK+t net ale. 4na askv ' km 04~rs mw" PMtsiI+s ftfto R&wo+ o t-�Siks..t;rs:,�..:tl�.•=lcab ti#ilhk�4r:�ea'�'� .�>�q.+�i4�•�T.aes `�r':�i� •wt ... r i