Loading...
HomeMy WebLinkAbout057_A0.06 - Typical DetailsTypical Elevation Membrane Roofing System BOOT BY ROOFING MNF VERIFY CLEARANCES TO MEMBRANE; ROOFING INSTALLER TO REVIEW ALL STEEL DIMENSIONS FOR PROPER CLEARANCES TO ACHIEVE ADEQUATE FLASHING Tapered Polyiso Insulation HSS Post Per Strl. Steel Post Base per Strl HSS Horizontal Supports Per Strl Typical Section 3' - 10" Vfy4' - 9" Vfy Req'd per Spec'd RTU0' - 11"MECH SCREEN NOTES: A. Metal Cladding: MNF:Metal Sales Mnf. Corp. Type: 7/8" Corrugated Rib Height:7/8" Gauge:24ga, Vfy per Span Material:Galvalume Finish:Standard Black Kynar Fasteners: Exposed B. See Structural for Framing Members and Attachment Roof Top Unit, Sizes Vary, See Mech0' - 3" Min0' - 6" MinEquipment Curb, See Mech for Requirements, Wrap with Membrane Roofing Set T.O. Screen Min 3" Above T.O. Tallest RTU in Screened Area Black Metal Cladding, MTL-3 Closure Metal by Roofing Mnf HSS Diagonal Brace Per Strl. Cap Plate, Typ Pipe 3 STD, See Strl Core Hole Into Concrete. Fill With Grout to Match Adjacent Concrete. PLAN SECTION STL Post STL Tube Post MIN0' - 4"Core Hole into Concrete. Fill with Grout to Match Adjacent Concrete. ConcreteT.O. Concrete Continuous 2"x1" STL Tube Top Rail 2"x1" STL Tube Post @ EA End of Rail Section; 3' - 0"A0.06 2 Post Per Structural Vertical 2x3 Wood Slats w/ 1.5" gap 4x1 Horizontal Batten; Align w/ Battens on Building Exterior Horizontal Batten 1x 4 Horizontal Batten; Align w/ Battens on Building Exterior Crushed Gravel Surface Within Enclosure Concrete Pier Per Structural Brace Per Structural 4' - 3"4' - 3"3' - 6"Level 1 0' - 0"1' - 0"Sill Tape Per Manuf. Wrapped Over ZIP System and Into Opening Jamb Flashing OVER Nail Flange of Window Extend Over Sill Tape and Above Head Nail Fin ROLL OUT ALL WRINKLES Sealant @ Nail Fin Jambs and Head DO NOT PUT SEALANT AT SILL FLANGE Install Window, Shim Sill for Positive Drainage to Exterior Head Tape Flashing Over Jamb Flashing ROLL OUT ALL WRINKLES Integrated ZIP System NOTE: Follow ALL Window Manufacturer & Integrated ZIP System Installation Requirements. Review and Variation with Architect Prior to Install Metal Head Flashing, PER Spec Extend beyond Jamb Flashing 1" Min. Head Tape Flashing Over Metal Head Flashing ROLL OUT ALL WRINKLES PREP R.O. W/ WRB Metal Sill Pan Flashing, to Extend over WRB and Up Jambs 6" Sealant Around Storefront WDW Interior, Not to be located within Sill Pan Install Storefront Window, Shim Sill for Positive Drainage to Exterior MTL Sill SAM-1 See Specs for SAM at Jambs Head and WRB Seams SAM-Sill - See Specs for SAM at Sills and Where Self-Healing is Required Cut WRB @ 45 Degrees Off Ea. Corner and Tack in Place Above, Fold Over Head Flashing Wrap WRB Into Jambs Stop WRB @ Sill Attach WRB Per Mfgr Req'Mts in STRAIGHT LINES Weather Lap and Tape All WRB Seams with Mfgr Tape NOTE: Follow ALL Window Manufacturer Installation Requirements. Review and Variation with Architect Prior to Install WRB Seam Tape over Fasteners and Seams WRB, Weather Resistant Barrier - Per Specification Sealant Around Storefront WDW Exterior, Maintain Weepholes per Manuf. SAM Head FLashing Under WRB at Header, Over WRB at Jamb ROLL OUT ALL WRINKLES SAM-1 Head Metal Head Flashing, PER Spec Extend beyond Jamb Flashing 1" Min.CONT SNGL PLY RFG DN Wall1' - 0" MIN3" MINadhered to MFR accepted substrate Wrap Membrane Roofing over top of Parapet Wall per MFR & over WRB @ EXT face Fasten 4" O.C. staggered using GALV annular ring nails or other MRF accceptable fastener Fasterner and Seam Fastening plate per MFR, 12" O.C. Max , Wrap up Wall Siding per Plan , 1-1/2" MIN Roof per Plan1/2"-1"Integrated WRB Insulation Clad MTL Flashing w/ CONT MTL Hook Strip Flashing Strip, Hot-Air Weld, per MNFR PT Blocking Single Ply RFG 1 Vapor Barrier Hot-Air Weld, per MNFR Sealant per MFR Single Ply RFG 1 Thermoplastic Pre-molded Pipe Flashing 1-1/2" MIN beyond fastening plates Stainless STL Clamping ring per MFR Water cut-off mastic 1' - 0" MINFastener & Seam Fastening Plate, per MFR Follow all MFR instructions regarding installation of pre- molded Pipe Flashing Single Ply RFG 1 Hot-Air Weld, per MNFR Dome Flashing Ring & Drain, adjust to 2" above ADJ Roof Drain Low profile Overflow Drain, SEE Plumbing DWGS Low Profile Roof Drain, SEE Plumbing DWGS Deck Clamp Roof Sheathing Drain Leader Taper INSUL to Drain 0' - 6" MIN Field weld cannot pass within 9" of the drain claimping Connect pipe after final adjustments are made Single Ply RFG 1 Follow all MFR instructions regarding installation of pre- molded Pipe Flashing Min. 0' - 3"8" MinF-3a Monolithic Membrane Flex-Flash UN Seperation Sheet/Protection Course St. Stl. Band Clamp PROJECT # SHEET NUMBERREVISION:DATE 618 N Wallace | Bozeman, MT 59715This drawing is not intended nor shall it be used for construction purposes unless the signed professional stamp of a regisered architect employed at MINARIK Architecture, Inc. is affixed above. Consultant:971−319−6249 | www.minarikarch.comProject Status:© 2022 MINARIK Architecture, Inc ALL RIGHTS RESERVED These Drawings are the Property of MINARIK Architecture, Inc and are not to be used or reproduced in any manner without prior written permission.11/10/2023 3:26:52 PM2303 A0.06The Lumberyard FlatsVirga Venture 1 LLCTschache Lane11/10/2023 Typical DetailsSchematic Design1" = 1'-0" Mechanical Roof Top Unit Enclosure11 1/2" = 1'-0" Typ. Site Handrail Base Connection21 1/2" = 1'-0" Typ. Site Handrail Section31/2" = 1'-0" Section At Utility Screening4 1 1/2" = 1'-0" WDW Detail - Zip System at Flanged Window9 1 1/2" = 1'-0" WDW Detail - Storefront Window51 1/2" = 1'-0" TYP Parapet Detail - TPO Roofing61 1/2" = 1'-0" TYP Round Roof Penetration Detail - TPO71 1/2" = 1'-0" Roof Drain - TPO8 1 1/2" = 1'-0" Monolithic Membrane10 REVISIONDATEREASON FOR ISSUE