Loading...
HomeMy WebLinkAbout050_S2.30 - Schematic Floor Framing Plan (Level 3&4)10987654321 F E D C B A 940 SF 2 Bed 691 SF 1 Bed 694 SF 1 Bed 674 SF 1 Bed694 SF 1 Bed 973 SF 2 Bed 694 SF 1 Bed 693 SF 1 Bed 1223 SF 3 Bed 1231 SF 3 Bed 1080 SF 2 Bed 1082 SF 2 Bed 1039 SF 2 Bed 674 SF 1 Bed 694 SF 1 Bed 531 SF 1 Bed 68 SF Elev 1323 SF Corridor 212 SF Stair A 54 SF Storage 104 SF Trash54 SF Storage 173 SF Stair B 51 SF Storage 6' - 0"30' - 6"5' - 3"29' - 0"5' - 3"76' - 0"34' - 0"24' - 0"24' - 0"36' - 0"24' - 0"24' - 0"24' - 0"24' - 0"18' - 6" 232' - 6" 54 SF Storage 51 SF Storage 54 SF Storage 1 S4.00 2 S4.00 PROJECT # SHEET NUMBERREVISION:DATE 618 N Wallace | Bozeman, MT 59715DRAFT NOT FOR CONSTRUCTION This drawing is not intended nor shall it be used for construction purposes unless the signed professional stamp of a regisered architect employed at MINARIK Architecture, Inc. is affixed above. Consultant:971−319−6249 | www.minarikarch.comProject Status:© 2022 MINARIK Architecture, Inc ALL RIGHTS RESERVED These Drawings are the Property of MINARIK Architecture, Inc and are not to be used or reproduced in any manner without prior written permission.10/3/2023 4:18:05 PM2303 S2.30The Lumberyard FlatsVirga Venture 1 LLCTschache Lane09/25/2023 Floor Plan - Level 3SD 1/8" = 1'-0" Floor Plan - Level 31 REVISIONDATEREASON FOR ISSUESCHEMATIC FLOOR FRAMING PLAN INDICATES SPAN DIRECTIONFOR 11-7/8" TJI FLOOR SYSTEM(230 SERIES UNO) INDICATES SPAN DIRECTIONFOR 2x8 HALLWAY JOISTS INDICATES PRIMARYBEARING WALL LOCATION INDICATES SHEAR WALLLOCATION (1/2" SHEATHINGAND TDS SYSTEM) TJI 560 SERIES TJI 560 SERIES TJI 560 SERIES TJI 560 SERIES SCHEMATIC FLOOR FRAMING PLAN - LEVEL 3 AND 4 SCHEMATIC FLOOR FRAMING PLAN(LEVEL 3 AND 4) MISC LVL BEAMS ATCORRIDOR OPENINGS