Loading...
HomeMy WebLinkAbout049_S2.20 - Schematic Floor Framing Plan (Level 2)UP UP 10987654321 F E D C B A 76' - 0"6' - 0"30' - 6"5' - 3"29' - 0"5' - 3"232' - 6" 34' - 0"24' - 0"24' - 0"36' - 0"24' - 0"24' - 0"24' - 0"24' - 0"18' - 6" 940 SF 2 Bed 691 SF 1 Bed 694 SF 1 Bed 674 SF 1 Bed 694 SF 1 Bed 973 SF 2 Bed 694 SF 1 Bed 693 SF 1 Bed 1223 SF 3 Bed 1231 SF 3 Bed 1080 SF 2 Bed 1082 SF 2 Bed 1039 SF 2 Bed 674 SF 1 Bed 694 SF 1 Bed 531 SF 1 Bed 104 SF Trash 54 SF Storage 51 SF Storage 54 SF Storage 68 SF Elev 212 SF Stair A 232 SF Stair B 1323 SF Corridor 51 SF Storage 54 SF Storage 54 SF Storage 1 S4.00 2 S4.00 PROJECT # SHEET NUMBERREVISION:DATE 618 N Wallace | Bozeman, MT 59715DRAFT NOT FOR CONSTRUCTION This drawing is not intended nor shall it be used for construction purposes unless the signed professional stamp of a regisered architect employed at MINARIK Architecture, Inc. is affixed above. Consultant:971−319−6249 | www.minarikarch.comProject Status:© 2022 MINARIK Architecture, Inc ALL RIGHTS RESERVED These Drawings are the Property of MINARIK Architecture, Inc and are not to be used or reproduced in any manner without prior written permission.10/3/2023 4:18:04 PM2303 S2.20The Lumberyard FlatsVirga Venture 1 LLCTschache Lane09/25/2023 Floor Plan - Level 2SD 1/8" = 1'-0" Floor Plan - Level 21 REVISIONDATEREASON FOR ISSUE10987654321 F E D C B A 34' - 0"24' - 0"24' - 0"36' - 0"24' - 0"24' - 0"24' - 0"24' - 0"18' - 6"6' - 0"30' - 6"5' - 3"29' - 0"5' - 3"232' - 6" 1211 SF 3 Bed 324 SF Garage 324 SF Garage 324 SF Trash 249 SF Stair B 737 SF Bike/Ski 404 SF Garage 324 SF Garage 324 SF Garage 324 SF Garage 324 SF Garage 324 SF Garage 324 SF Garage 323 SF Garage 1230 SF 3 Bed 694 SF 1 Bed 694 SF 1 Bed 1043 SF 2 Bed 694 SF 1 Bed 694 SF 1 Bed 694 SF 1 Bed 694 SF 1 Bed 944 SF 2 Bed 1185 SF Corridor 375 SF Lobby 118 SF Riser 73 SF Stair A 68 SF Elev 76' - 0"1 S4.00 2 S4.00 SCHEMATIC FLOOR FRAMING PLAN - LEVEL 2 SCHEMATIC FLOOR FRAMING PLAN INDICATES SPAN DIRECTIONFOR 11-7/8" TJI FLOOR SYSTEM(230 SERIES UNO) INDICATES SPAN DIRECTIONFOR 2x8 HALLWAY JOISTS INDICATES PRIMARYBEARING WALL LOCATION INDICATES SHEAR WALLLOCATION (1/2" SHEATHINGAND TDS SYSTEM) TJI 560 SERIES TJI 560 SERIES TJI 560 SERIES TJI 560 SERIES INDICATES DISTCONTINUOUSBEARING OR SHEARWALL ABOVE INDICATES TRANSFER BEAM (LVL OR STEEL; FINAL SIZE TBD) SHADED AREA IS EXTENTS OFEXTERIOR OVER INTERIORCONDITION STANDALONE POST 10' - 9 3/4"9' - 0 5/8"Clear 5' - 0" Garage 2 BedCorridor Corridor 1 Bed 1 Bed DISTCONTINUOUS WALL ABOVE TRANSFER BEAM (LVL OR STEEL; SIZE TBD) BUILDING CROSS SECTION AT LEVEL 2 OFFSET W12x35 W12x35 W12x19 W12x19 W12x19 W10x22, TYP THIS LINE W10x22 TYP THIS LINE W12x35W12x35W12x35W12x35W12x40W12x40W12x40W12x40HSS POST THISEND, TYP LVL BMLVL BMLVL BMLVL BMLVL BMLVL BMW12x19 W12x35W12x35STL BMSTL BMSTL BM LVL OR STEEL EDGE BEAMDEPENDING ON SPANW12x35W12x35STL BM SCHEMATIC FLOOR FRAMING PLAN(LEVEL 2)