Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
001_G0.00 - Cover Sheet
W Oak Street I-90 SITE N N 11th AveN 14th AveN 7th AveN 19th AvePatrick St B-2MB-2 Baxter Ln OPEN SPACE CALCULATIONS: Required Per Building Required Per Site Unit Type Abbrv.Size (sf)Quantity Open Space Quantity Open Space Type A / 1 Bedroom / 1 Bath 1x1 (A)3 300 15 1,500 Type B / 1 Bedroom / A Bath 1x1 (B)30 3,000 150 15,000 Type A / 2 Bedroom / 2 Bath 2x2 (A)13 1,950 65 9,750 Type B / 2 Bedroom / 2 Bath 2x2 (B)4 600 20 3,000 3 Bedroom / 3 Bath 3x2 8 1,200 40 6,000 Total:58 7,050 290 35,250 Open Space Provided: LOT 2A PHASE 1 LOT 1A PHASE 2 Total Required: 21,150 SF Total Required: 14,100 SF Ground Level Porches: 1,692 SF Ground Level Porches: 1,128 SF Private Balconies: 0 SF Private Balconies: 0 SF Indoor Clubhouse Amenity: 3,247 SF Ground Level Shared Open Space (Building Entries): 6,270 SF Ground Level Shared Open Space (Clubhouse): 21,000 SF *Surplus from Phase 1: 7,268 SF Ground Level Shared Open Space (Building Entries): 2,479 SF Total Provided: 14,666 SF Total Provided: 28,418 SF NORTH 14TH AVENORTH 11TH AVEPATRICK STREET TSCHACHE LANE FLATS BLDG 1 FLATS BLDG 2 FLATS BLDG 3 CLUBHOUSE PHASE 2, NIS Legend Truck/Delivery Route Material & Equipment Staging Area Perimeter Fencing 40 Yard Roll-Off Dumpster LL Jobsite Trailer Portable Toilet Dirt Spoils Area (To be removed upon completion of foundation backfill) Jobsite Entrance Exit to Oak St Enter From Oak St Material & Equipment Staging Area Jobsite Trailer Dumpster Portable Toilet Dirt Spoils Area PROJECT # SHEET NUMBERREVISION:DATE 618 N Wallace | Bozeman, MT 59715This drawing is not intended nor shall it be used for construction purposes unless the signed professional stamp of a regisered architect employed at MINARIK Architecture, Inc. is affixed above. Consultant:971−319−6249 | www.minarikarch.comProject Status:© 2022 MINARIK Architecture, Inc ALL RIGHTS RESERVED These Drawings are the Property of MINARIK Architecture, Inc and are not to be used or reproduced in any manner without prior written permission.11/13/2023 10:00:53 AM2303 G0.00The Lumberyard FlatsVirga Venture 1 LLCTschache Lane11/10/2023 Cover SheetSchematic DesignThe Lumberyard Flats CODES:SHEET INDEX: PROJECT TEAM: Owner: Virga Ventures I LLC 211 East Oak Street, Suite #2B / Bozeman, MT 59715 P: 804.319.1480 Architect: Minarik Architecture, Inc 618 N Wallace Ave / Bozeman, MT 59715 P: 971.319.6249 Attn: Doug Minarik / doug@minarikarch.com Civil Engineer: Stahly Engineering & Associates, Inc 851 Bridger Drive, Suite 1 / Bozeman, MT 59715 P: 406.522.9526 Attn: Cordell Pool Structural Engineer: DCI Engineers 1060 Fowler Ave Suite 202 / Bozeman, MT 59718 P: 406.556.8600 Attn: Jon Lovgren / jlovgren@dci-engineers.com General Contractor: TBD Landscape Architect: Design 5, LLC 111 North Tracy Ave / Bozeman, MT 59715 P: 406.587.4873 Attn: Troy Scherer MEP: DC Engineering 4145 SW Watson Ave Suite 350 / Beaverton, OR 97005 P: 208.493.0088 Attn: Ryan Ewig / rewing@dcengineering.net Aaron Prough / aprough@dcengineering.net PROPERTY INFORMATION: Project Address: Tschache Lane, Bozeman, MT County:Gallatin Geocode: 06-0798-01-2-05-03-0000 Legal Description: PT LAND PH 2 SUB, S01, T02 S, R05 E, BLOCK 3, Lot 2a (phase 2 includes Lot 1a, REF Site Plan) Plat J-498B Zone: B-2M Property / Lot Area:(Lot 2, Phase 1) 5.36acres (Lot 1, Phase 2 = 3.27 acres) Total: 8.63 acres = 375,818 SF FAR : 4:1(38.320.040) Building Footprints: (Phase 1) • BLDG 1 Apt 16,139 • BLDG 2 Apt 16,139 • BLDG 3 Apt 16,139 • Clubhouse 6,945 (Phase 2) • BLDG 4 Apt 16,139 • BLDG 5 Apt 16,139 Total 87,640 SF Lot Coverage Provided:23% Lot Coverage COB Max:75%(38.320.040) 100% (38.320.050) Building Height: Max Allowed Building Height: 50'-0" Proposed Max Building Height: 47'-0" (38.320.050.8b) Building Areas Per Apartment: Level 1:16,139 Level 2:16,745 Level 3:16,745 Level 4: 16,363 Total Building Area: 65,992 sf NOTE:Refer to civil and landscape for all other parcel and site coverage info. GENERAL NOTES: 1. This set of drawings is published in conjunction with an in line specification without which the Contract Documents are Incomplete. 2. Contractor must comply with the rules and regulations of the agencies having jurisdiction and shall conform to all city, county, state and federal construction safety and sanitary laws, codes statutes and ordinances. All fees, taxes, permits, applications and certificates of inspection, and the filing of all work with governmental agencies shall be the responsibility of the contractor. 3. All work shall be performed by skilled and qualified workmen in accordance with the best practices of the trades involved, and in compliance with building regulations and/or governmental laws, statutes or ordinances concerning the use of union labor. 4. Each trade will proceed in a fashion that will not delay the trades following them. 5. All work shall be erected and installed plumb, level, square, true, and in proper alignment. 6. All work and materials shall be guaranteed against all defects for a period of at least one (1) year from approval of final payment. 7. Do not scale the drawings. Written dimensions take precedence over scaled dimensions. Dimensions are to face of framing, face of concrete, gridline, or centerline of object, unless otherwise noted. PROJECT DESCRIPTION: The Lumberyard Apartments: The Lumberyard is a multi-building residential development located at the northeast corner of North 14th Avenue and Patrick Street. The project will be built in two phases. The first phase will include three multifamily buildings, the amenity clubhouse, 279 on-site parking spaces plus ample landscaping and pedestrian paths. The second phase anticipates two additional multifamily buildings and the remaining 191 parking spaces. The single-story clubhouse will be 6,945 SF and include a variety of uses for residents and their guests. Each four-story, elevator-served multifamily building will be 65,704 SF, average 47 feet in height, and contain the following unit mix: 3 Bedroom / 2 Bath -Approx. 1,230 SF each (8) per Bldg / (24) per Phase 1 2 Bedroom / 2 Bath -Approx. 1,040 SF each (17) per Bldg / (51) per Phase 1 1 Bedroom / 1 Bath -Approx. 695 SF each (33) per Bldg / (99) per Phase 1 8. Detailed drawings and larger scale drawings take precedence over smaller scale drawings. 9. The Architect shall neither have control over or charge of, nor be responsible for, the construction means, methods, techniques, sequences or procedures, or for safety precautions and programs in connection with the work, since these are solely the Contractor's rights and responsibilities under the Contract Documents. 10. The stability of the structure is dependent on the completed condition. The design, adequacy, and safety of erection bracing, shoring, temporary supports, etc, is the sole responsibility of the contractor and has not been considered by the architect/ designer. The contractor is responsible for the stability of the structure prior to the completion of all shear walls, roof and floor diaphragms and finish materials. 11. Overall site plan based on spot elevations and non-comprehensive site survey by others. Actual site conditions may differ from conditions shown in these documents. Contractor shall verify and confirm existing conditions shown or implied on the drawings prior to the start of construction or ordering materials. Notify architect/ designer of any discrepancies. 12. Contractor and subcontractor shall become familiar with the site, existing conditions, and these drawings prior to commencing work. 13. Scope of work shall include work indicated and implied by these drawings. 14. All construction debris to be removed off-site. All debris is to be disposed of in a legal manner at a landfill or recycling facility. No debris shall be disposed of in local waste collection facilities. 15. Contractor to locate exact locations of utilities. 16. Install all materials per manufacturer recommendations. 17. All sheet metal work shall conform to current SMACNA (Sheet Metal and Air Conditioning Contractors' National Assoc., Inc.) Standards. 18. Submit paint drawdowns, cabinetry shop drawings, and all other related finishes for designer approval. 19. Submit locations of fire strobes and thermostat locations for Designer approval prior to construction to avoid conflict with furnishings. S2.10 Schematic Foundation Plan S2.20 Schematic Floor Framing Plan (Level 2) S2.30 Schematic Floor Framing Plan (Level 3&4) S2.40 Schematic Roof Framing Plan A0.01 Assemblies - Floor And Roof A0.02 Assemblies - Wall A0.03 Schedules and Legends A0.04 Door & Window Schedule A0.05 Typical Details A0.06 Typical Details A1.00 Site Plan A2.10 Floor Plan - Level 1 A2.20 Floor Plan - Level 2 A2.30 Floor Plan - Level 3 A2.40 Floor Plan - Level 4 A2.50 Roof Plan A3.00 Elevations A3.10 Elevations A4.00 Building Sections CA0.01 Assemblies CA0.03 Door & Window Schedule CA1.00 Site Plan CA1.01 Floor Plan CA1.10 Roof Plan CA1.50 Reflected Ceiling Plan CA2.20 Elevations CA2.21 Elevations CA3.01 Building Sections CA3.02 Building Sections CA5.00 Exterior Details P1.0 Plumbing Site Plan P2.3 Plumbing Water Plan - First Floor P3.0 Plumbing Schedules CP1.0 Plumbing Site Plan CP2.3 Plumbing Water & Gas Plan - First Floor CP3.0 Plumbing Schedules E1.0 Electrical Site Plan E1.1 Electrical Site Photometric Plan G0.00 Cover Sheet T1.0 Title Sheet C0.1 Civil Specifications C0.2 Lot and Easement Summary C0.3 Existing Conditions Plan C1.0 Site Plan C1.1 Civil Site Plan C1.1A Enlarged Civil Site Plan (NW Quad) C1.1B Enlarged Civil Site Plan (SW Quad) C1.1C Enlarged Civil Site Plan (S. Midblock) C1.1D Enlarged Civil Site Plan (N. Midblock) C1.2 Shallow Utility Plan C1.3 Site Sleeving Plan C2.0 Water Plan C2.1 Water Details C3.0 Sanitary Sewer Plan C3.1 Sewer Details C4.0 Grading and Drainage Plan C4.0A Enlarged Grading and Drainage Plan (NW Quad) C4.0B Enlarged Grading and Drainage Plan (SW Quad) C4.0C Enlarged Grading and Drainage Plan (S. Midblock) C4.0D Enlarged Grading and Drainage Plan (N. Midblock) C4.1 Drainage Details C4.2 Site Details C5.0 Paving Plan C6.0 Signage & Striping Plan L000 Site Plan L001 Notes & Legends L002 Notes & Legends L003 Notes & Legends L200 Flats Building 1 Hardscape Plan L201 Clubhouse Hardscape Plan Enlargement L202 Clubhouse Hardscape Plan Enlargement - South L203 Flats Building 2&3 Hardscape Plan L300 Overall Tree Plan L301 Lot 2A Parking Lot Landscape L302 Access Drive Parking Lot Landscape L303 Flat Building 1 Planting Plan Enlargement L304 Clubhouse Planting Plan Enlargement - North L305 Clubhouse Planting Plan Enlargement - South L306 Flats Building 2 Planting Plan Enlargement L307 Flats Building 3 Planting Plan Enlargement L500 Landscape Details L501 Landscape Details L502 Landscape Details L503 Landscape Details L600 Irrigation Water Use Calcs & Sleeving Plan Jurisdictional Authority: City of Bozeman, Community Development Services Applicable Codes: 2021 International Building Code 2021 International Mechanical Code 2021 Uniform Plumbing Code 2020 National Electrical Code 2021 International Energy Conservation Code 2012 International Fire Code ICC A117.1-2017 Standard for Accesible and Usable Buildings and Facilities Vicinity Map1 1" = 100'-0" Construction Management Plan2 REVISIONDATEREASON FOR ISSUE