HomeMy WebLinkAbout00_Notification Letter SPBOZEMANMT
Community Development
DEVELOPMENT REVIEW APPLICATION
Remember to obtain owner signature on this form prior to uploading with the rest of your submittal
PROJECT INFORMATION
Project Name:
Project Type(s):
Street Address:
Legal Description:
Description of Project:
Current Zoning:
Existing Use:
Proposed Use:
Gross Lot Area:
Number of Buildings:
Type and Number of Dwellings:
Building Size (SF):
Non-Residential Building Size (SF):
36318 Building Height (ft):
25.5 Affordable Housing (Y/N):
Departure/Deviation Request (Y/N):
Zoning Verification Expedited (Y/N):
PROPERTY OWNER
Company Name:
Name:
Full Address:
Email:
Phone:
APPLICANT
Company Name:
Name:
Full Address:
Email:
Phone:
The Lumberyard Phase 1
Site Plan SP
Between Patrick Street and Tschache Lane and N 11th and N 14th (Western Parcel of Phase 1)
PT Land PH 2 Sub, NW ¼ of S01, T02 S, R05 E, Block 3, Lot 2A, Plat J-498B
The project is divided into 2 phases: Phase 1 is (3) 58-unit apartment buildings and a clubhouse. (this application)
Phase 2 will be (2) 58-unit apartment buildings.
B-2M Community Business District - Mixed
Undeveloped
Residential
233357
3
174
65992
6945
47 (Average for Multi-family)
N
N
N
Virga Venture I LLC
Rob Lateiner
PO Box 1070, Bozeman, MT 59715
rob@virgacapital.com
(406) 599-9419
Minarik Architecture, Inc
Doug Minarik
618 N Wallace Ave, Bozeman, MT 59715
doug@minarikarch.com
(406) 579-5597
DocuSign Envelope ID: C8FB3B74-B1D7-43A0-AD2E-14A29565F38D
REPRESENTATIVE
Company Name:
Name:
Full Address:
Email:
Phone:
CERTIFICATIONS AND SIGNATURES
Applicant signature is captured electronically at time of application submittal. This application PDF must also be
signed by the property owner(s) for all application types before the submittal will be accepted. The only exception
to this is an informal review application that may be signed by the applicant(s) only. The applicant(s) and property
owner(s) submit this application for review under the terms and provisions of the Bozeman Municipal Code. It is
further indicated that any work undertaken to complete a development approved by the City of Bozeman shall be
in conformance with the requirements of the Bozeman Municipal Code and any special conditions established by
the approval authority. I acknowledge that the City has an Impact Fee Program and impact fees may be assessed
for my project. Further, I agree to grant City personnel and other review agency representative's access to the
subject site during the course of the review process (Section 38.200.050, BMC). I (We) hereby certify that the
above information is true and correct to the best of my (our) knowledge.
Certification of Completion and Compliance - I understand that conditions of approval may be applied to the
application and that I will comply with any conditions of approval or make necessary corrections to the application
materials in order to comply with municipal code provisions.
Statement of Intent to Construct According to the Final Plan - I acknowledge that construction not in
compliance with the approved final plan may result in delays of pccupancy or costs to correct noncompliance.
Property Owner Signature:
Printed Name:
CONTACT US
Alfred M. Stiff Professional Building phone 406-582-2260
20 East Olive Street fax 406-582-2263
Bozemn, MT 59715 planning@bozeman.net
www.bozeman.net/planning
SAME AS APPLICANT
DocuSign Envelope ID: C8FB3B74-B1D7-43A0-AD2E-14A29565F38D
Robert
Lateiner