Loading...
HomeMy WebLinkAbout00_Notification Letter SPBOZEMANMT Community Development DEVELOPMENT REVIEW APPLICATION Remember to obtain owner signature on this form prior to uploading with the rest of your submittal PROJECT INFORMATION Project Name: Project Type(s): Street Address: Legal Description: Description of Project: Current Zoning: Existing Use: Proposed Use: Gross Lot Area: Number of Buildings: Type and Number of Dwellings: Building Size (SF): Non-Residential Building Size (SF): 36318 Building Height (ft): 25.5 Affordable Housing (Y/N): Departure/Deviation Request (Y/N): Zoning Verification Expedited (Y/N): PROPERTY OWNER Company Name: Name: Full Address: Email: Phone: APPLICANT Company Name: Name: Full Address: Email: Phone: The Lumberyard Phase 1 Site Plan SP Between Patrick Street and Tschache Lane and N 11th and N 14th (Western Parcel of Phase 1) PT Land PH 2 Sub, NW ¼ of S01, T02 S, R05 E, Block 3, Lot 2A, Plat J-498B The project is divided into 2 phases: Phase 1 is (3) 58-unit apartment buildings and a clubhouse. (this application) Phase 2 will be (2) 58-unit apartment buildings. B-2M Community Business District - Mixed Undeveloped Residential 233357 3 174 65992 6945 47 (Average for Multi-family) N N N Virga Venture I LLC Rob Lateiner PO Box 1070, Bozeman, MT 59715 rob@virgacapital.com (406) 599-9419 Minarik Architecture, Inc Doug Minarik 618 N Wallace Ave, Bozeman, MT 59715 doug@minarikarch.com (406) 579-5597 DocuSign Envelope ID: C8FB3B74-B1D7-43A0-AD2E-14A29565F38D REPRESENTATIVE Company Name: Name: Full Address: Email: Phone: CERTIFICATIONS AND SIGNATURES Applicant signature is captured electronically at time of application submittal. This application PDF must also be signed by the property owner(s) for all application types before the submittal will be accepted. The only exception to this is an informal review application that may be signed by the applicant(s) only. The applicant(s) and property owner(s) submit this application for review under the terms and provisions of the Bozeman Municipal Code. It is further indicated that any work undertaken to complete a development approved by the City of Bozeman shall be in conformance with the requirements of the Bozeman Municipal Code and any special conditions established by the approval authority. I acknowledge that the City has an Impact Fee Program and impact fees may be assessed for my project. Further, I agree to grant City personnel and other review agency representative's access to the subject site during the course of the review process (Section 38.200.050, BMC). I (We) hereby certify that the above information is true and correct to the best of my (our) knowledge. Certification of Completion and Compliance - I understand that conditions of approval may be applied to the application and that I will comply with any conditions of approval or make necessary corrections to the application materials in order to comply with municipal code provisions. Statement of Intent to Construct According to the Final Plan - I acknowledge that construction not in compliance with the approved final plan may result in delays of pccupancy or costs to correct noncompliance. Property Owner Signature: Printed Name: CONTACT US Alfred M. Stiff Professional Building phone 406-582-2260 20 East Olive Street fax 406-582-2263 Bozemn, MT 59715 planning@bozeman.net www.bozeman.net/planning SAME AS APPLICANT DocuSign Envelope ID: C8FB3B74-B1D7-43A0-AD2E-14A29565F38D Robert Lateiner