Loading...
HomeMy WebLinkAbout032 - Appendix R - Completion of Improvements Request 1091 Stoneridge Drive • Bozeman, Montana • Phone (406) 587-1115 • Fax (406) 587-9768 www.chengineers.com • E-Mail: info@chengineers.com Civil/Structural Engineering and Surveying September 23, 2021 City of Bozeman Engineering Department 20 E. Olive Street Bozeman, MT 59718 Re: Ferguson Farm II P.U.D. Subdivision Preliminary Plat Application (COB - #19027; C&H #170827) Subject: Completion time for subdivisions (Muni Code Section 38.270.030) To whom it may concern, The purpose of this letter is to elect the requirement set forth in Section 38.270.030.B.1.b.(2) that allows the developer to enter into an improvements agreement guaranteeing the completion of typical Right-of-Way improvements prior to final plat approval. The purpose of this request is to allow for the developer to construct sidewalks in accordance with the attached drawing with infrastructure improvements and leave the remaining sidewalks in the subdivision to be constructed by individual lot owners at the time of site plan construction. The reason for this is because many of the sidewalks in the Ferguson Farm II P.U.D. Subdivision extend all the way to the future building face. In order to avoid the construction, destruction and then reconstruction of said sidewalks, it is proposed that the developer enters into an improvements agreement guaranteeing the completion of the remaining portion of sidewalks within the subdivision that are not shown on the attached map. If you require any further information, please give me a call at (406) 404-7520. Sincerely, Tim Staub, P.E. Enclosures: EX2_Sidewalks and streetscape Plan_2021-09-14