Loading...
HomeMy WebLinkAbout031 - Appendix Q - MDT Approach Letter of IntentRail, Transit and Planning Division Phone: (406) 444–3423 Fax: (406) 444–7671 An Equal Opportunity Employer Toll–free: (800) 714–7296 TTY: (800) 335–7592 Web Page: www.mdt.mt.gov December 15, 2020 Tim Staub, P.E. Project Engineer C&H Engineering and Survey, Inc. 1091 Stoneridge Drive Bozeman, MT 59718 Subject: Ferguson Farm II Development – Huffine Lane/N-50, Bozeman (65.71.478.01) Mr. Staub: The Montana Department of Transportation staff have reviewed the information you provided by email on November 23, 2020 regarding the subject project. We agree to allow installation of the proposed Brookfield Avenue, as a right-in, right-out approach to Huffine Lane directly across from Teakwood Drive under the condition that the developer completes MDT permit review and approval process. Because the approach will be restricted to right-in, right-out movements, raised median, lighting and signage must be installed. An Approach Application and Permit, Environmental Checklist, and design plans for all proposed improvements must be reviewed and approved by MDT prior to any work taking place within MDT right-of-way. Please contact Lee Alt, the Butte District Traffic Engineer, at 406-494-9611 to initiate the permitting process. Also, please confirm that the proposed trail and parking areas are located outside of MDT right-of-way. Feel free to contact me at (406) 444-4262 if you have any questions or if you need additional information. Sincerely, Jason Hughey, Planner Policy, Program & Performance Analysis Bureau Rail, Transit & Planning Division Copy: William Fogarty, P.E., MDT Butte District Administrator Duane Liebel, P.E., MDT Butte District Engineering Services Supervisor Kyle DeMars, MDT Bozeman Area Maintenance Chief Lee Alt, MDT Butte District Traffic Engineer Stan Brelin, P.E., MDT Traffic – Engineering 2701 Prospect PO Box 201001 Helena MT 59620-1001 Montana Department of Transportation Michael T. Tooley, Director Steve Bullock, Governor