Loading...
HomeMy WebLinkAbout001 Final Plat Cover Letter G:\MADISON ENGINEERING\PROJECTS\2018\18-127 Nexus Point\Application\Subdivision\Final Plat\001 Final Plat Cover Letter.doc May 19th, 2023 City of Bozeman Planning Department 20 East Olive Bozeman, MT 59715 RE: Nexus Point Subdivision Final Plat Submittal Dear City of Bozeman: On behalf of our client, Nexus Point LLC, we are submitting the Final Plat Application for review for the proposed Nexus Point Subdivision. The proposed major subdivision consists of 11 lots and is located at approximately 2085 Arnold Street (West of South 19th Avenue and North of Graf Street). Included in this submittal package are the following items: Documents • 001 Cover Letter • 002 Notification Letter • 003 Final Plat Checklist FP • 004 City Fee Schedule • 005 Final Plat Written Narrative • 006 Public Park Easement • 007 Stormwater Maintenance Plan • 008 Stormwater Report (Drainage Exhibit included on page 53) • 009 Covenants Nexus Point Subdivision • 010 Agricultural Water Users Facility Easement • 011 Engineering Certified Letter • 012 Noxious Weed Information • 013 Platting Certificate • 014 Payback District Correspondence. • 015 Easement Exhibit Drainage Drawings • 001 C0.0 Cover • 002 C0.1 General Notes & Site Plan • 003 C2.0 Lantern Drive Plan & Profile • 004 C2.1 South 21st Avenue Plan & Profile • 005 C2.2 Arnold Street Plan & Profile • 006 C2.3 Arnold Street Plan & Profile • 007 C3.0 Lantern Lane Sewer Main • 008 C3.1 South 21st Avenue Sewer Main • 009 C3.2 South 19th Avenue Sewer Main • 010 C3.3 Arnold Street Sewer Main • 011 C3.4 Sewer Main Plan & Profile • 012 C3.5 Sewer Main Plan & Profile • 013 C3.6 Arnold Street Sewer Main • 014 C4.0 Lantern Lane Water Main 895 Technology Blvd. Suite 203 Bozeman, MT 59718 (406) 586-0262 (406) 586-5740 Fax • 015 C4.1 South 21st Avenue Water Main • 016 C4.2 Arnold Street Water Main • 017 C4.3 Water Main Plan & Profile • 018 C4.4 Water Main Plan & Profile • 019 C6.0 Water & Sewer Details • 020 C6.1 Typical Details • 021 C6.2 Structure Details • 022 LS1.1 Lantern Park S. Side • 023 LS2.1 Lantern Park S. Side • 024 LS3.1 Lantern Park S. Side • 025 LS4.1 Lantern Park S. Side • 026 LS4.2 Lantern Park S. Side • 027 LS5.1 Lantern Park S. Side • 028 LS6.1 Lantern Park S. Side • 029 LS6.2 Lantern Park S. Side • 030 Final Plat Certificates • 031 Final Plat Lot Layout • 032 Final Plat Conditions of Approval Application Fee of $4,071.00 to be provided by Check. (Major Sub Fee = $3,631.00, 11 Lots = $40.00 per lot) A letter from City Engineer is to be provided after As-Builts are approved. Please review the submitted material at your earliest convenience. If you have any questions please feel free to contact us at 586-0262. Sincerely: ____________________________ Erik Ringsak, EI, CMI cc: Nexus Point LLC