Loading...
HomeMy WebLinkAbout23033 Approval LetterPage 1 of 2 July 28, 2023 via Project Dox only TO: Jeremy May, Headwaters Engineering Adam Lamb, Flood Gates LLC/Urban Villas Condo Master RE: Application 23033: Urban Villas Site Plan located at the southwest corner of Catalyst Street and North 27th Avenue on Lot 3A, Block 2 of the Amended Plat of Phase 3 of Cattail Creek Subdivision, J-415A, Section 35, Township 1 South, Range 5 East, PMM, City of Bozeman, Gallatin County, MT. Dear Applicants: The Site Plan application for the residential development to be located at the above-referenced property has been conditionally approved. Please see the Staff Report attached to the Project Dox City Documents folder for this application. The Staff Report contains the analysis, and code provisions related to this approval. The conditions of approval of this site plan are as follows: CONDITIONS OF APPROVAL 1. There were previously addresses assigned, taxes assessed, and units bought and sold, in this development per the condo declarations that were recorded, Clerk and Recorder document #2298018, on April 23, 2008. Those will need to be removed before new addresses can be assigned. New addresses can't be assigned over something that was already legally declared. This will need to be cleared up prior to building permit application, as you will need the new addresses to apply for the new permits. 2. DSSP II.B – Storm Drainage Plan – Prior to building permit issuance, the regional HOA storm ponds must be rehabilitated to the capacity stated in the Applicant’s storm water design report. The rehabilitation must be to the satisfaction of the City of Bozeman Storm Water Department. 3. These conditions are in addition to any required code provisions identified in this report and noted below. Should additional conditions of approval and code corrections be required, the Director of Community Development will include them with the final report. Required Bozeman Municipal Code standards yet to be met are: CODE PROVISIONS 1. BMC 38.410.060 – Easements. All easements must be recorded in a form acceptable to the city. The draft release and reconveyance of the public access easement must be submitted for review and city signatures and filed with the County Clerk and Recorder prior to final site plan approval. Page 2 of 2 2. BMC 38.420.030.D – Parkland. Where a cash donation has been accepted in-lieu of land dedication the amount of cash donation must be stated on the final plan as appropriate. The cash in lieu of parkland must be paid prior to final site plan approval. A CILP memo has been added to the city documents folder. The amount will be assessed in Naviline. Payment is due prior to final site plan approval. 3. BMC 38.410.130. Water Adequacy: The existing CILWR credit of 12.11 acre-feet (AF) for the property, obtained at the time of subdivision, is sufficient to cover the development's demand of 5.90 AF. There will be a remaining credit of 6.21 AF running with the property after site plan approval is received. 4. BMC 38.270.070C.4. Special Improvement Districts (SID). Submit a copy of the recorded SID waiver prior to final site plan approval. As the Applicant, you must comply with all provisions of the Bozeman Municipal Code (BMC), which are applicable to this project. All unmet code provisions, or code provisions that are not specifically listed as conditions of approval, does not, in any way, create a waiver or other relaxation of the lawful requirements of the Bozeman Municipal Code or state law. Future Impact Fees - Building permit applications will require payment of the required transportation, water, sewer, and fire impact fees according to the City of Bozeman adopted impact fee schedule in place at the time of building permit issuance. If you desire an estimate of the required impact fees according to current rates, please contact Mr. Chris Saunders of the Department of Community Development at csaunders@bozeman.net and please reference the 21354-project number on any such correspondence. Please be informed that ANY changes from the approved Site Plan must be reviewed by the Department of Community Development prior to implementation or construction; such change may require submittal of a formal Modification application per BMC 38.230.150.B. This Director of Community Development conditional-approval of the subject site plan may be appealed filing a notice of appeal with the Clerk of the Commission for the City of Bozeman, within ten working days after the date of approval as evidenced by the Director’s signature on the staff report, by following the procedures of Section 38.250.030, BMC. If you have questions, or if the Department of Community Development can be of further assistance, please contact your Development Review Coordinator, Diane Tolhurst, at 406-582- 2938 or dtolhurst@bozeman.net. Sincerely, Susana Montana, Senior Planner