HomeMy WebLinkAbout015 RTank Construction EquipmentSUBGRADE / EXCAVATION LINE: COMPACT PER SPEC SECTION 3.02 D. A BEARING CAPACITY OF 2,000 PSF MUST BE ACHIEVED PRIOR TO INSTALLING R-TANKHD OR R-TANKSD NOTES: 1.FOLLOWING PLACEMENT OF SIDE BACKFILL, A UNIFORM 12” LIFT OF THE FREELY DRAINING MATERIAL (SPEC SECTION 2.03 B2) SHALL BE PLACED OVER THE R-TANK AND LIGHTLY COMPACTED USING A WALK-BEHIND TRENCH ROLLER. ALTERNATELY, A ROLLER (MAXIMUM GROSS VEHICLE WEIGHT OF 6 TONS) MAY BE USED. ROLLER MUST REMAIN IN STATIC MODE UNTIL A MINIMUM OF 24” OF COVER HAS BEEN PLACED OVER THE MODULES. SHEEP FOOT ROLLERS SHOULD NOT BE USED. SPEC SECTION 3.05 A5 2.ONLY LOW PRESSURE TIRE OR TRACK VEHICLES (LESS THAN 7 PSI AND OPERATING WEIGHT OF LESS THAN 20,000 LBS) SHALL BE OPERATED OVER THE R-TANK SYSTEM DURING CONSTRUCTION. SPEC SECTION 3.05 A5 3.DUMP TRUCKS AND PANS SHALL NOT BE OPERATED WITHIN THE R-TANK SYSTEM AT ANY TIME. WHERE NECESSARY, THE HEAVY EQUIPMENT SHOULD UNLOAD IN AN AREA ADJACENT TO THE R-TANK SYSTEM AND THE MATERIAL SHOULD BE MOVED OVER THE SYSTEM WITH TRACKED EQUIPMENT. SPEC SECTION 3.05 A5 4.ENSURE THAT ALL UNRELATED CONSTRUCTION TRAFFIC IS KEPT AWAY FROM THE LIMITS OF EXCAVATION UNTIL THE PROJECT IS COMPLETE AND FINAL SURFACE MATERIALS ARE IN PLACE. NO NON-INSTALLATION RELATED LOADING SHOULD BE ALLOWED OVER THE R-TANK SYSTEM UNTIL THE FINAL DESIGN SECTION HAS BEEN CONSTRUCTED (INCLUDING PAVEMENT). SPEC SECTION 3.05 B 5.SEE R-TANK INSTALLATION GUIDE OR CONTACT YOUR LOCAL ACF WEST REPRESENTATIVE FOR ADDITIONAL INFORMATION. 4" BASE MIN. 24" MIN. COVER (SEE NOTE 1) SMOOTH DRUM ROLLER VIBRATORY MODE (6 TON MAX, SEE NOTE 1) 24" MIN. PERIMETER BACKFILL MATERIAL UNLOADED OUTSIDE OF THE SYSTEM EXCAVATION AREA DUMP TRUCKS AND PANS SHALL NOT OPERATE OVER THE SYSTEM EXCAVATION AREA DUMP TRUCK DETAIL (SEE NOTE 3) LOW GROUND PRESSURE DOZER (10 TON MAX, SEE NOTE 2) SMOOTH DRUM ROLLER STATIC MODE (6 TON MAX, SEE NOTE 1) 4" TOPSOIL WEARING COURSE (OPTIONAL) 12" MIN. COVER (SEE NOTES 1 & 2) NOTE: COVER BACKFILL MATERIAL MAY BE EITHER STONE OR SAND (SPEC SECTION 2.03 B1) OR A BLEND OF AASHTO #57 STONE WITH 30-40% (BY VOLUME) TOPSOIL TO AID IN ESTABLISHING VEGETATION (SPEC SECTION 2.03 B2). CONSTRUCTION EQUIPMENT COVER DETAIL - GREEN SPACE R-TANKHD OR R-TANKSD UNITS HD: LOAD RATING: 33.4 PSI (MODULE ONLY) SD: LOAD RATING: 42.9 PSI (MODULE ONLY) R-TANK SYSTEM R-TANK SYSTEM DRAWN BY SHEET NO. TDS 6FOR ADDITIONAL INFORMATION PLEASE CONTACT:ACF WEST, 1-800-423-4567, www.acfwest.com01/09/2023 ENGINEER OF RECORD TO REVIEW, APPROVEAND ENDORSE FINAL SITE SPECIFIC DESIGN.of DATE 23-001MT ACF WEST PROJECT NUMBER 5R-TANKHD CONSTRUCTION EQUIPMENT COVER DETAILTPS-FFISBOZEMAN, MTSITE DESIGNATION: UGDS