Loading...
HomeMy WebLinkAbout165_A201_Building X-6-Elevations_Rev 1_2309203.5:12 SLOPE12:12 SLOPE128128124126124SINGLE HUNGVINYL WINDOW3/8" SMARTSIDEVERTICAL EXTERIORPANEL WITH BATTENSTRIPS AT 16" O.C.FRONT STOOP BRACKETSWITH OVERHANG ABOVE4/4" x 3" CORNER BOARDTRIM, TYPICAL UNLESSNOTED OTHERWISESINGLE HUNGVINYL WINDOW3/8" SMARTSIDE VERTICALEXTERIOR PANEL WITHBATTEN STRIPS AT 16" O.C.CENTER BATTENTO GABLEDECORATIVE FAUXLOUVRESIDE YARD STOOP BRACKETSWITH OVERHANG ABOVE10' 1-1/8"1'-6 3/4"9' 1-1/8"0'-0" FINISH FLOOR20'-9" TOP OF2ND LEVEL PLATE11' 7-7/8" T.O. 2NDLEVEL SUBFLOOR10' 1-1/8" TOP OF1ST LEVEL PLATE0'-0" FINISH FLOOR20'-9" TOP OF2ND LEVEL PLATE11' 7-7/8" T.O. 2NDLEVEL SUBFLOOR10' 1-1/8" TOP OF1ST LEVEL PLATE3.5:12 SLOPE12:12 SLOPE128128124126124SINGLE HUNGVINYL WINDOWFRONT STOOP BRACKETSWITH OVERHANG ABOVE4/4" x 3" CORNER BOARDTRIM, TYPICAL UNLESSNOTED OTHERWISESINGLE HUNGVINYL WINDOW3/8" SMARTSIDEVERTICAL EXTERIORPANEL WITH BATTENSTRIPS AT 16" O.C.CENTER BATTENTO GABLEDECORATIVE FAUXLOUVRESIDE YARD STOOP BRACKETSWITH OVERHANG ABOVE3/8" SMARTSIDE VERTICALEXTERIOR PANEL WITHBATTEN STRIPS AT 16" O.C.10' 1-1/8"1'-6 3/4"9' 1-1/8"0'-0" FINISH FLOOR20'-9" TOP OF2ND LEVEL PLATE11' 7-7/8" T.O. 2NDLEVEL SUBFLOOR10' 1-1/8" TOP OF1ST LEVEL PLATE0'-0" FINISH FLOOR20'-9" TOP OF2ND LEVEL PLATE11' 7-7/8" T.O. 2NDLEVEL SUBFLOOR10' 1-1/8" TOP OF1ST LEVEL PLATELV TAPBOXLOADCENTERCL4'-0"3'-0"SERVICE CONDUITLOW VOLTAGE VARIES5' 0" - 6' 0"AF GRADEFINISH FLOORFLASHING ATTOP OF TRIM5/4 x 4 TRIM BOARDSIDING5/4 x 4 TRIM BOARD5/4 x 4 TRIM BOARDSIDING A2011A2016 Unit- Rowhouse Side Elevation3/16" = 1'-0"2A2016 Unit- Rowhouse Side Elevation3/16" = 1'-0"METER BANK PER DETAIL 3; SEE CIVIL FOR LOCATION;SEE LANDSCAPE FOR SCREENINGCONDENSING UNIT; SEE LANDSCAPEFOR SCREENING3A201TYP METER DETAIL1/2" = 1'-0"THIS DRAWING IS THE PROPERTY OF NEQUETTE ARCHITECTS, INC. NO PERMISSIONS ARE GRANTED TO REUSE, REPRODUCE, OR ALTER, UNLESS GRANTED IN WRITING FOR A SPECIFIC PURPOSE BY NEQ.COTTAGES AT BOZEMAN BOZEMAN, MT NEQUETTE PROJECT NUMBER: 20048DISTRIBUTION LOG11/04/22DD SUBMISSION07/19/2380% CD PRICING SET11111109/20/23REV. #1 - SP-RC Comment Response11111