Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
61_A2.5_ROOF PLAN_03122021
CGCGCGCGCGCGTV DS S D D D D WAP WAP WAP WAP WAP WAP WAP WAP WAPWAP WPF FOSSFF WPF 1 A5.2 1 A5.1 1 2 3 4 5 6 7 8 A B C D MEMBRANE ROOF 2 A5.1 3 A5.1 4 A5.1 RIDGE FUTURE PV ARRAY @ MEMBRANE ROOF RD RD RIDGE SOLAR WALLSOLAR WALL 11' - 3 3/32"6' - 4"10' - 0"5' - 0"5' - 0"10' - 0"10' - 0"10' - 0"10' - 0"10' - 0"72' - 0"24' - 0"24' - 0"24' - 0"210' - 0" 30' - 0"30' - 0"30' - 0"30' - 0"30' - 0"30' - 0"30' - 0" FUTURE PV AREA (3,500 SF TOTAL) 1 A6.1 2 A6.1 3 A6.1 3 A6.2 2 A6.2 5 A6.2 4 A6.2 1 A6.2 R-1 R-15" / 1'-0"5" / 1'-0"5' - 0"10' - 0"10' - 0"5' - 0"5' - 0"10' - 0"10' - 0"1/4" / 1'-0" +/-1/4" / 1'-0" MIN 1/4" / 1'-0" +/-1/4" / 1'-0" +/-1/4" / 1'-0" MIN1/4" / 1'-0" +/- OVERFLOW SCUPPER OVERFLOW SCUPPER GUTTER 07 6200GUTTER 07 6200 GUTTER 07 6200 GUTTER 07 6200 DOWNSPOUT 07 6200 DOWNSPOUT 07 6200 DOWNSPOUT 07 6200 DOWNSPOUT 07 6200 DOWNSPOUT 07 6200 2 A2.6 3 A7.1 5 A2.6 9 A2.6 10 A2.6 11 A2.6 13 A2.6 METAL PERF PANEL 2 07 4213 METAL PERF PANEL 2 07 4213 2 A8.14 MTL ROOF PANEL 1 07 4113 GUTTER 07 6200 DOWNSPOUT 07 6200 DOWNSPOUT 07 6200 DOWNSPOUT 07 6200 DOWNSPOUT 07 6200 8' - 8"SKYLIGHT 08 6200 SKYLIGHT 08 62006' - 4"24' - 0"90' - 0" FUTURE PV AREA (3,500 SF TOTAL) 1 A5.2 4 5 6 7 B C 3 A5.1 90' - 0"24' - 0"VAV UNIT (4,000LBS)MECH.L MEZZ. 300 MEMBRANE ROOF DNOPEN TO LEVEL 2 LOBBY BELOWOPEN TO LEVEL 2 LOBBY BELOW3 A6.1 E-2 E-2 3 A7.1 11 A2.6 2 A8.14 300aR-2:MECH. FASTENED MEMBRANE ROOF • STL BEAMS, SSD • CONC. & MTL DECKING, SSD • 4" CONTINUOUS POLYISO INSULATION • TAPERED INSULATION, 1" MIN. • COVERBOARD, ADHERED • MEMBRANE ROOFING, MECHANICALLY FASTENED R-3:FULLY ADHERED MEMBRANE ROOF • STL BEAMS, SSD • CONC. & MTL DECKING, SSD • 4" CONTINUOUS POLYISO INSULATION • TAPERED INSULATION, 1" MIN. • COVERBOARD, ADHERED • MEMBRANE ROOFING, FULLY ADHERED R-1:METAL ROOF • STL BEAMS, SSD • 10 1/4" SIPS PANEL, SSD (06 1200) -FOAM CONTROL MAX R-VALUE AT 40 DEG F:28 • CONTINUOUS SELF ADHERING 45mil POLYMER- MODIFIED ASPHALT UNDERLAYMENT (07 31 13) • CORRUGATED MTL ROOFING (07 4113) ROOF ASSEMBLIES R-1 R-2 R-3 3 4 7 D 2 A5.1 4 A5.1 1/4" / 1'-0" MIN 1/4" / 1'-0" MIN3/8" / 1'-0" +/-O.F.RD O.F.RD1/4" / 1'-0" MIN3/8" / 1'-0" +/-3/8" / 1'-0" +/- ROOFTOP PAVERS TO BE INSTALLED OVER TERRACE. PAVERS NOT SHOWN IN THIS VIEW SEE, FINISH FLOOR PLAN FOR PAVER LAYOUT. 9 A2.6 10 A2.6 A2.6 3 30' - 0"19' - 10 3/4"11' - 10 3/4"DATE: This drawing is not intended nor shall it be used for construction purposes unless the signed professional stamp of a registered architect employed by Comma-Q Architecture, Inc. is affixed above. PROJECT #: CONSULTANTS REVISIONS ORIGINAL DRAWING SIZE: 24" x 36"Q:\Jobs19\22 HRDC - Griffin Dr\4 DD\Drawings\Revit\CFGP South Building_mg.rvtSOUTH BUILDINGCOMMUNITY FIRST GRIFFIN PLACE03-12-2021 A2.5 19-22 HRDC BOZEMANROOF PLAN SITE PLAN APPLICATION 206 EAST GRIFFIN DR, BOZEMAN MT1/8" = 1'-0"A2.5 ROOF PLAN1 1/8" = 1'-0"A2.5 MECHANICAL MEZZANINE2 ROOF PLAN NOTES: 1/8" = 1'-0"A2.5 ROOF PLAN - TERRACE3 No. Description Date