Loading...
HomeMy WebLinkAbout58_A1.4_SITE DETAILS_03122021WIL WIL WILTVWAP WAP WAP S H 1 2 3 4 5 6 7 8 D 7 A1.4 A1.4 4 AREA DESIGNATED FOR FUTURE PLAYGROUND EQUIP. COVERED BICYCLE PARKING GRAVEL BUFFERGRAVEL BED & PLANTINGS BENCHES COVERED & ENCLOSED EXTERIOR COURTYARD GRAVEL BED & PLANTINGS ALTERNATE: SW EXTERIOR ENCLOSED & COVERED COURTYARD -FULLY ENCLOSED -CONC. STEM WALL -CORRUGATED, PERFORATED MTL ROOFING -CORRUGATED, PERFORATED MTL WALL PANELS -STEEL ROOF STRUCTURE -STL POSTS & SCREEN FRAME -(1) MAN DOOR -(2) SLIDING TRACK DOORS SLIDER DOOR & TRACK SLIDER DOOR & TRACK MAN DOOR 6' - 0"10' - 0"5' - 0"GRAVEL BED & PLANTINGS COURTYARD WALL & ROOF SCREENING 40' - 6" COURTYARD WALL & ROOF SCREENING 90' - 9" SYNTHETIC TURF ROOF ABOVE ROOF ABOVE ROOF ABOVE ROOF ABOVE ALTERNATE: SE EXTERIOR COVERED COURTYARD -PARTIALLY ENCLOSED -CONC. STEM WALL -CORRUGATED, PERFORATED MTL ROOFING -CORRUGATED, PERFORATED MTL WALL PANELS -STEEL ROOF STRUCTURE -STL POSTS & SCREEN FRAME A1.4 3 A1.46 A1.45A1.4 59' - 8"14' - 1"14' - 1"STL POST, TYP. BLDG OVERHANG ABOVE BLDG OVERHANG ABOVE 4 A6.2 1 2 3 4 5 6 7 8 D 7 A1.4 EXPOSED STRUCTURE METAL PERF PANEL 2 07 4213 MTL ROOF PANEL 1 07 4113 METAL PERF PANEL 2 07 4213 EXPOSED STRUCTURE MTL ROOF PANEL 1 07 4113 METAL PERF PANEL 2 07 4213 MTL ROOF PANEL 1 07 4113 METAL PERF PANEL 2 07 421314' - 4"ALTERNATE: SW EXTERIOR ENCLOSED & COVERED COURTYARD -FULLY ENCLOSED -CONC. STEM WALL -CORRUGATED, PERFORATED MTL ROOFING -CORRUGATED, PERFORATED MTL WALL PANELS -STEEL ROOF STRUCTURE -STL POSTS -(1) MAN DOOR -(2) SLIDING TRACK DOORS ALTERNATE: SE EXTERIOR COVERED COURTYARD -PARTIALLY ENCLOSED -CONC. STEM WALL -CORRUGATED, PERFORATED MTL ROOFING -CORRUGATED, PERFORATED MTL WALL PANELS -STEEL ROOF STRUCTURE -STL POSTS14' - 4"2 3 4 5 6 7 MTL PERF PANEL 2 07 4213 MTL PERF PANEL 2 07 4213 1' - 6"8' - 5"CONC. WALL (BEHIND MTL SCREEN) STL TUBE FRAMING (BEHIND MTL SCREEN) STL TUBE ROOF FRAMING & MTL ROOFING CONC. WALL (BEHIND MTL SCREEN) STL TUBE FRAMING (BEHIND MTL SCREEN) STL TUBE ROOF FRAMING & MTL ROOFING STRUCTURAL STL FRAMING @ PERF. MTL PANEL, PAINTED. OPEN TO COURTYARD BEYOND OPEN TO COURTYARD BEYOND D MTL PERF PANEL 2 07 4213 SLIDING TRACK DOOR 9' - 8"CONC. WALL (BEHIND MTL SCREEN) STL TUBE FRAMING (BEHIND MTL SCREEN) STL TUBE ROOF FRAMING & MTL ROOFING D CONC. WALL (BEHIND MTL SCREEN) STL TUBE FRAMING (BEHIND MTL SCREEN) STL TUBE ROOF FRAMING & MTL ROOFING MAN DOOR 3' - 9" SLIDING TRACK DOOR 9' - 8" MTL PERF PANEL 2 07 4213 STL TUBE FRAMING (BEHIND MTL SCREEN), PAINTED. STL TUBE ROOF FRAMING & MTL ROOFING MTL PERF PANEL 2 07 4213 MTL ROOF PANEL 1 07 4113 METAL PERF PANEL 2 07 4213 BIKE RACK BENCH OPEN TO COURTYARD BEYOND 1' - 6"8' - 5"0' - 2"STL CHANNEL PURLIN STL W-BEAM STL W-COLUMN STL TUBE FRAME MTL PERF PANEL 2 07 4213 CONC. STEM WALL 0' - 6" METAL PERF PANEL 2 07 4213 DATE: This drawing is not intended nor shall it be used for construction purposes unless the signed professional stamp of a registered architect employed by Comma-Q Architecture, Inc. is affixed above. PROJECT #: CONSULTANTS REVISIONS ORIGINAL DRAWING SIZE: 24" x 36"Q:\Jobs19\22 HRDC - Griffin Dr\4 DD\Drawings\Revit\CFGP South Building_mg.rvtSOUTH BUILDINGCOMMUNITY FIRST GRIFFIN PLACE03-12-2021 A1.4 19-22 HRDC BOZEMANSITE DETAILS SITE PLAN APPLICATION 206 EAST GRIFFIN DR, BOZEMAN MT1/8" = 1'-0"A1.4 SITE PLAN - COUTYARD ENCLOSURES GROUND LEVEL PLAN1 1/8" = 1'-0"A1.4 SITE PLAN - COURTYARD ENCLOSURES ROOF PLAN2 1/8" = 1'-0"A1.4 SCREEN ENCLOSURE - SOUTH ELEVATION3 1/8" = 1'-0"A1.4 SCREEN ENCLOSURE - WEST ELEVATION4 1/8" = 1'-0"A1.4 SCREEN ENCLOSURE - EAST ELEVATION6 1/8" = 1'-0"A1.4 SCREEN ENCLOSURE - EAST & WEST OPEN ENDS5 1/2" = 1'-0"A1.4 EXTERIOR COURTYARD WALL SECTION 17 NOTE: SOUTHWEST AND SOUTHEAST COURTYARD ENCLOSURES ARE ALTERNATES TO THE SOUTH BUILDING PROJECT AND MAY NOT BE INCLUDED IN PROJECT. COURTYARD ELEVATIONS HAVE BEEN INCLUDED TO SHOW COMPLIANCE WITH SITE PLAN APPROVAL PROCESS.No. Description Date