Loading...
HomeMy WebLinkAbout56_A1.2_SITE PLAN -SOUTH BUILDING_03122021SS D D D D D DDD D SPR SPR SPR WIL WIL 8' WIL WIL SPR SPR WIL WIL WIL 8' 8' WIL WIL WIL GRASS LAWN; SEE LANDSCAPE PLAN CONC. SIDEWALK; SCD N OR T H- S OUT H P E D E ST R I A N COR RI D ORDONATION DROP-OFF AREA DESIGNATED FOR FUTURE PLAYGROUND EQUIP. UTILITY METER SCREEN WALL FDCGRAVEL BUFFER;SLD GRAVEL GROUND COVER; SEE LANDSCAPE DRWGS GRAVEL BUFFERBLDG SIGNAGE & SCREEN GRAVEL BED & PLANTINGS BENCHES CONC. SIDEWALK CONC. SIDEWALK;SCDSOUTH BUILDING 206 EAST GRIFFIN DRIVE (14,500 SF BLDG FOOTPRINT) SHELTER BLDG ENTRANCE RESOURCE HUB BLDG ENTRANCE SERVICE ENTRANCE FIRE RISER & MECH ROOM CHILLER BIKE RACKS EXTERIOR STORAGE AREA W/ BARN DOOR ACCESS DUMPSTER ENCLOSURE; SEE NORTH BLDG SITE PLAN & DETAILS NORTH BUILDING GREASE INTERCEPTORDUMPSTERDUMPSTERDUMPSTER(SEE NORTH BUILDING DRWGS) PARKING; SEE CIVIL DRWGS STORM WATER BASINSNOW STORAGE GRASS LAWN; SEE LANDSCAPE PLAN GRASS LAWN; SEE LANDSCAPE PLAN GRASS LAWN; SEE LANDSCAPE PLAN BENCHNORTH-SOUTH PEDESTRIAN CORRIDORTRANSFORMER & PAD DS; CONNECT TO SD, SCD (TYP) BUILDING OVERHANG 8' - 0"4' - 0"6' - 0"10' - 0"8' - 0"8' - 0" 12' - 0" 8' - 0" PHASE 1: NORTH BLDG & NORTH SITE PHASE 2: SOUTH BLDG & SOUTH SITE A1.3 4 MECHANICAL CHILLER ENCLOSURE; SEE SITE DETAILS.5' - 0"5' - 0" 5' - 0" 4' - 0"5' - 0" GRAVEL BED & PLANTINGS CONC. PAVING CONC. PAVING 8' - 0"10' - 0"10' - 0"4' - 0"4' - 0"3' - 0"3' - 2"4' - 0"SW ENTRY COURTYARD SE ENTRY COURTYARD OPEN SPACE PERIMETER OPEN SPACE PERIMETER FIRE HYDRANT; SCD FIRE HYDRANT; SCD 108' - 0"39' - 0"29' - 6"41' - 0" SITE LIGHTING; SEE ELEC DRWGS SITE LIGHTING; SEE ELEC DRWGS E L E C . E A S EME NT S ID E S E TB A C K 3' - 0"P R OP E RT Y LI N E STAFF PARKING LOT SOUTH PARKING LOT FLEET PARKING D R IV E A IS LE26' - 0"12' - 0"6' - 0"CONC. SIDEWALK; SCD PROPERTY LINEPROPERTY LINE SETBACK VISION TRIANGLE EASEMENT WATER MAIN SEWER MAIN STORM DRAIN MAIN FRANCHISE UTILITIES (POWER, GAS, COMM) EXISTING OVERHEAD POWER LINE CONCRETE SURFACING OR SIDEWALK PEDESTRIAN CORRIDOR: *ACCENTED SURFACING OR SIDEWALK BUILDING FOOTPRINT BUILDING OVERHANG ASPHALT PAVING SNOW STORAGE AREA BENCHES FIRE HYDRANT BIKE RACKS NEW TREE EXISTING TREE TO REMAIN NEW SHRUB / PLANTINGS TRANSFORMER GREASE TRAP / INTERCEPTOR PHASE 1 AND PHASE 2 DEMARCATION LINE GT OPEN SPACE AREA; SEE SOUTH BLDG SITE PLAN SITE LIGHTING DATE: This drawing is not intended nor shall it be used for construction purposes unless the signed professional stamp of a registered architect employed by Comma-Q Architecture, Inc. is affixed above. PROJECT #: CONSULTANTS REVISIONS ORIGINAL DRAWING SIZE: 24" x 36"Q:\Jobs19\22 HRDC - Griffin Dr\4 DD\Drawings\Revit\CFGP South Building_mg.rvtSOUTH BUILDINGCOMMUNITY FIRST GRIFFIN PLACE03-12-2021 A1.2 19-22 HRDC BOZEMANSITE PLAN - SOUTH BUILDING SITE PLAN APPLICATION 206 EAST GRIFFIN DR, BOZEMAN MT1/16" = 1'-0"A1.2 ARCHITECTURAL SITE PLAN - SOUTH BUILDING1 SITE PLAN LEGEND SITE PLAN NOTES: 1. SEE OVERALL SITE PLAN FOR GENERAL SITE INFO. 2. SEE NORTH BUILDING SITE PLAN & DETAILS FOR INFO RELATED TO THE DUMPSTER ENCLOSURE. 3. FOR ALTERNATE DESIGN OF EXTERIOR COURTYARD ENCLOSURES , SEE SHEET A1.4 -SITE DETAILS FOR INFO. 4. SOUTH BLDG AND SOUTH SITE ARE DESIGNATED AS "PHASE 2" AS ILLUSTRATED BY THE DEMARCATION LINE. No. Description Date