Loading...
HomeMy WebLinkAbout15_C4.0_DRAINAGE_PLAN_06012021GRIFFIN DRIVEPROJECT SITE5.24 ACRESNORTH BUILDING27,089 SF FOOTPRINT202 E. GRIFFIN DR.SOUTH BUILDING14,500 SF FOOTPRINT206 E. GRIFFIN DR.MONTANA RAIL LINKSOUTH RETENTION BASINTOP ELEV: 4721.50TOP AREA: 1,270 SFBOTTOM AREA:416 SFBOTTOM ELEV: 4720.50PONDING DEPTH: 1 FTPONDING STORAGE: 843 CFGRAVEL STORAGE: 116 CFTOTAL STORAGE VOLUME: 959 CFNORTH RETENTION BASINBASIN TOP ELEV: 4718.50BASIN TOP AREA: 9,155 SFBASIN BOTTOM ELEV: 4717.00BASIN BOTTOM AREA: 6,208 SFPONDING DEPTH: 1.5 FTPONDING STORAGE: 11,522 CFGRAVEL STORAGE: 849 CFTOTAL STORAGE VOLUME: 12,371 CFPHASE 1PHASE 2C4.0 DRAINAGE PLANPROFESSIONALENGINEERS &SURVEYORSCOMMUNITY FIRST GRIFFIN PLACE STAHLYENGINEERING& ASSOCIATESHRDC 202 & 206 EAST GRIFFIN DR. BOZEMAN, MT