HomeMy WebLinkAbout02_A.02_SITE_DIAGRAMS_&_RELATED_INFO_06012021UNDERGROUND STORM CHAMBER SYSTEM
SPR
SPR
SPR
WIL
WIL
8'
WIL
WIL
SPR
SPR
WIL
WIL
WIL
WIL
WIL
WIL
8'
WILWIL
WIL WIL
WIL
8'8'
WIL
WIL
WIL
8'
8'
8'
8'WIL
WILWIL
UNDERGROUND STORM CHAMBER SYSTEM
SPR
SPR
SPR
WIL
WIL
8'
WIL
WIL
SPR
SPR
WIL
WIL
WIL
WIL
WIL
WIL
8'
WILWIL
WIL WIL
WIL
8'8'
WIL
WIL
WIL
8'
8'
8'
8'WIL
WIL
WIL
UNDERGROUND STORM CHAMBER SYSTEM
SPR
SPR
SPR
WIL
WIL
8'
WIL
WIL
SPR
SPR
WIL
WIL
WIL
WIL
WIL
WIL
8'
WILWIL
WIL WIL
WIL
8'8'
WIL
WIL
WIL
8'
8'
8'
8'WIL
WIL
WIL
UNDERGROUND STORM CHAMBER SYSTEM
SPR
SPR
SPR
WIL
WIL
8'
WIL
WIL
SPR
SPR
WIL
WIL
WIL
WIL
WIL
WIL
8'
WILWIL
WIL WIL
WIL
8'8'
WIL
WIL
WIL
8'
8'
8'
8'WIL
WILWIL
UNDERGROUND STORM CHAMBER SYSTEM
SPR
SPR
SPR
WIL
WIL
8'
WIL
WIL
SPR
SPR
WIL
WIL
WIL
WIL
WIL
WIL
8'
WILWIL
WIL WIL
WIL
8'8'
WIL
WIL
WIL
8'
8'
8'
8'WIL
WILWIL
UNDERGROUND STORM CHAMBER SYSTEM
SPR
SPR
SPR
WIL
WIL
8'
WIL
WIL
SPR
SPR
WIL
WIL
WIL
WIL
WIL
WIL
8'
WILWIL
WIL WIL
WIL
8'8'
WIL
WIL
WIL
8'
8'
8'
8'WIL
WIL
WIL
SOUTH BUILDING
NORTH BUILDING
EAST GRIFFIN DRIVE
GUEST & STAFF VEHICLE
CIRCULATION
SERVICE ACCESS, DROP-OFF
AND STAFF USE
DROP-OFF LANE & LOADING
DOCK AREA
BUS STOP ON GRIFFIN DR
STREET VISION TRIANGLE
NORTH BUILDING
EAST GRIFFIN DRIVE
TRASH AND RECYCLING
SERVICE CIRCULATION
DUMPSTER ACCESS BY STAFF
SNOW STORAGE AREA
SOUTH BUILDING
NORTH BUILDING
EAST GRIFFIN DRIVE
EMERGENCY ACCESS CIRCULATION
FIRE HYDRANT
FIRE RISER ROOM
SOUTH BUILDING
FIRE DEPARTMENT CONNECTION
NORTH BUILDING
EAST GRIFFIN DRIVE
PRIMARY PEDESTRIAN CORRIDOR
SECONDARY PEDESTRIAN ACCESS
REQUIRED OPEN SPACE: 6,290 SF (170 BEDS x 37 SF)
• 6,390 SF PROVIDED @ SOUTH BLDG
(SEE OPEN SPACE CALCS ON SHEET A.01)
SOUTH BUILDING
NORTH BUILDING
EAST GRIFFIN DRIVE
PARKING LOT VEHICLE
ACCESS & CIRCULATION
PARKING LOTS:
• NORTH: 58 SPACES
• STAFF (CENTRAL): 19 SPACES
• SOUTH: 53 SPACES
• FLEET: 6 SPACES
NORTH
STAFF
FLEET
SOUTH
SOUTH BUILDING
NORTH BUILDING
EAST GRIFFIN DRIVE
WATER
UNDERGROUND STORM WATER / DRAINS
STORM WATER RETENTION AREA
SEWER
FRANCHISE UTILITIES
EXISTING OVERHEAD ELEC
SOUTH BUILDING
SITE PLAN UPDATED TO INCLUDE CIVIL, LANDSCAPE, SITE LIGHTING, AND
ARCHITECTURAL SITE-RELATED REVISIONS & CORRECTIONS.
R1
DATE:
This drawing is not intended nor shall it be
used for construction purposes unless the
signed professional stamp of a registered
architect employed by Comma-Q
Architecture, Inc. is affixed above.
PROJECT #:
CONSULTANTS
REVISIONS
ORIGINAL DRAWING SIZE: 24" x 36"BIM 360://CQ19-22 - Community First Griffin Place/CQ19-22 - Community First Griffin Place_Central - 2020.rvtCOMMUNITY FIRST GRIFFIN PLACE06-01-2021
A.02
19-22 HRDC BOZEMANSITE DIAGRAMS &
RELATED INFO
SITE PLAN
APPLICATION 202 & 206 EAST GRIFFIN DR, BOZEMAN MT1" = 80'-0"A.02
VEHICULAR CIRCULATION1
1" = 80'-0"A.02
TRASH ENCLOSURE ACCESS & SNOW STORAGE5
1" = 80'-0"A.02
FIRE & EMERGENCY ACCESS4
1" = 80'-0"A.02
PEDESTRIAN CIRCULATION & OPEN SPACE2
1" = 80'-0"A.02
PARKING ACCESS & CIRCULATION3
1" = 80'-0"A.02
UTILITIES & STORM WATER RETENTION6
No. Description Date
R1 RC Submittal 6-01-21