Loading...
HomeMy WebLinkAbout02_A.02_SITE_DIAGRAMS_&_RELATED_INFO_06012021UNDERGROUND STORM CHAMBER SYSTEM SPR SPR SPR WIL WIL 8' WIL WIL SPR SPR WIL WIL WIL WIL WIL WIL 8' WILWIL WIL WIL WIL 8'8' WIL WIL WIL 8' 8' 8' 8'WIL WILWIL UNDERGROUND STORM CHAMBER SYSTEM SPR SPR SPR WIL WIL 8' WIL WIL SPR SPR WIL WIL WIL WIL WIL WIL 8' WILWIL WIL WIL WIL 8'8' WIL WIL WIL 8' 8' 8' 8'WIL WIL WIL UNDERGROUND STORM CHAMBER SYSTEM SPR SPR SPR WIL WIL 8' WIL WIL SPR SPR WIL WIL WIL WIL WIL WIL 8' WILWIL WIL WIL WIL 8'8' WIL WIL WIL 8' 8' 8' 8'WIL WIL WIL UNDERGROUND STORM CHAMBER SYSTEM SPR SPR SPR WIL WIL 8' WIL WIL SPR SPR WIL WIL WIL WIL WIL WIL 8' WILWIL WIL WIL WIL 8'8' WIL WIL WIL 8' 8' 8' 8'WIL WILWIL UNDERGROUND STORM CHAMBER SYSTEM SPR SPR SPR WIL WIL 8' WIL WIL SPR SPR WIL WIL WIL WIL WIL WIL 8' WILWIL WIL WIL WIL 8'8' WIL WIL WIL 8' 8' 8' 8'WIL WILWIL UNDERGROUND STORM CHAMBER SYSTEM SPR SPR SPR WIL WIL 8' WIL WIL SPR SPR WIL WIL WIL WIL WIL WIL 8' WILWIL WIL WIL WIL 8'8' WIL WIL WIL 8' 8' 8' 8'WIL WIL WIL SOUTH BUILDING NORTH BUILDING EAST GRIFFIN DRIVE GUEST & STAFF VEHICLE CIRCULATION SERVICE ACCESS, DROP-OFF AND STAFF USE DROP-OFF LANE & LOADING DOCK AREA BUS STOP ON GRIFFIN DR STREET VISION TRIANGLE NORTH BUILDING EAST GRIFFIN DRIVE TRASH AND RECYCLING SERVICE CIRCULATION DUMPSTER ACCESS BY STAFF SNOW STORAGE AREA SOUTH BUILDING NORTH BUILDING EAST GRIFFIN DRIVE EMERGENCY ACCESS CIRCULATION FIRE HYDRANT FIRE RISER ROOM SOUTH BUILDING FIRE DEPARTMENT CONNECTION NORTH BUILDING EAST GRIFFIN DRIVE PRIMARY PEDESTRIAN CORRIDOR SECONDARY PEDESTRIAN ACCESS REQUIRED OPEN SPACE: 6,290 SF (170 BEDS x 37 SF) • 6,390 SF PROVIDED @ SOUTH BLDG (SEE OPEN SPACE CALCS ON SHEET A.01) SOUTH BUILDING NORTH BUILDING EAST GRIFFIN DRIVE PARKING LOT VEHICLE ACCESS & CIRCULATION PARKING LOTS: • NORTH: 58 SPACES • STAFF (CENTRAL): 19 SPACES • SOUTH: 53 SPACES • FLEET: 6 SPACES NORTH STAFF FLEET SOUTH SOUTH BUILDING NORTH BUILDING EAST GRIFFIN DRIVE WATER UNDERGROUND STORM WATER / DRAINS STORM WATER RETENTION AREA SEWER FRANCHISE UTILITIES EXISTING OVERHEAD ELEC SOUTH BUILDING SITE PLAN UPDATED TO INCLUDE CIVIL, LANDSCAPE, SITE LIGHTING, AND ARCHITECTURAL SITE-RELATED REVISIONS & CORRECTIONS. R1 DATE: This drawing is not intended nor shall it be used for construction purposes unless the signed professional stamp of a registered architect employed by Comma-Q Architecture, Inc. is affixed above. PROJECT #: CONSULTANTS REVISIONS ORIGINAL DRAWING SIZE: 24" x 36"BIM 360://CQ19-22 - Community First Griffin Place/CQ19-22 - Community First Griffin Place_Central - 2020.rvtCOMMUNITY FIRST GRIFFIN PLACE06-01-2021 A.02 19-22 HRDC BOZEMANSITE DIAGRAMS & RELATED INFO SITE PLAN APPLICATION 202 & 206 EAST GRIFFIN DR, BOZEMAN MT1" = 80'-0"A.02 VEHICULAR CIRCULATION1 1" = 80'-0"A.02 TRASH ENCLOSURE ACCESS & SNOW STORAGE5 1" = 80'-0"A.02 FIRE & EMERGENCY ACCESS4 1" = 80'-0"A.02 PEDESTRIAN CIRCULATION & OPEN SPACE2 1" = 80'-0"A.02 PARKING ACCESS & CIRCULATION3 1" = 80'-0"A.02 UTILITIES & STORM WATER RETENTION6 No. Description Date R1 RC Submittal 6-01-21