HomeMy WebLinkAbout01_A.01_COVER_SHEET_06012021M-1
B-2
R-3
M-1
M-2
R-4
PLI
PROPOSED SITE
LOCATION:
202 & 206 GRIFFIN DR
CONSTRUCTION
ROUTE ALONG
ROUSE AVENUE
CONSTRUCTION
ROUTE ALONG
GRIFFIN DR AND 7TH
AVE FROM I-90
PLI
M-2
R-4
ROUSE AVE7TH AVERAILROAD
GRIFFIN DR
R-5B-2M
I
N
T
E
RS
T
A
T
E
9
0
M-1
R-1
R-S
M-2
RESIDENTIAL
PARKS, OPEN SPACE
AND RECREATIONAL
PROPOSED SITE
LOCATION:
202 & 206 EAST GRIFFIN
DR
FUTURE LAND USE:
INDUSTRIAL
ROUSE AVE7TH AVERAILROAD
GRIFFIN DRINTERSTATE 90I
NT
E
R
S
T
A
T
E
9
0
PUBLIC
INSTITUTIONS
REGIONAL
COMMERCIAL &
SERVICES
NORTH BUILDING
202 E GRIFFIN DR
SOUTH BUILDING
206 E GRIFFIN DR
PARKING
PARKING SERVICE DRIVEDONOR DROP-OFFINTERNAL ROADWAYI
N
T
E
R
N
A
L
R
OAD
WAY
EAST GRIFFIN DRIVE
PEDESTRIAN CORRIDORMO
N
T
AN
A
R
AIL
L
I
N
KDATE:
This drawing is not intended nor shall it be
used for construction purposes unless the
signed professional stamp of a registered
architect employed by Comma-Q
Architecture, Inc. is affixed above.
PROJECT #:
CONSULTANTS
REVISIONS
ORIGINAL DRAWING SIZE: 24" x 36"BIM 360://CQ19-22 - Community First Griffin Place/CQ19-22 - Community First Griffin Place_Central - 2020.rvtCOMMUNITY FIRST GRIFFIN PLACE06-01-2021
A.01
19-22 HRDC BOZEMANCOVER SHEET
SITE PLAN
APPLICATION 202 & 206 EAST GRIFFIN DR, BOZEMAN MTCOMMUNITY FIRST GRIFFIN PLACE
SITE PLAN APPLICATION
NORTH BUILDING:FOOD RESOURCE CENTER
202 EAST GRIFFIN DRIVE
SOUTH BUILDING:YEAR-ROUND EMERGENCY SHELTER & RESOURCE HUB
206 EAST GRIFFIN DRIVE
MARCH 12, 2020
PROPERTY ADDRESS:
202 & 206 EAST GRIFFIN DRIVE, BOZEMAN, MT 59715
PROPERTY LEGAL DESCRIPTION:
TRACT 38 OF THE NE ANNEX (J-20) LOCATED IN NW1/4 SEC. 6, T2S, R6E
ZONING DESIGNATION:
M1 -LIGHT MANUFACTURING DISTRICT (SEE DIAGRAM)
COMMUNITY PLAN FUTURE LAND USE:
INDUSTRIAL (SEE DIAGRAM)
CURRENT LAND USE:
CR -COMMERCIAL RETAIL SALES, SERVICES, BANKS (SEE DIAGRAM)
PROJECT TEAM
OWNER:
HRDC BOZEMAN
32 S TRACY AVE
BOZEMAN, MT 59715
406.451.0006
CONTACT:
HEATHER GRENIER, CEO (hgrenier@thehrdc.org)
MARTIN JOHNSON, PROJECT MANAGER (mjohnson@thehrdc.org)
PROPERTY INFORMATION SHEET LIST
NORTH BUILDING DATA
ARCHITECT & REPRESENTATIVE:
COMMA-Q ARCHITECTURE, INC.
109 E ROUSE AVE, SUITE 1
BOZEMAN, MT 59715
406.585.1112
CONTACT:
BEN LLOYD (blloyd@henneberyeddy.com)
KELLY OLINGER (kolinger@henneberyeddy.com)
MIKE GUILIANO (mguiliano@henneberyeddy.com)
ARCHITECT:
INTRINSIK ARCHITECTURE, INC.
111 N TRACY AVENUE
BOZEMAN, MT 59715
406.582.8988
CONTACT:
PETER ANDREWS (pandrews@intrinsikarchitecture.com)
SCOTT FREIMUTH (sfreimuth@intrinsikarchitecture.com)
PLANNER:
GROUNDPRINT, LLC
280 WEST KAGY BLVD SUITE D #236
BOZEMAN, MT 59715
406.579.5844
CONTACT:
SUSAN RIGGS (sriggs@groundprint.com)
CIVIL ENGINEER:
STAHLY ENGINEERING & ASSOCIATES, INC.
851 BRIDGER DRIVE, SUITE 1
BOZEMAN, MT 59715
406.522.9526
CONTACT:
CORDELL POOL (cpool@seaeng.com)
LANDSCAPE ARCHITECT:
DESIGN.5 LANDSCAPE ARCHITECTURE
37 EAST MAIN STREET, SUITE 10
BOZEMAN, MT 59715
406.587.4873
CONTACT:
TROY SCHERER (troy@design5la.com)
HAMPTON UZZELLE (hampton@design5la.com)
ELECTRICAL ENGINEER:
CONSULTING DESIGN SOLUTIONS, INC.
7540 CHURCHILL ROAD
MANHATTAN, MT 59741
406.282.7082
CONTACT:
SCOTT ELDERS, PE (selders@cdsengineering.com)
TANNER WHITLOCK (twhitlock@cdsengineering.com)
1" = 400'-0"
ZONING & VICINITY PLAN
1" = 400'-0"
FUTURE LAND USE PLAN
COMMUNITY FIRST GRIFFIN PLACE SITE DATA
BLDG TOTAL FLOOR AREA (sf)29,725
BLDG LEVEL 1 AREA (sf) 14,500 (FOOTPRINT)
BLDG LEVEL 2 AREA (sf)15,225
SOUTH BUILDING DATA
LOT AREA (ac)5.24
LOT AREA (sf)228,254
BLDG FOOTPRINTS (sf)41,589
BLDG TOTAL FLOOR AREA (sf)68,783
FLOOR AREA RATIO: (BLDG AREA / LOT AREA)68,786 / 228,254 = 0.30
MIN. FAR:NONE
MAX. LOT COVERAGE:100% (M-1)
MIN. BLDG HEIGHT:NONE
MAX. BLDG HEIGHT:45'
MIN. FLR-TO-CLNG:NONE
MIN SETBACKS
FRONT:20'
SIDE & REAR:3'
BLDG TOTAL FLOOR AREA (sf)39,061
BLDG LEVEL 1 AREA (sf) 27,089 (FOOTPRINT)
BLDG LEVEL 2 AREA (sf) 11,972
PARKING DATA
REQUIRED:
SOUTH BUILDING: NA
NORTH BUILDING (EMERGENCY HOUSING): 170 BEDS x 37 SF = 6,290 SF
TOTAL:6,290 SF
PROVIDED:
SOUTH BUILDING:0 SF
NORTH BUILDING (EMERGENCY HOUSING): 6,390 SF*
TOTAL:6,390 SF
* SEE OPEN SPACE DIAGRAM & SOUTH BUILDING SITE PLAN FOR LOCATION.
OPEN SPACE DATA
1" = 60'-0"
Site Plan Illustration
GENERAL:
A.01 -COVER SHEET
A.02 -SITE DIAGRAMS & RELATED INFO
A1.1 -ARCHITECTURAL SITE PLAN
CIVIL:
T1.0 -CIVIL TITLE SHEET
C0.1 -CIVIL SPECIFICATIONS
EX.01 -EXISTING CONDITIONS PLAN
C0.3 -CONSTRUCTION FACILITIES PLAN
C1.0 -CIVIL SITE PLAN
C1.1 -ENLARGED CIVIL SITE PLAN NORTH
C1.2 -ENLARGED CIVIL SITE PLAN SOUTH
C2.0 -WATER PLAN
C2.1 -WATER DETAILS
C3.0 -SEWER PLAN
C3.1 -SEWER DETAILS
C4.0 -DRAINAGE PLAN
C4.1 -DRAINAGE DETAILS
C5.0 -PAVING PLAN
C5.1 -ENLARGED GRADING PLAN -NORTH
C5.2 -ENLARGED GRADING PLAN -SOUTH
C5.3 -SITE DETAILS
C5.4 -SITE DETAILS
C6.0 -SIGNAGE AND STRIPING PLAN
SITE LIGHTING:
ES1.1 -ELECTRICAL SITE PLAN
ES1.2 -ELECTRICAL SITE PLAN -PHOTOMETRIC PLAN
ES1.3 -ELECTRICAL SITE PLAN -SOUTH PHOTOMETRIC ELEVATIONS
ES1.4 -ELECTRICAL SITE PLAN -NORTH PHOTOMETRIC ELEVATIONS
ES1.5 -ELECTRICAL SITE PLAN -NORTH PHOTOMETRIC ELEVATIONS
ES1.6 -LIGHT FIXTURES
LANDSCAPING:
L 000 -LANDSCAPE SITE PLAN
L 001 -SCHEDULES
L 300 -OVERALL LANDSCAPE PLAN
L 301 -LANDSCAPE PLAN ENLARGEMENT
L 302 -LANDSCAPE PLAN ENLARGEMENT
L 303 -LANDSCAPE PLAN ENLARGEMENT
L 304 -LANDSCAPE PLAN ENLARGEMENT
L 305 -LANDSCAPE PLAN ENLARGEMENT
L 306 -LANDSCAPE PLAN ENLARGEMENT
L 307 -LANDSCAPE PLAN ENLARGEMENT
L 308 -LANDSCAPE PLAN ENLARGEMENT
L 500 -LANDSCAPE DETAILS
L 501 -LANDSCAPE DETAILS
L 600 -IRRIGATION PLAN
L 601 -IRRIGATION PLAN
L 700 -IRRIGATION DETAILS
L 701 -IRRGATION DETAILS
NORTH BUILDING ARCHITECTURAL:
A100 -SITE PLAN
A101 -SITE DETAILS
A102 -STREET SECTIONS
A201 -FIRST FLOOR PLAN
A202 -SECOND FLOOR PLAN
A203 -ROOF PLAN
A300 -ELEVATIONS
A301 -ELEVATIONS
A305 -EXTERIOR MATERIALS
A306 -EXTERIOR PERSPECTIVES
SOUTH BUILDING ARCHITECTURAL:
A1.2 -SITE PLAN -SOUTH BUILDING
A1.3 -SITE DETAILS
A1.4 -SITE DETAILS
A2.1 -FLOOR PLANS -LEVEL 1
A2.2 -FLOOR PLANS -LEVEL 2
A2.5 -ROOF PLAN
A4.1 -EXTERIOR ELEVATIONS
A4.2 -EXTERIOR ELEVATIONS
A5.0 -ARCHITECTURAL MATERIALS & RENDERINGS
REQUIRED:
NORTH BUILDING
WAREHOUSE/FOOD PROCESSING KITCHEN
ACCESSORY TO WAREHOUSE/FOOD PROCESSING
(LOBBY, INTERVIEW RMS, RELATED OFFICES)
ACCESSORY RETAIL (STORE & BREADROOM)
RESTAURANT INDOOR SEATING AREA
OFFICES
ACCESSORY SPACES
BUILDING SF TOTAL:
RESTAURANT OUTDOOR SEATING AREA
SUBTOTAL:
SOUTH BUILDING
OFFICES, CLASSROOMS, CONF & MEETING RMS
DAY-USE: LOUNGES, LOBBIES, COMMON AREAS
CIRCULATION, MECHANICAL
STORAGE
TOILET ROOMS, SHOWERS, LAUNDRY
NIGHT-USE: BEDS AND AUXILLIARY COMMON AREAS
FOR A MAXIMUM OF 170 GUESTS
BUILDING SF TOTAL:
SUBTOTAL:
TOTAL REQUIRED PARKING:
BUS STOP REDUCTION
TOTAL REQ'D (W/ REDUCTION):
SQ FT %SPACES
14,664 37%14.7
7,844 20%22.4
2,250 6% 6.4
1,035 3%20.7
3,444 9%13.8
9,824 25% 0.0
39,061 100%
348 3.5
81.5
3,878 13%15.5
2,729 9%10.9
10,799 36%0
2,175 7%0
3,534 12%0
6,610 22%42.5
29,725 100%
68.9
150.4
10%15.0
135.3
PROVIDED:
NORTH LOT (VISITORS & STAFF)
SOUTH LOT (VISITORS & STAFF)
STAFF LOT (STAFF ONLY)
FLEET (STAFF ONLY)
TOTAL PROVIDED PARKING:
57.0
53.0
19.0
6.0
135.0
REQUIRED BICYCLE PARKING:(10% OF TOTAL PARKING SPACES REQ'D)
PROVIDED BICYCLE PARKING:
(EXCEEDS THE MINIMUM STANDARD)
15.0
76.0
(38 BIKE RACKS)
ISSUED DATE:
06/01/2021
03/12/2021
06/01/2021
06/01/2021
06/01/2021
03/12/2021
06/01/2021
06/01/2021
06/01/2021
06/01/2021
06/01/2021
06/01/2021
06/01/2021
06/01/2021
06/01/2021
06/01/2021
06/01/2021
06/01/2021
06/01/2021
06/01/2021
06/01/2021
06/01/2021
06/01/2021
06/01/2021
03/12/2021
03/12/2021
03/12/2021
03/12/2021
06/01/2021
06/01/2021
06/01/2021
06/01/2021
06/01/2021
06/01/2021
06/01/2021
06/01/2021
06/01/2021
06/01/2021
06/01/2021
06/01/2021
06/01/2021
06/01/2021
06/01/2021
06/01/2021
06/01/2021
06/01/2021
06/01/2021
06/01/2021
06/01/2021
06/01/2021
06/01/2021
06/01/2021
06/01/2021
06/01/2021
06/01/2021
06/01/2021
06/01/2021
06/01/2021
06/01/2021
06/01/2021
06/01/2021
06/01/2021
06/01/2021
06/01/2021
06/01/2021
R1
R1
No. Description Date
R1 RC Submittal 6-01-21