HomeMy WebLinkAbout067 E101 Electrical Site PlanJ J J S S PROPOSED XFMR LOCATION PROPOSED XFMR LOCATION PROPOSED XFMR LOCATION PROPOSED XFMR LOCATION PROPOSED XFMR LOCATION PROPOSED XFMR LOCATION PROPOSED XFMR LOCATION PROPOSED XFMR LOCATION PROPOSED METERCENTER LOCATION PROPOSED METERCENTER LOCATION PROPOSED METERCENTER LOCATION PROPOSED METERCENTER LOCATION PROPOSED METERCENTER LOCATION PROPOSED METERCENTER LOCATION PROPOSED METERCENTER LOCATION DUAL-HEAD EV CHARGER LOCATION BUILDING 4 3-STORY ROW HOUSE, 3-PLEX BUILDING 3 3-STORY ROW HOUSE, 4-PLEX BUILDING 5 3-STORY ROW HOUSE, 4-PLEX BUILDING 6 3-STORY ROW HOUSE, 3-PLEX BUILDING 7 3-STORY ROW HOUSE, 4-PLEX BUILDING D 2-STORY FLAT, 8-PLEX BUILDING C 2-STORY FLAT, 8-PLEX BUILDING B 2-STORY FLAT, 8-PLEX BUILDING A 2-STORY FLAT, 7-PLEX CLUBHOUSE BUILDING 2 3-STORY ROW HOUSE, 4-PLEX BUILDING 1 3-STORY ROW HOUSE, 3-PLEX BUILDING 11 3-STORY ROW HOUSE, 4-PLEX BUILDING 10 3-STORY ROW HOUSE, 4-PLEX BUILDING 9 3-STORY ROW HOUSE, 3-PLEX BUILDING 8 3-STORY ROW HOUSE, 4-PLEX GAS METER PROPOSED METERCENTER LOCATION PROPOSED XFMR LOCATIONEV CHARGEREV CHARGER (FUTURE)EV CHARGER (FUTURE)EV CHARGER (FUTURE)EV CHARGER (FUTURE)EV CHARGER (FUTURE)EV CHARGER (FUTURE)A12 A1-14A12 A1-14A12 A1-14 A12 A1-14A12 A1-14 A12 A1-14 A12 A1-16 A12 A1-16A12 A1-16A12 A1-16 A12 A1-14A12 A1-16 A12 A1-16A12 A1-14A12 12' POLE 20' POLE LCP1-22 12' POLE LCP1-23 12' POLE 12' POLE LCP1-23 20' POLE LCP1-23 20' POLE LCP1-23 20' POLE 12' POLE 12' POLE 12' POLE 12' POLE 12' POLE 12' POLE 12' POLE 11"ø1"ø1"ø1"øF1 F1 F1 F1 F1 MCCH MC7 PROPOSED XFMR LOCATION 1"ø 1"øU7 TO BLDG. A. HOUSE PANEL TO CLUBHOUSE PANEL 'A2' 1 TO BLDG. B. HOUSE PANEL TO BLDG. C. HOUSE PANEL 1 1/2"øTO BLDG. D. HOUSE PANEL 1"ø 1"ø 1"ø 1"ø1 1/2"øA1-18 LCP1-24 MONUMENT SIGN WP 3/4" C. ADD HOUSE SHIELDS TO PREVENT LIGHT INTO BLDG. A. WP PROPOSED XFMR LOCATION 1"ø 1"ø 1"ø 1 "ø EV CHARGER (FUTURE)MC8 1 MCRH4 MCRH3 MCRH4 MCRH4 MCRH3 MCRH3MCRH4 MCRH4 MCRH4 WP A1-16 LCP1-23 A1-14 WP WP 22 EV CHARGER EV CHARGER EV CHARGER EV CHARGER PROPOSED METERCENTER LOCATION EV CHARGER (FUTURE)1 EV CHARGER UCH EV CHARGER (FUTURE)EV CHARGER (FUTURE)MC8 1 3 1 1/2"øPROPOSED XFMR LOCATION MCRH3 PROPOSED METERCENTER LOCATION PROPOSED METERCENTER LOCATION PROPOSED METERCENTER LOCATION PROPOSED XFMR LOCATION PROPOSED METERCENTER LOCATION MC8 PROPOSED METERCENTER LOCATION GENERAL NOTES: A. THE ELECTRICAL CONTRACTOR SHALL REVIEW AND COORDINATE WITH ARCHITECTURAL, LANDSCAPE, AND CIVIL, AND OTHER DRAWINGS PRIOR TO ROUGH-IN OF SITE ELECTRICAL EQUIPMENT AND COMPONENTS. B. ALL CONDUIT ROUTING SHOWN IS THE PREFERRED ROUTING METHOD AND DOES NOT CORRELATE TO EXACT DISTANCES. SITE CONDITIONS AND OTHER FACTORS MAY CAUSE CONDUIT ROUTING TO BE ALTERED/SHIFTED TO WORK WITHIN THE CONFINES OF THE CONSTRUCTION IN THE FIELD. C. ALL UNDERGROUND CONDUITS TO BE A MINIMUM OF 24" BELOW FINISHED GRADE. CONDUIT DEPTHS FOR UTILITIES TO BE COODINATED WITH ELECTRIC UTILITIES AND/OR JOINT TRENCH REPRESENTATIVE, WHICH ARE TYPICALLY 48" BELOW FINISHED GRADE. D. UNDERGROUND CONDUITS NEAR SEEPAGE BEDS OR UNDERGROUND CIVIL DRAINAGE SYSTEMS ARE TO BE ROUTED AROUND DRAINAGE SYSTEMS AND NOT THROUGH IT. E. CONDUITS FOR TELECOM AND FIRE ALARM INTERCONNECTS TO HAVE LONG SWEEPING BENDS AND NOT TIGHT TURNING CONDUIT BODIES. KEYED NOTES: 1. 1-1/2" POWER CONDUIT TO BE ROUTED TO NEAREST HOUSE PANEL FOR FUTURE ELECTRIC VEHICLE CHARGING STATIONS. CONDUIT TO BE BURIED A MINMUM OF 2'-0" BELOW FINISHED GRADE AND STUBBED FLUSH AT FINISHED GRADE. 2. ROUTE 1-1/2" CONDUIT FROM DUAL-HEAD EV CHARGER (JUICEBOX PRO 32) TO HOUSE PANEL. UTILIZE BRANCH CIRCUITS '18,20' AND '22,24' FOR THE BRANCH CIRCUITS FOR THE EV CHARGER. 3. ROUTE 1-1/2" CONDUIT FROM DUAL-HEAD EV CHARGER (JUICEBOX PRO 32) TO CLUBHOUSE HOUSE PANEL 'A2'. UTILIZE BRANCH CIRCUITS '36,38' AND '40,42' FOR THE BRANCH CIRCUITS FOR THE EV CHARGER. T A 39077PE FEOPRSSI NO M O N N EN GEL I REAAN NLIEC DES TERRYGORSETH 233 SOUTH PLEASANT GROVE BLVD. SUITE #105 PLEASANT GROVE, UTAH 84062 PHONE: (801) 769-3000 core@corearch.com THE INFORMATION HEREIN IS THE PROPERTY OF CORE ARCHITECTURE AND MAY NOT BE REPRODUCED WITHOUT WRITTEN CONSENT. © 2023 CORE ARCHITECTURE, LLC PROFESSIONAL STAMP SHEET NUMBER SHEET TITLE A 1 REVISIONS DATE: PROJECT #: PM / PA: PIC: PROJECT INFORMATION DESCRIPTION DATE THIS DRAWING SET IS INTENDED TO BE PRINTED IN COLOR CONSULTANT INFORMATION DRAWING SET STATUS B C D 2 3 4 5 6 PROJECT TITLE AND ADDRESS8/2/2023 10/2/2023 3:13:05 PMAutodesk Docs://23-029 Bozeman Multifamily/ELEC_BozemanMultifamily_23076_v23.rvtELECTRICAL SITE PLAN E101 2 AUG. 2023 PVE No. 23076 TLG TLG PERMIT REVIEW AND BID SETTHE BOÖTES - SITEAND CLUBHOUSEOPPORTUNITY WAY AND SOUTH11TH AVEBOZEMAN, MONTANA 59718SCALE: 1" = 30'-0" 0'15'30'60' 120' E101 1 OVERALL SITE PLAN 1 Addendum #1 10-2-2023