Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
029 A102 Building B - Floor Plan - Level 2
A A 1 1 B2 A301 D2 A301 B1 A302 C C 44 2 2 3 3 6'-9" 18'-0" 3'-2" 12'-8" 3'-2" 6'-4" 12'-6" 74'-4"79'-3"37'-1"5'-1"37'-1"11'-1 15/16" 9'-1 1/16" 11'-10" 1'-8"1'-10"1'-6"1'-6"1'-10"1'-8" 11'-10" 9'-1" 11'-2"79'-3"37'-1"5'-1"37'-1"12'-6"7'-11"11'-8"1'-8"1'-10"1'-6"1'-6"1'-10"1'-8"11'-10 3/16"9'-1"11'-1 13/16"74'-4" 5'-6" 13'-0" 6'-3" 3'-2" 12'-8" 3'-2" 6'-4" 12'-6 1/16" BD1 BD1 BD1 BD1 BD2 BD2 BD2 BD2 A BB BB B B A B A AB D D A C C C C C C C C D D D D D D B B D D D5 A351 D1 A352 B 201 3-1263 B 202 2-1000 B 204 2-1000 B 203 2-1000 MASTER BEDROOM BEDROOM MASTER BATH CLOSET BATHROOM LAUNDRYPANTRYKITCHEN CLOSETMASTER BEDROOM 1 MASTER BATH 1 CLOSET LAUNDRY BATHROOM BEDROOM 1 MASTER BATH 2 MECH MASTER BEDROOM 2 CLOSETCLOSET KITCHEN PANTRYMASTER BEDROOM BEDROOM MASTER BATH CLOSET BATHROOM LAUNDRYPANTRYKITCHEN CLOSETMASTER BEDROOM BEDROOM MASTER BATH CLOSET BATHROOM LAUNDRYPANTRYKITCHEN CLOSETBD6 BD7 BD5 BD4 BD3 BD5 BD3 BD5BD4 BD4 BD6BD5 BD3 BD5 BD3BD3 BD4BD5 BD5 BD4 BD7 BD6 BD7 BD5 BD4 BD3 BD5 BD3 BD5BD4 BD6 BD7BD5BD4 BD3 BD5 BD3BD5 BD4 LIVING LIVING LIVING LIVING MECH MECH MECH 5'-9"62'-7"6'-0" 5'-9"62'-7"6'-0" B B C A C D D D C A C B B B A D D F G E HH H HH E G F D C C B DE G F D A B B B C C D A D D C A C B B B A D D F G ED K H H H H H 1'-0"1'-0"1'-0"1'-0"N N N N N N N N Q Q Q P Q M Q Q N N N N N N M QQ N N NN N N N Q Q Q Q N N N N Q N N QQ M N N N N N Q Q M N N N N N N N N N QQ MN M N N M Q Q N N N N N Q Q N N N N N N N M N N N M QQ N N N N N N Q Q NN N N Q Q Q N 2'-9 7/16" 2'-5 3/8" 6 1/8" 3'-8" 3'-1" 11" 7'-8" 3'-3 1/2" 2'-5 1/2" 3'-8" 1'-7"1'-7" 1'-3 3/16" 2'-2 13/16"2'-8" 3'-0" 2'-0" 1'-6"1'-7"1'-7" 3'-5" 2'-5" 6" 3'-0" 3'-8 1/4" 5'-9 3/4" 6'-0 3/4" 3'-10 11/16"3'-0 5/8" 3" 2'-5" 3'-7" 1'-7"1'-7"1'-4" 2'-2" 2'-8" 3'-0"2'-0"1'-6"1'-7"1'-7" 3'-5" 2'-5" 6" 3'-1 1/16" 3'-7 1/4" 5'-9 3/4"8'-0"3'-3 1/8"1'-2 7/8"1'-1 7/8"3'-4 3/16"2'-0 9/16"1'-4 3/8"2'-6"3'-5"3'-5"2'-4"5'-3 1/2"3 1/2"5'-7"3'-4"2'-8"2'-8 3/4"4 1/4"2'-6"3'-5"3'-5"2'-6"2'-0"3'-5"3'-5"3'-0 3/16"9/16"2'-10 3/4"2'-6"3'-7 11/16"5'-6 13/16"2'-0"3'-7"5'-6" 1" 5'-6 15/16" 3'-7 9/16" 2'-6"2'-10 3/4" 3/4"2'-1" 3'-5" 3'-5" 2'-11"6"2'-0 5/16"3'-4 7/16" 4'-4 3/4" 4'-9 3/4"2'-0"2'-4 3/4"5'-4 3/4"6"2"1'-9 1/2" 2'-6" 6'-4 3/4" 4'-4 3/4" 4'-0 3/4" 6'-0" 4 3/4" 2'-6 1/2"2'-8" 4 3/4" 6'-0" 4'-0 3/4" 4'-0 3/4" 6'-3 13/16" 4'-11 15/16"2'-11 1/8"8"5'-4 3/4" 2'-4 3/4" 4'-8 15/16" 6'-3 13/16" 4'-0 3/4" 4'-0 3/4" 6'-0" 4 3/4" 2'-6"3'-2 5/8"2"2 1/2"5'-4 3/4"2'-8 1/4"2'-8" 4 3/4" 6'-0" 4'-0 3/4" 4'-0 3/4" 6'-3 13/16" 4'-11 15/16"2'-11 1/8"8"5'-4 3/4"2'-4 3/4"01.01 02.06 02.06 02.06 02.06 06.07 01.0201.02 06.01 PATIO PATIO PATIO PATIO CORRIDOR D K D D K D K D D N N 03.13 03.13 03.13 03.13 07.01 07.01 07.01 07.01 07.01 ONE-HALF-HOUR CORRIDOR (FIRE PARTITION) ONE-HOUR-FIRE-RESISTANT CONSTRUCTION (TYPE V-B) ONE-HALF-HOUR DWELLING SEPARATION (FIRE PARTITION) ONE-HOUR-FIRE-RESISTANT CONSTRUCTION (TYPE V-B) SEPARATION LEGEND A. GENERAL CONTRACTOR SHALL VERIFY ALL CONDITIONS AND DIMENSIONS PRIOR CONSTRUCTION. REPORT ANY SIGNIFICANT DISCREPANCIES TO THE ARCHITECT. B. COORDINATE INSTALLATIONS OF ALL "AFTER CONTRACT" ASSEMBLIES WITH OWNER PRIOR TO CONSTRUCTION OF ADJOINING OR RELATED STRUCTURES. C. PROVIDE 18" MINIMUM CLEAR FLOOR SPACE AT PULL SIDE OF ALL DOORS. PROVIDE 12" MINIMUM CLEAR FLOOR SPACE AT PUSH SIDE OF ALL DOORS. D. UNLESS OTHERWISE NOTED OR DIMENSIONED, LOCATE DOORS AS FOLLOWS: • MASONRY WALLS- OUTSIDE OF FRAME 8" FROM FACE OF WALL (ON BLOCK MODULE), • FRAMED WALLS-INSIDE OF JAMB 4" FROM FINISHED WALL (ADJUST FOR TILE WHERE SHOWN). E. CONCRETE FOUNDATION WALLS RETAINING EARTH TO RECEIVE TWO COATS OF BITUMINOUS DAMP PROOFING MATERIAL. F. AN AUTOMATIC FIRE SPRINKLER SYSTEM IS TO BE INSTALLED THROUGHOUT THE ENTIRE BUILDING PER NFPA 13R. G. SEE STRUCTURAL, MECHANICAL, AND ELECTRICAL SHEETS FOR ADDITIONAL INFORMATION H. SEE INTERIOR ELEVATIONS ON AI201 AND MILLWORK DETAILS ON AI551 FOR FINISHES OF MILLWORK BASES, AND COUNTERTOPS SEE SHEETS A151, A152 FOR REFLECTED CEILING PLAN INFORMATION. I. SEE SHEETS AI101, AI102, FOR FINISH INFORMATION. CONFIRM FINISHES WITH OWNER PRIOR TO ORDERING. J. SEE A601, A602, AND A603 FOR DOOR AND WINDOW INFORMATION. K. GENERAL CONTRACTOR SHALL REVIEW AND APPROVE ALL APPLIANCES WITH OWNER PRIOR TO PURCHASING EQUIPMENT AND FABRICATING MILLWORK. L. SEE THE SPECIFICATION FOR ADDITIONAL INFORMATION. M. SEE G000 FOR LEGENDS, SYMBOLS, ABBREVIATIONS AND OTHER ARCHITECTURAL GENERAL INFORMATION. N. SEE G003 FOR WALL TYPES. O. PROVIDE BACKING/BLOCKING FOR WALL MOUNTED ITEMS-INCLUDING GRAB BARS, HANDRAILS, SIGNAGE AND EQUIPMENT AS REQUIRED. P. TILE IS TO BE SET OVER CEMENTITIOUS BACKER BOARD UNDERLAYMENT. RECESS SLAB AS/IF REQUIRED. VERIFY WITH OWNER. Q. DO NOT SCALE DRAWINGS. GENERAL NOTES SCALE:3/16" = 1'-0"A102 FLOOR PLAN - LEVEL 2D2 233 SOUTH PLEASANT GROVE BLVD. SUITE #105 PLEASANT GROVE, UTAH 84062 PHONE: (801) 769-3000 core@corearch.com NOT FOR CONSTRUCTION THE INFORMATION HEREIN IS THE PROPERTY OF CORE ARCHITECTURE AND MAY NOT BE REPRODUCED WITHOUT WRITTEN CONSENT. © 2023 CORE ARCHITECTURE, LLC PROFESSIONAL STAMP SHEET NUMBER SHEET TITLE A 1 REVISIONS DATE: PROJECT #: PM / PA: PIC: PROJECT INFORMATION DESCRIPTION DATE THIS DRAWING SET IS INTENDED TO BE PRINTED IN COLOR CONSULTANT INFORMATION DRAWING SET STATUS B C D 2 3 4 5 6 PROJECT TITLE AND ADDRESS9/1/2023 11:31:00 AMAutodesk Docs://23-029 Bozeman Multifamily/23-029 Bozeman Multifamily Building B.rvtFLOOR PLAN - LEVEL 2 A102 28 JULY 2023 23-029 MRR MMA PERMIT REVIEW & BID DOCUMENTSTHE BOÖTES -BUILDING BOPPORTUNITY WAY AND SOUTH11TH AVEBOZEMAN, MONTANA 59718KEYNOTES 01.01 ADA COMPLIANT SEMI RECESSED FIRE EXTINGUISHER CABINET WITH 2A10BC FIRE EXTINGUISHER INSIDE. SEE DETAIL D1/A701. 01.02 ADA COMPLIANT "STAIRWAY" SIGN. SEE SHEET G002. 02.06 42" HIGH GUARDRAIL. SEE DETAILS ON SHEET A504. 03.13 STRUCTURAL COLUMN. SEE STRUCTURAL. 06.01 PRIMARY AND SECONDARY ROOF DRAINS. MOUNT ROOF DRAINS 2'-0" MINIMUM FROM CLOSEST VERTICAL SURFACE. TIE PRIMARY ROOF DRAINS TO STORM DRAIN SYSTEM. PROVIDE PIPING FOR SECONDARY DRAINS TO BRASS SCUPPERS AT EXTERIOR WALLS AS SHOWN. MOUNT BRASS SCUPPERS 6" ABOVE TRUSS BEARING. SEE DETAILS ON A701. 06.07 ROOF ACCESS HATCH AND LADDER. SEE DETAIL B1/A701. 07.01 CAST NICKEL MATTE BLACK DOWNSPOUT NOZZLE WITH ANCHOR FLANGE. SEE APT DETAIL A6/A701. N