Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
027 A302 Building A - Building Sections
ONE-HALF-HOUR CORRIDOR (FIRE PARTITION) ONE-HOUR-FIRE-RESISTANT CONSTRUCTION (TYPE V-B) ONE-HALF-HOUR DWELLING SEPARATION (FIRE PARTITION) ONE-HOUR-FIRE-RESISTANT CONSTRUCTION (TYPE V-B) SEPARATION LEGEND GENERAL NOTES A. GENERAL CONTRACTOR SHALL VERIFY ALL CONDITIONS, DIMENSIONS, AND ASSEMBLIES PRIOR TO CONSTRUCTION. REPORT ANY SIGNIFICANT DISCREPANCIES TO THE ARCHITECT. B. AN AUTOMATIC FIRE SPRINKLER SYSTEM IS TO BE INSTALLED THROUGHOUT THE ENTIRE BUILDING PER NFPA 13R. C. CONCRETE FOUNDATION WALLS RETAINING EARTH TO RECEIVE TWO COATS OF BITUMINOUS DAMP PROOFING MATERIAL. D. MINIMUM ROOF CLASSIFICATION TO BE CLASS 'C'. E. MINIMUM ROOF SLOPE TO BE 1/4" PER FOOT. F. INSULATE ENTIRE FLAT ROOF AREAS WITH R-49 POLYISOCYANURATE ABOVE ROOF DECKING. G. EXPOSED FOUNDATION WALLS TO RECEIVE RUBBED FINISH. H. SEE ENGINEERING SHEETS FOR ADDITIONAL INFORMATION. I. MASONRY TO HAVE CONTROL JOINTS AT 30'-0" O.C. MAXIMUM. J. NOT ALL INTERIOR ELEMENTS ARE NOTED FOR CLARITY. SEE WALL SECTIONS, DETAILS, AND WALL TYPES FOR ADDITIONAL INFORMATION. 100'-0" LEVEL 1 FLOOR 111'-2 3/4" LEVEL 2 FLOOR 132'-6" TOP OF ROOF 96'-0" T.O. FOOTING 1 121'-2 7/8" TRUSS BEARING D2 A301 423 B2 A301 MASTER BEDROOM 2 CLOSET MASTER BATH 2 KITCHEN MASTER BEDROOM 2 CLOSET MASTER BATH 2 KITCHEN CHEMICAL SPA MECHANICAL STORAGE KITCHEN MASTER BATH CLOSET MASTER BEDROOM A351 D1 A352 D5 4'-0"06.03 09.06 09.05 09.06 09.06 03.05 06.23 233 SOUTH PLEASANT GROVE BLVD. SUITE #105 PLEASANT GROVE, UTAH 84062 PHONE: (801) 769-3000 core@corearch.com NOT FOR CONSTRUCTION THE INFORMATION HEREIN IS THE PROPERTY OF CORE ARCHITECTURE AND MAY NOT BE REPRODUCED WITHOUT WRITTEN CONSENT. © 2023 CORE ARCHITECTURE, LLC PROFESSIONAL STAMP SHEET NUMBER SHEET TITLE A 1 REVISIONS DATE: PROJECT #: PM / PA: PIC: PROJECT INFORMATION DESCRIPTION DATE THIS DRAWING SET IS INTENDED TO BE PRINTED IN COLOR CONSULTANT INFORMATION DRAWING SET STATUS B C D 2 3 4 5 6 PROJECT TITLE AND ADDRESS8/3/2023 12:24:31 PMAutodesk Docs://23-029 Bozeman Multifamily/23-029 Bozeman Multifamily Building A.rvtBUILDING SECTIONS A302 28 JULY 2023 23-029 MRR MMA PERMIT REVIEW & BID DOCUMENTSBOÖTES - BUILDING AOPPORTUNITY WAY AND SOUTH11TH AVEBOZEMAN, MONTANA 59718KEYNOTES 03.05 CONCRETE SLAB OVER 4" OVER 10 MIL VAPOR RETARDER OVER FREE DRAINING GRAVEL. SEE STRUCTURAL FOR SLAB THICKNESS AND REINFORCING. 06.03 SINGLE-PLY ROOF MEMBRANE OVER ROOF 1" POLYISOCYANURATE OVER ONE LAYER ATLAS FR-10 SLIP SHEET OVER STRUCTURAL WOOD SHEATHING. MINIMUM ROOF CLASSIFICATION TO BE AS NOTED ON THE CODE ANALYSIS. INSTALL PER MANUFACTURER'S REQUIREMENTS FOR MECHANICALLY FASTENED SYSTEM. FULLY ADHERE TO VERTICAL SURFACES AND CONTINUOUS BENEATH METAL PARAPET CAP AND DOWN FRONT SIDE 1" MIN. SINGLE-PLY TPO ROOFING. WHITE, 60 MIL. 15 YEAR WARRANTY MATERIALS. 06.23 ARCHITECTURAL ASPHALT SHINGLES OVER 30# FELT WITH ICE AND WATER SHIELD OVER PLYWOOD ROOF SHEATHING. SEE STRUCTURAL. INSTALL PER MANUFACTURER'S RECOMMENDATIONS. 09.05 1" GYPCRETE OVER SHEATHING GLUED AND NAILED OVER FLOOR JOIST. SEE FRAMING PLANS FOR SIZE AND SPACING. 09.06 WOOD BEAM OR HEADER. SEE FRAMING PLANS. SCALE: 3/16" = 1'-0"A302 BUILDING SECTION 3B2