HomeMy WebLinkAboutTIS correspondence1 Mikaela Schultz From:Lance Lehigh Sent:Wednesday, August 2, 2023 11:33 AM To:Mikaela Schultz Subject:FW: [EXTERNAL]23168 The Boötes - Traffic Impact Study Waiver FYI City of Bozeman MT Lance Lehigh, PE, CFM | Engineer III From: Taylor Lonsdale <tlonsdale@BOZEMAN.NET> Sent: Tuesday, July 25, 2023 4:12 PM To: Elizabeth Mans <emans@wwcengineering.com> Cc: Lance Lehigh <llehigh@BOZEMAN.NET>; Jacob Doesschate <jdoesschate@BOZEMAN.NET> Subject: RE: [EXTERNAL]23168 The Boötes - Traffic Impact Study Waiver Good a@ernoon Liz. Thank you for reaching out to me on this. The previous TIS covered approximately 48 acres of potenCal development. It assumed 183 single family dwelling units or approximately 3.8 DU/acre. The proposed Boötes site plan sits on approximately 4.8 acres and proposes 71 units or almost 15 DU/acre. While the trip generaCon per unit is lower, with the increased density proposed, the overall trip generaCon for the area covered by the original TIS would be significantly greater if it conCnues to develop out at the higher density. The original TIS calculate 181 PM peak hour trips or 3.8 trips per acre. The proposed Boötes development will generate 8.3 trips per acre. It is important to note that future development on the remaining lots within Allison Ph 4 will be evaluated individually and the cumulaCve impact will be considered. If development at higher densiCes conCnues with future applicaCons, a revised TIS will be required. AddiConally, the original TIS from 2019 is starCng to be dated and depending on Cming, future applicaCons may be required to update the TIS simply based on the Cme since the original TIS was completed. The trip generaon for the Boötes remains within th e overall trips evaluated in the TIS for Allison Ph 4 and the City of Bozeman therefore grants a waiver of the required TIS for this applicaon. I have copied Jake Doesschate on this email. He is the Development Review Coordinator for this project. If you have further quesCons please be sure to route them through Jake. Thank you. Taylor Lonsdale, PE | Transportation Engineer City of Bozeman O: 406.582.2286 pronouns: he\him\his From: Elizabeth Mans <emans@wwcengineering.com> Sent: Thursday, July 20, 2023 10:56 AM To: Taylor Lonsdale <tlonsdale@BOZEMAN.NET> Subject: [EXTERNAL]23168 The Boötes - Traffic Impact Study Waiver CAUTION: This email originated from outside of the organization. Do not click links or open attachments unless you recognize the sender and know the content is safe. 2 Hi Taylor, I wanted to inquire if a new Traffic Impact Study (TIS) will need to be included in the Site Plan submiPal of The Boötes development project. The Boötes is located within the Allison Subdivision Phase 4 which had a TIS completed in March 2019. The TIS assumed 183 single-family dwelling at a trip generaCon rate of 0.99 trips/unit for PM Peak Hour (Trip GeneraCon Manual, 10th EdiCon) resulCng in 181 PM Peak Hour trips. The proposed Boötes development contains 71 mulC-family units, using a trip generaCon rate of 0.56 trips/unit this would equate to 39.76 PM Peak Hour trips. Currently there are 40 single-family lots subdivided within Allision Subdivision, the Boötes development proposes 71 mulC-family units, and including the suspected occupancy levels of the future phases, the assumed 183 single-family dwellings in the TIS remains an accurate esCmaCon. Even if the subdivision ends up supporCng more than 183 single- family dwellings, the impact on the TIS will be insignificant as the assumed trip generaCon rate of 0.99 trips/unit esCmated a worst case scenario PM Peak hour Trips more severe than what would be calculated with the MulC-family Housing (low rise) trip generaCon rate of 0.56 trips/unit. I have included the Allison Subdivision Phase 4 TIS as a reference as well as the The Böotes concept plan narraCve. Please let me know if you have any quesCons or need any other informaCon. Thanks, Liz Liz Mans, EI | Associate Civil Engineer She/her 895 Technology Blvd, Suite 203 | Bozeman, MT 59718 Tel 406-586-0262 emans@wwcengineering.com