HomeMy WebLinkAbout022 Fire Department CC Approval Letter August 31, 2023 Chris Budeski Madison Engineering LLC 895 Technology Blvd, Ste 203 Bozeman, MT 59718 RE: Concurrent Construction for 23235 The Bootes Site Plan Mr. Budeski, Per review of submittal documents dated August 31, 2023. I approve concurrent construction for The Bootes Site Plan project. The following requirements must be met for this approval to be binding. 1. 365/24/7 access to working hydrants and acceptable, approved water source 2. Staging plan for location of construction materials, temporary work trailer, and any additional combustible materials 3. Ingress and egress routes for emergency services 4. All weather site access 5. Knox locks for fenced or gated areas Scott Mueller Deputy Fire Chief-Prevention-Fire Marshal Bozeman Fire Department 300 E Oak St, Bozeman, MT 59715 Office (406) 582-2353 Mobile (406) 589-6271 CC: Mikaela Schultz, Nakeisha Lyon