Loading...
HomeMy WebLinkAbout073 Plumbing Waste-21 1 2 2 A A B B 4 4 5 5 6 6 7 7 8 8 9 9 10 10 C C D D E E F F 3 3 2A 2A 1 1 2 2 A A B B 4 4 5 5 6 6 7 7 8 8 9 9 10 10 C C D D E E F F 3 3 2A 2A ? WC-1 LAV-1 3" RD3" RD ROUTE 3" RD TO SURGE TANK BELOW PARKING. ROUTE 3" RD TO SURGE TANK BELOW PARKING. ROUTE 3" RD TO SURGE TANK BELOW PARKING. ROUTE 3" RD TO SURGE TANK BELOW PARKING.3" RDOROUTE 3" RD TO SURGE TANK BELOW PARKING. ROUTE 3" RD TO SURGE TANK BELOW PARKING. ROUTE 3" RDO DOWN TO SURGE TANK BELOW PARKING. 3" RDO3" RDO2" RDO ROUTE 3" RD TO SURGE TANK BELOW PARKING. ROUTE 3" RD TO SURGE TANK BELOW PARKING. 2" RDO OVERFLOW LAMBSTONGUE OVERFLOW LAMBSTONGUE OVERFLOW LAMBSTONGUE BIM FILE PATH: SHEET NO.: TITLE: COPYRIGHT 2021 SMA, P.C. REVISIONS: KEYMAP: ARCHITECT SEAL: PROJECT: PROJECT LOCATION: PREPARED FOR: LOGO: CONSULTANT: PROJECT NUMBER: DRAWN BY: CHECKED BY: TEAM: PHASE: DATE: PROJECT NUMBER:Plot Date:THESE DRAWINGS ARE INTENDED TO BE PRINTED IN COLOR HELENA P: 406-442-4933 BOZEMAN P: 406-219-2216 www.sma.design C:\Users\mmelgar\Documents\BG MILL MEP CENTRAL v22_mmelgarKNS36.rvt 8/11/2022 4:23:17 PMP2.1 22-024 2022-08-11 PLUMBING WASTE AND VENT Author Checker BG MILL CONDOMINIUMS 22-024 714 EAST MENDENHALL SREET BOZEMAN, MT 59715 SPR SUBMITTAL P2.1 SCALE: 1/8" = 1'-0" 1- MAIN FLOOR PLAN - DWV 1 N No.Date Revision Description