HomeMy WebLinkAbout073 Plumbing Waste-21
1
2
2
A
A
B B
4
4
5
5
6
6
7
7
8
8
9
9
10
10
C C
D D
E E
F F
3
3
2A
2A
1
1
2
2
A
A
B B
4
4
5
5
6
6
7
7
8
8
9
9
10
10
C C
D D
E E
F F
3
3
2A
2A
?
WC-1
LAV-1
3" RD3" RD
ROUTE 3" RD TO SURGE
TANK BELOW PARKING.
ROUTE 3" RD TO SURGE
TANK BELOW PARKING.
ROUTE 3" RD TO SURGE
TANK BELOW PARKING.
ROUTE 3" RD TO SURGE
TANK BELOW PARKING.3" RDOROUTE 3" RD TO SURGE
TANK BELOW PARKING.
ROUTE 3" RD TO SURGE
TANK BELOW PARKING.
ROUTE 3" RDO DOWN TO
SURGE TANK BELOW
PARKING.
3" RDO3" RDO2" RDO
ROUTE 3" RD TO SURGE
TANK BELOW PARKING.
ROUTE 3" RD TO SURGE
TANK BELOW PARKING.
2" RDO
OVERFLOW LAMBSTONGUE
OVERFLOW LAMBSTONGUE
OVERFLOW LAMBSTONGUE
BIM FILE PATH:
SHEET NO.:
TITLE:
COPYRIGHT 2021 SMA, P.C.
REVISIONS:
KEYMAP:
ARCHITECT SEAL:
PROJECT:
PROJECT LOCATION:
PREPARED FOR:
LOGO:
CONSULTANT:
PROJECT NUMBER:
DRAWN BY:
CHECKED BY:
TEAM:
PHASE:
DATE:
PROJECT NUMBER:Plot Date:THESE DRAWINGS ARE INTENDED
TO BE PRINTED IN COLOR
HELENA
P: 406-442-4933
BOZEMAN
P: 406-219-2216
www.sma.design
C:\Users\mmelgar\Documents\BG MILL MEP CENTRAL v22_mmelgarKNS36.rvt
8/11/2022 4:23:17 PMP2.1
22-024
2022-08-11
PLUMBING WASTE AND VENT
Author
Checker
BG MILL CONDOMINIUMS
22-024
714 EAST MENDENHALL SREET
BOZEMAN, MT 59715
SPR SUBMITTAL
P2.1 SCALE: 1/8" = 1'-0"
1- MAIN FLOOR PLAN - DWV
1
N
No.Date Revision Description